CPCSHP3005 — Apply and trim decorative additions to shopfittings and components
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for CPCSHP3005 must cover
55 assessable components: 3 elements (17 performance criteria), 3 performance evidence and 35 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Plan and prepare to apply decorative additions.
- 1.1Identify, read and interpret decorative additions from job requirements, plans and specifications.
- 1.2Determine type of decorative addition to be applied and calculate material quantities using measurements and formulas.
- 1.3Identify worksite hazards and conditions and implement risk control measures following work health and safety and environmental requirements.
- 1.4Determine job priorities and sequence job tasks in consultation with others in the workplace.
- 1.5Obtain materials, check for conformity and safely handle and locate materials ready for use.
- 1.6Establish appropriate method for fixing decorative additions to the substrate.
- 1.7Select, fit and use personal protective equipment (PPE) required for the task.
- 1.8Select tools and equipment for the task, check for serviceability, and rectify and report faults.
2 Fix and finish decorative additions.
- 2.1Set out position of decorative additions in accordance with plan and job description and confirm with client.
- 2.2Draw a plan to develop a true mitre for a compound angle and a mitre of different material widths and calculate angles by dissection.
- 2.3Set out, mark and cut to length decorative additions.
- 2.4Follow specifications to cut curved decorative additions work.
- 2.5Fit decorative additions and use established method to fix to substrate.
- 2.6Trim and finish decorative additions to meet organisational quality requirements.
3 Clean up.
- 3.1Clean tools and equipment, check for serviceability and report damage or faults.
- 3.2Clear work area and dispose of, reuse or recycle materials following workplace and environmental requirements.
- 3.3Store and secure tools and equipment following workplace procedures.
Performance evidence
- decorative timber panelling with a minimum of two square metres to a section of wall
- a minimum of two square metre extruded section border to a wall
- a timber or aluminium frame for a mirror that is at least 1200 mm x 600 mm
Knowledge evidence
- shopfitting regulations, codes and standards
- organisation’s quality assurance requirements relating to the application and trimming of decorative additions to shopfittings and components
- sustainable shopfitting practices
- content of and terms, symbols and conventions used in working drawings and specifications
- workplace processes and procedures and environmental requirements
- characteristics, applications and limitations of materials commonly used for decorative and ornamental additions to shop components
- decorative panelling
- extruded sections and mouldings
- mirrors
- adhesives and double-sided tapes
- fixings and fastenings
- acrylic
- glass
- laminates
- manufactured board
- workplace safety
- job safety and environmental analysis (JSEA)
- safe work method statements (SWMSs)
- safety data sheets (SDSs)
- hazardous manual tasks
- exposure to excessive noise
- exposure to dust
- electrical safety
- emergency procedures (evacuation, location and use of firefighting equipment, first aid)
- safety of public, visitors and others in the workplace
- processes and techniques for applying and trimming decorative additions
- efficient cutting strategies to minimise waste
- geometry to develop a true raking mould shape or mitre
- functional and operational features of tools and equipment
- air compressor and hoses
- nail guns
- power drills
- levelling equipment
- battery operated tools
- solving problems, overcoming issues and meeting project schedules
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing CPCSHP3005
What does an assessment tool for CPCSHP3005 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCSHP3005 needs to address all 55 unit components: 3 elements with 17 performance criteria, 3 performance evidence requirements, 35 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for CPCSHP3005?
Auditori pulls the current release of CPCSHP3005 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCSHP3005 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing CPCSHP3005 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCSHP3005, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- CPCSHP3001 — Fabricate shopfitting components using CNC machines
- CPCSHP3002 — Fabricate and assemble shopfront structures
- CPCSHP3003 — Assemble and install shopfront structures
- CPCSHP3004 — Assemble internal shopfitting units and prepare for transport
- CPCSHP3006 — Prepare shopfittings and surfaces and apply liquid finishes
- CPCSHP3007 — Install prefabricated internal shopfitting units
- CPCSHP3008 — Install internal shop walls and fixtures
- CPCSHP3009 — Demolish shopfronts and bulkheads
- CPCSHP3010 — Prepare shop floors for new coverings
Your CPCSHP3005 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate CPCSHP3005 free