CPCPPS5026 — Design rainwater collection, storage, distribution and re-use systems
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for CPCPPS5026 must cover
239 assessable components: 4 elements (28 performance criteria), 4 performance evidence and 207 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Evaluate design parameters.
- 1.1Establish scope of work for rainwater harvesting systems for wide span and high-rise building projects.
- 1.2Establish performance requirements considering safety of system users or building occupants.
- 1.3Determine design requirements from relevant Australian Standards, codes, plans, specifications and client brief.
- 1.4Apply sustainability principles and concepts as part of the design process.
- 1.5Analyse potential contamination sources and create design solutions.
- 1.6Establish rainfall patterns and required rainwater storage volumes.
- 1.7Interpret manufacturer requirements and trade and technical manuals for rainwater harvesting systems.
- 1.8Conduct research to outline design parameters.
- 1.9Conduct cost-benefit analysis to compare a range of pipe materials and system designs.
2 Plan and detail system.
- 2.1Specify tank type and location.
- 2.2Plan layout of pipework systems including type and location of fittings, valves and controls.
- 2.3Plan and detail first-flush systems.
- 2.4Specify water contamination solutions and filtration systems.
- 2.5Calculate pipe size for a range of applications.
- 2.6Plan and detail separation of services and backflow prevention devices.
- 2.7Specify approved non-contaminating materials and jointing methods for rainwater harvesting and design pipe supports.
- 2.8Size and detail pump and ancillary requirements.
- 2.9Specify installation requirements.
- 2.10Specify water treatment according to state and territory health requirements.
- 2.11Specify vermin protection according to manufacturer and state and territory requirements.
- 2.12Provide allowance for expansion and contraction.
3 Design and size systems.
- 3.1Design and detail rainwater harvesting systems.
- 3.2Design and detail rainwater re-use systems.
- 3.3Design and size rainwater harvesting systems using calculations and manufacturer’s data sheets.
4 Prepare documentation.
- 4.1Produce client brief of the preferred design.
- 4.2Prepare plans and specifications for a range of rainwater harvesting systems.
- 4.3Prepare testing and commissioning schedule.
- 4.4Produce operation and maintenance manual.
Performance evidence
- designing, sizing and documenting the layout details for: a high-rise mixed development building, and a wide span project such as a school or industrial complex
- preparing plans and specifications for each of the above projects and include the following system components: authority connection, backflow prevention requirements, filters, fixtures and fitments, piping systems, pumps, storage, water treatment
- documenting the evaluation of design parameters including rainfall, client, regulatory, manufacturer and relevant Australian Standard requirements and storage capacity for each design
- preparing plans and specifications for rainwater harvesting and re-use systems to industry standards
Knowledge evidence
- common terminology and definitions used in the design of rainwater collection, storage, distribution and re-use
- key features of work plans and specifications
- nature of materials used and effects of performance under various conditions
- organisational quality procedures and processes
- principles of technology in the design of rainwater collection, storage, distribution and re-use for residential, commercial and industrial applications to include water treatment and backflow protection of drinking and non-drinking water supply systems
- terminology and definitions used in hydraulic design
- work health and safety (WHS) requirements, including relevant statutory regulations, codes and standards
- scope of work: interpreting plans and specifications
- scope of work: rainfall analysis
- scope of work: sizing and documenting layout of rainwater harvesting systems for residential, commercial and industrial applications to include water treatment and backflow protection of drinking and non-drinking water supply systems
- design requirements: architectural plans
- design requirements: building specifications
- design requirements: owner requirements
- design requirements: pipework identification
- design requirements: sizing of pipework
- design requirements: backflow protection of drinking and non-drinking water supply systems
- design requirements: water treatment
- design requirements: specialist water use applications
- contamination: bacterial
- contamination: heavy metal
- contamination: inorganic
- contamination: odour
- contamination: organic
- contamination: taste
- contamination: silt
- contamination: viral
- contamination: vermin
- cost-benefit analysis comparisons of: design styles
- cost-benefit analysis comparisons of: energy costs
- cost-benefit analysis comparisons of: expected design life
- cost-benefit analysis comparisons of: labour costs
- cost-benefit analysis comparisons of: material costs
- cost-benefit analysis comparisons of: safety factors
- cost-benefit analysis comparisons of: speed of installation
- cost-benefit analysis comparisons of: suitable materials
- statutory, regulatory requirements and relevant Australian Standards and codes: AS/NZS 3500 Plumbing and drainage set
- statutory, regulatory requirements and relevant Australian Standards and codes: AS 2200 Design charts for water supply and sewerage
- statutory, regulatory requirements and relevant Australian Standards and codes: National Construction Code (NCC)
- manufacturer requirements: material specifications
- manufacturer requirements: pipe sizing
- manufacturer requirements: pump installation
- manufacturer requirements: storage system
- technical and trade manuals
- information gathered through desktop study to support design purposes: architectural and building plans
- information gathered through desktop study to support design purposes: developer plans
- information gathered through desktop study to support design purposes: manufacturer data
- information gathered through desktop study to support design purposes: building applications
- information gathered through desktop study to support design purposes: brochures
- information gathered through desktop study to support design purposes: forms
- information gathered through desktop study to support design purposes: policies
- information gathered through desktop study to support design purposes: reports
- performance requirements: compliance limits for: bacteria levels
- performance requirements: compliance limits for: nutrients
- performance requirements: compliance limits for: pH
- performance requirements: compliance limits for: silt control
- performance requirements: compliance limits for: vermin protection
- performance requirements: overflow discharge requirements
- performance requirements: requirements established using relevant Australian Standards, codes and local authority plans for: cover
- performance requirements: requirements established using relevant Australian Standards, codes and local authority plans for: discharge
- performance requirements: requirements established using relevant Australian Standards, codes and local authority plans for: flow conditions
- performance requirements: requirements established using relevant Australian Standards, codes and local authority plans for: pipe grades
- tank types: concrete
- tank types: fibreglass
- tank types: metal
- tank types: polymer
- tank types: other approved materials
- tank locations: above-ground
- tank locations: in-ground
- layout of pipework systems: gravity systems
- layout of pipework systems: pumped systems
- designing to not unduly affect building integrity and aesthetic appeal
- designing to include principles of economy, serviceability, durability and fit for use
- fittings, valves and controls: backflow prevention devices
- fittings, valves and controls: inspection openings
- fittings, valves and controls: irrigation control systems
- fittings, valves and controls: isolating valves
- fittings, valves and controls: level indicators
- fittings, valves and controls: pump controls
- first-flush systems: electronic
- first-flush systems: float-activated
- first-flush systems: mechanical
- first-flush systems: volume-activated
- filtration systems: overflow devices
- filtration systems: sand
- filtration systems: screens
- filtration systems: settlement tanks
- filtration systems: strainers
- water contamination solutions: disinfection
- water contamination solutions: ultraviolet
- pipe size calculations: determination of flow
- pipe size calculations: interpretation of design charts and tables
- pipe size calculations: pipe sizing calculations
- pipe size calculations: reduced level calculations
- materials: copper (Cu)
- materials: polyethylene (PE)
- materials: polypropylene (PP)
- materials: polybutylene (PB)
- materials: unplasticised polyvinyl chloride (uPVC)
- materials: other approved materials
- jointing methods: brazing
- jointing methods: compression joints
- jointing methods: electrofusion welding
- jointing methods: mechanical joints
- jointing methods: solvent cement
- jointing methods: threading
- jointing methods: other approved jointing methods
- pipe support: anchors
- pipe support: bedding
- pipe support: bracket spacing
- pipe support: concrete support
- pipe support: corrosion protection
- pipe support: manufacturer-recommended specific fixings
- pipe support: material requirements
- pipe support: provision for expansion
- pipe support: saddles
- pump and ancillary requirements: automatic controls
- pump and ancillary requirements: pump duties
- pump and ancillary requirements: corrosion-resistant materials
- pump and ancillary requirements: level controls and alarms
- pump and ancillary requirements: pump selection and pump sizing, based on: flow
- pump and ancillary requirements: pump selection and pump sizing, based on: velocity
- pump and ancillary requirements: pump selection and pump sizing, based on: lift
- pump and ancillary requirements: pump selection and pump sizing, based on: probable simultaneous demands
- installation requirements: level of workmanship
- installation requirements: manufacturer-recommended specific fixings
- installation requirements: pipe support
- installation requirements: provision for expansion
- installation requirements: serviceability and access
- pipe protection: cover
- pipe protection: corrosion
- pipe protection: impact
- pipe protection: fire rating
- rainwater re-use systems: roof water collection
- rainwater re-use systems: water treatment
- rainwater re-use systems: pumps
- rainwater re-use systems: approved drinking and non-drinking use
- storage: tanks
- storage: open in-ground (dam)
- methods for applying sustainability principles and concepts: selecting appropriate material to ensure minimal environmental impact
- methods for applying sustainability principles and concepts: efficient use of material
- methods for applying sustainability principles and concepts: efficient energy usage/capital outlay comparison
- methods for applying sustainability principles and concepts: local environment consideration
- methods for applying sustainability principles and concepts: water efficiency
- methods for applying sustainability principles and concepts: re-use of greywater
- methods for applying sustainability principles and concepts: consideration of the Green Building Council of Australia rating scheme
- types of plans: axonometrics
- types of plans: cross-sections
- types of plans: details
- types of plans: elevations
- types of plans: isometrics
- types of plans: sections
- types of plans: schematics produced using: computer generation
- types of plans: schematics produced using: drawing equipment
- specification: backflow prevention
- specification: flow requirements
- specification: jointing
- specification: manufacturer requirements
- specification: materials
- specification: residual pressures
- specification: work health and safety (WHS)
- specification: specialised components
- specification: storage
- specification: support
- specification: testing
- specification: valve selection
- specification: water treatment
- specification: workmanship
- testing for: air pressure
- testing for: backflow protection
- testing for: defect inspection
- testing for: drainage inspection
- testing for: hydrostatic
- testing for: performance: flow
- testing for: performance: pressure
- testing for: performance: water quality
- testing for: quality assurance (QA) audit
- commissioning schedule information: balancing disposal system
- commissioning schedule information: flow and pressure adjustments
- commissioning schedule information: leak check
- commissioning schedule information: pressure test
- commissioning schedule information: pump settings
- commissioning schedule information: safety requirements
- commissioning schedule information: system certification
- commissioning schedule information: system defects
- commissioning schedule information: system flushing
- commissioning schedule information: system functions as per design
- commissioning schedule information: system purge
- commissioning schedule information: valve operation
- commissioning schedule information: ventilation
- commissioning schedule information: vermin control
- operation and maintenance manual information: as installed drawings
- operation and maintenance manual information: certification documentation
- operation and maintenance manual information: maintenance schedules
- operation and maintenance manual information: manufacturer brochures
- operation and maintenance manual information: ongoing maintenance requirements
- operation and maintenance manual information: pump maintenance
- operation and maintenance manual information: regular inspections
- operation and maintenance manual information: results of commissioning test
- operation and maintenance manual information: safety management system
- operation and maintenance manual information: system detail, setting and operations
- operation and maintenance manual information: valve function
- system operational parameter adjustments and checks: disinfection
- system operational parameter adjustments and checks: first flush devices
- system operational parameter adjustments and checks: pH
- system operational parameter adjustments and checks: silt control
- system operational parameter adjustments and checks: suspended solids
- system operational parameter adjustments and checks: water quality
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing CPCPPS5026
What does an assessment tool for CPCPPS5026 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCPPS5026 needs to address all 239 unit components: 4 elements with 28 performance criteria, 4 performance evidence requirements, 207 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for CPCPPS5026?
Auditori pulls the current release of CPCPPS5026 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCPPS5026 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing CPCPPS5026 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCPPS5026, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- CPCPPS5000 — Design gas bulk storage systems
- CPCPPS5001 — Design industrial gas systems
- CPCPPS5002 — Design gas reticulation systems
- CPCPPS5014 — Locate and maintain piping systems
- CPCPPS5015 — Inspect plumbing and drainage systems
- CPCPPS5023 — Design solar water heating systems
- CPCPPS5024 — Conduct a water audit and identify water-saving initiatives
- CPCPPS5025 — Design grey water re-use systems
- CPCPPS5027 — Design irrigation systems
- CPCPPS5028 — Design trade waste pre-treatment systems
- CPCPPS5030 — Design pump systems
- CPCPPS5032 — Design siphonic stormwater drainage systems
Your CPCPPS5026 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate CPCPPS5026 free