What an assessment for RIICBM306E must cover

35 assessable components: 5 elements (22 performance criteria), 4 performance evidence and 7 knowledge evidence requirements, plus 2 foundation skills. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Plan and prepare to undertake concreting work

  • 1.1Obtain, interpret, clarify and confirm work instructions
  • 1.2Access, interpret and apply documentation required to undertake concreting work on concrete bridges and confirm work activity is compliant
  • 1.3Obtain and interpret emergency procedures, and identify steps required to respond to emergencies
  • 1.4Select and wear personal protective equipment according to site requirements
  • 1.5Confirm and identify requirements for complying with environmental protection, safety and traffic management signage requirements
  • 1.6Identify, address and report hazards, risks and environmental issues
  • 1.7Select plant, tools and equipment to carry out tasks and check for faults
  • 1.8Identify, confirm, and locate materials required for work application

2 Place concrete

  • 2.1Identify and confirm location and design of concrete work according to job requirements
  • 2.2Remove debris and waste from pour area according to site requirements
  • 2.3Apply release agent according to job requirements
  • 2.4Pour concrete in horizonal layers up to levels indicated by markers, level pegs or lines
  • 2.5Implement methods to avoid segregation
  • 2.6Consolidate poured concrete according to job requirements

3 Finish concrete

  • 3.1Screed concrete to required levels using appropriate straight edged tool or formwork mounted screeds, according to job requirements
  • 3.2Float screeded concrete surface according to job requirements
  • 3.3Define control and structural joints and finish edges
  • 3.4Finish concrete surface according to job requirements

4 Cure concrete

  • 4.1Perform maintenance on curing method on concrete surface according to job requirements
  • 4.2Barricade area according to site requirements to protect concrete during curing

5 Conduct clean-up activities

  • 5.1Clear work area and dispose of or recycle materials according to site requirements
  • 5.2Clean, check, perform maintenance on and store plant, tools and equipment according to manufacturer specifications and site requirements

Performance evidence

  • undertake concreting work on concrete bridges on at least two occasions, including: • pouring and consolidating poured concrete using compaction or vibration methods • completing concrete placing, finishing and curing to the finished form, on a concrete multi-span bridge with a minimum length of twenty metres for each: • casting in situ decks • concrete footings/pile caps/abutments • piers and headstocks.
  • locate and apply required legislation, documentation, policies and procedures
  • identify, report and record hazards and risks
  • work with others to undertake and complete concreting work on concrete bridges that meets required outcomes, including: • communicating with others to receive and clarify work instructions • using communication techniques and equipment to convey information to others, including signage to advise others of work activity and exclusion zones.

Knowledge evidence

  • legislation required to undertake concreting work on concrete bridges
  • policies, procedures and documentation required to undertake concreting work on concrete bridges, including those relating to: • hazard and risk management • emergency response • work health and safety • site and equipment safety • environmental protection • waste management • communication techniques and equipment • working in confined spaces • working at heights and over water • site isolation and traffic control responsibilities • operational, maintenance and basic diagnostic procedures • project quality requirements • job plans and specifications • site requirements • manufacturer specifications for required plant and equipment • workplace reporting requirements
  • principles and techniques required to undertake concreting work on concrete bridges, including those relating to: • bridge construction and sequencing • steel reinforcement • concrete characteristics • concrete work, including: • cast in-situ concrete decks • piers and headstocks • footings, pile caps and abutments • cast in-situ girders • structural technology • methods to avoid segregation • concrete screeding • concrete finish • concrete curing, including: • flooding • coating with membrane or plastic sheeting • consolidation methods, including: • compaction • vibration • interpreting engineering drawings
  • types, characteristics, technical capabilities and limitations of plant and equipment required to undertake concreting work on concrete bridges including: • floats • edging tools • tremmies • vibrators • short handle shovels
  • materials safety data sheets (SDS) compliance processes
  • components of job safety analyses (JSAs), job safety environmental analyses (JSEAs), and safe work method statements (SWMs)
  • civil construction terminology relating to undertaking concreting work on concrete bridges.

Foundation skills

  • Oral communication: Identifies and interprets information from verbal instructions Conveys information and instructions to others verbally
  • Self-management: Monitors and minimises own exposure to worksite risks and hazards during work activities

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing RIICBM306E

What does an assessment tool for RIICBM306E need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for RIICBM306E needs to address all 35 unit components: 5 elements with 22 performance criteria, 4 performance evidence requirements, 7 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for RIICBM306E?

Auditori pulls the current release of RIICBM306E from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for RIICBM306E — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing RIICBM306E assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of RIICBM306E, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your RIICBM306E assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate RIICBM306E free