What an assessment for RIICBM307E must cover

93 assessable components: 6 elements (33 performance criteria), 11 performance evidence and 46 knowledge evidence requirements, plus 3 foundation skills. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Plan and prepare to construct formwork and falsework

  • 1.1Obtain, interpret, clarify and confirm work instructions
  • 1.2Access, interpret and apply documentation required to construct formwork and false work on concrete bridges and confirm work activity is compliant
  • 1.3Obtain and interpret emergency procedures and identify steps required to respond to emergencies
  • 1.4Select and wear personal protective equipment according to site requirements
  • 1.5Confirm and identify requirements for complying with environmental protection, safety and traffic management signage requirements
  • 1.6Identify, address and report environmental issues, potential hazards and risks
  • 1.7Select plant, tools and equipment required to carry out tasks and check for faults
  • 1.8Identify, confirm, and locate materials required for work application

2 Prepare for formwork and false work erection

  • 2.1Identify and confirm location and design of formwork and false work according to job requirements
  • 2.2Place key set out locations according to job requirements
  • 2.3Prepare work area and materials for formwork and false work erection
  • 2.4Assemble formwork shutters according to job requirements
  • 2.5Erect formwork support system sequentially according to job requirements
  • 2.6Check scaffolding and hand railing as required
  • 2.7Place bracing of formwork according to job requirements
  • 2.8Set support system to specified height level, line and tolerance according to job requirements

3 Erect formwork

  • 3.1Fabricate, position and fix formwork for beams, drop panels and cantilevers into place according to job requirements
  • 3.2Assemble, erect and fix formwork for walls into place, plumb and to specified tolerance according to job requirements
  • 3.3Fabricate, position and fix soffit formwork into place according to job requirements
  • 3.4Fix edge boxing to formwork in specified position according to job requirements and plumb to alignment.
  • 3.5Brace formwork
  • 3.6Install cast-ins, inserts and penetration blocks to locations according to job requirements

4 Inspect formwork

  • 4.1Inspect erected formwork and formwork support system, including for safety and quality of work
  • 4.2Remove waste material according to site requirements
  • 4.3Apply release agent to formwork
  • 4.4Monitor formwork and support system during concrete pour

5 Strip of formwork

  • 5.1Obtain approval to remove formwork and false work support from required authorities
  • 5.2Remove edge boxing and braces, de-nail, clean and store according to site requirements
  • 5.3Back off support system to specified height to loosen soffit decking according to job requirements
  • 5.4Remove formwork, denail and relocate or store according to job and site requirements
  • 5.5Select and install back propping system as required

6 Conduct clean-up activities

  • 6.1Clear work area and dispose of or recycle materials according to site requirements
  • 6.2Clean, check, perform maintenance on and store plant, tools and equipment according to manufacturer specifications and site requirements

Performance evidence

  • construct formwork and false work on concrete bridges on at least two occasions, including:
  • preparing for formwork erection
  • erecting and dismantling formwork and false work on concrete multi-span bridges with a minimum length of twenty metres for each, including:
  • casting in situ decks
  • concrete footings, pile caps and abutments
  • piers and headstocks
  • locate and apply required legislation, documentation, policies and procedures
  • identify, report and record hazards and risks
  • work with others to construct formwork and false work on concrete bridges that meets required outcomes, including:
  • communicating with others to receive and clarify work instructions
  • using communication techniques and equipment, including signage to advise others of work activity and exclusion zones

Knowledge evidence

  • legislation required to construct formwork and false work on concrete bridges
  • policies, procedures and documentation required to construct formwork and false work on concrete bridges, including those relating to:
  • hazard and risk management
  • emergency response
  • work health and safety
  • site and equipment safety
  • environmental protection
  • waste management
  • communication techniques and equipment
  • working in confined spaces
  • working at heights and over water
  • project quality requirements
  • operational, maintenance and basic diagnostic procedures
  • site isolation and traffic control responsibilities
  • job plans and specifications
  • site requirements
  • manufacturer specifications for required plant and equipment
  • workplace reporting requirements
  • principles and techniques required to construct formwork and false work on concrete bridges, including those relating to:
  • key set out locations, including:
  • points
  • lines
  • profiles
  • grids
  • bracings
  • soffits
  • bridge construction and sequencing
  • steel reinforcement
  • concrete
  • bracing and loading
  • release agents
  • back propping systems
  • cast-ins, inserts and penetration blocks
  • structural characteristics of reinforced concrete
  • interpreting engineering drawings
  • types, characteristics, technical capabilities and limitations of plant and equipment required to construct formwork and false work on concrete bridges including:
  • power saws
  • nail guns
  • string lines
  • levelling equipment
  • compressors
  • marking equipment
  • scaffolding
  • materials safety data sheet (SDS) compliance processes
  • components of job safety analyses (JSAs), job safety environmental analyses (JSEAs), and safe work method statements (SWMs)
  • civil construction terminology related to constructing formwork and false work on concrete bridges

Foundation skills

  • Numeracy: Calculates basic measurements, including mass and dimensions
  • Oral communication: Identifies and interprets information from verbal instructions Conveys information and instructions to others verbally
  • Self-management: Monitors and minimises own exposure to worksite risks and hazards during work activities

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing RIICBM307E

What does an assessment tool for RIICBM307E need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for RIICBM307E needs to address all 93 unit components: 6 elements with 33 performance criteria, 11 performance evidence requirements, 46 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for RIICBM307E?

Auditori pulls the current release of RIICBM307E from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for RIICBM307E — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing RIICBM307E assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of RIICBM307E, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your RIICBM307E assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate RIICBM307E free