MARG009 — Manage an engine room and small engineering team in emergencies
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for MARG009 must cover
56 assessable components: 5 elements (27 performance criteria), 10 performance evidence and 19 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Organise engine room for departure
- 1.1Fuels, lubricating oil, liquefied petroleum gas (LPG) and refrigeration gas required for proposed voyage are obtained
- 1.2Flammable and explosive materials are stowed and managed according to regulatory and organisational requirements
- 1.3Planned maintenance tasks to be completed during proposed voyage are verified
- 1.4Spares and consumables required for proposed voyage are acquired
- 1.5Work health and safety (WHS)/occupational health and safety (OHS) hazards in engine room are identified, risks are assessed and corrective actions are taken and recorded according to organisational practices
2 Manage daily engine room routine
- 2.1Engine room routine is organised and duties for engineering team are defined
- 2.2WHS/OHS roles and responsibilities of engineering team are defined
- 2.3WHS/OHS procedures are communicated to engine room crew
- 2.4WHS/OHS issues raised are acknowledged and resolved promptly
- 2.5Permits for hot work, confined space entry and other high-risk activities are completed according to organisational and regulatory requirements
- 2.6Engineering team members are allocated daily maintenance tasks according to planned maintenance system or breakdown maintenance
- 2.7Procedures for collecting and sorting engine room waste from cleaning and maintenance tasks are defined and communicated to engineering team
3 Manage engineering team in an emergency
- 3.1Performance expectations in an emergency are communicated clearly to engineering team
- 3.2Effective communication in an emergency is developed and maintained with team and management
4 Manage engineering procedures in port
- 4.1Planned and breakdown maintenance activities to be conducted in port are arranged to facilitate operational efficiency of vessel
- 4.2Permits for hot work, confined space entry and other high-risk activities are completed according to organisational and regulatory requirements
- 4.3Sound business relationships with contractors are established and maintained to ensure effective communication and early identification of potential service delivery problems
- 4.4Contractual disputes with contractors that arise are managed according to contractual requirements using established mediation mechanisms
- 4.5Removal of sludge, sewage and engine room waste is arranged
- 4.6Procedures for removal of sludge, sewage and engine room waste are followed according to regulatory requirements and organisational procedures
5 Manage engineering emergencies
- 5.1Information is received regarding scope and severity of emergency
- 5.2Information is analysed to determine appropriate response
- 5.3WHS/OHS risks are identified and actions are taken according to organisational procedures
- 5.4Actions are taken to reduce effect of incident according to organisational procedures
- 5.5Incident is monitored for any changes and appropriate responses are taken according to organisational procedures
- 5.6Communications are established with support services and relevant stakeholders, where appropriate
- 5.7Reports and debriefings are completed according to organisational procedures
Performance evidence
- logbook entries
- monitoring of equipment in engine room
- regular inspection of engine room
- responding to alarms
- watchkeeping arrangements
- developing effective maintenance planning documents
- displaying sound personnel management
- leading and communicating with team members in an emergency
- planning, organising and monitoring team member activity
- writing reports
Knowledge evidence
- consultation and communication techniques and strategies
- hazards associated with flammable/explosive materials
- hazards of gases, including accidental release in a confined space
- managing emergencies
- manufacturer instructions, including all work health and safety (WHS)/occupational health and safety (OHS) requirements and safety data sheets (SDS)/material safety data sheets (MSDS)
- maritime regulations, rules and instructions
- organisational policies and procedures
- principles and techniques involved in leadership and mentoring
- principles and techniques involved in performance management systems
- regulations for stowing and managing flammable/explosive materials, including chemicals
- regulations for stowing and managing flammable/explosive materials, including diesel
- regulations for stowing and managing flammable/explosive materials, including gases
- regulations for stowing and managing flammable/explosive materials, including liquefied petroleum gas (LPG)
- regulations for stowing and managing flammable/explosive materials, including lubricants
- regulations for stowing and managing flammable/explosive materials, including petrol
- relevant legislation especially in regard to WHS/OHS and environmental issues
- requirements for confined space entry and hot work permits
- safety management systems (SMS)
- testing of gas detectors
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing MARG009
What does an assessment tool for MARG009 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for MARG009 needs to address all 56 unit components: 5 elements with 27 performance criteria, 10 performance evidence requirements, 19 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for MARG009?
Auditori pulls the current release of MARG009 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for MARG009 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing MARG009 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of MARG009, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
Your MARG009 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate MARG009 free