UETDRSB003 — Commission and maintain distribution field devices
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for UETDRSB003 must cover
68 assessable components: 3 elements (17 performance criteria), 27 performance evidence and 24 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Prepare to commission distribution field devices
- 1.1Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are reviewed and determined
- 1.2Work plan is obtained and confirmed in accordance with workplace requirements, and where relevant, communicated to the appropriate personnel
- 1.3Hazards are identified, risks assessed, and control measures identified and applied
- 1.4Work is prioritised and sequenced for completion in accordance with work plan and workplace requirements
- 1.5Plant, tools, equipment and personal protective equipment (PPE) required for work are determined, obtained and confirmed in working order
- 1.6Liaison and communication issues with authorised personnel, authorities and clients are resolved to facilitate work, as required
- 1.7Worksite is prepared in accordance with the work plan and workplace requirements
2 Commission distribution field devices
- 2.1Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are applied and monitored
- 2.2Work permits are received and signed in accordance with workplace requirements
- 2.3Lifting, working at heights, working in confined spaces and the use of plant, tools, equipment and PPE are carried out in accordance with workplace requirements
- 2.4Distribution field devices are commissioned in accordance with workplace requirements
- 2.5Incidents or unplanned events are responded to in accordance with workplace requirements
3 Complete work and documentation
- 3.1Completed work is checked for compliance against the work plan and workplace requirements
- 3.2Work permits are signed off in accordance with workplace requirements
- 3.3Worksite is rehabilitated, cleaned and made safe in accordance with workplace requirements
- 3.4Plant, tools and equipment are cleaned, checked and returned to storage, and surplus resources and materials are managed in accordance with workplace requirements
- 3.5Work records, reports and documentation are completed, and where relevant, appropriate personnel notified in accordance with workplace requirements
Performance evidence
- applying relevant legislation, regulations, standards, codes of practice and organisational workplace requirements including:
- work health and safety (WHS)/occupational health and safety (OHS) requirements
- identifying hazards, assessing risks, and identifying, applying and monitoring control measures
- obtaining, inspecting and using relevant personal protective equipment (PPE)
- dealing with an unplanned event on at least one (1) occasion
- obtaining and signing relevant work permits in accordance with workplace requirements
- completing relevant work records, reports and documentation
- completing four (4) of the following commissioning and maintenance activities:
- confirming device construction specifications
- applying device settings
- performing secondary injections
- performing timing checks
- confirming remote operations
- performing earthing checks
- performing calibrations
- performing commissioning and maintenance of at least six (6) of the following distribution field devices components:
- automatic circuit reclosers (ACRs)
- fuses
- circuit breakers
- transformers
- gas switches
- sectionalisers
- regulators
- capacitors
- reactors
- mobile phone systems
- mobile radio systems
Knowledge evidence
- relevant legislation, regulations, standards, codes of practice and organisational workplace requirements including WHS/OHS requirements
- hazard, risk assessment and risk control requirements, including potential hazards
- types and application of PPE
- safe use of plant, tools and equipment
- application, purpose and types of permits and access authorities
- events constituting an unplanned event or incident
- procedures for responding to an unplanned event or incident
- workplace records, reports and documentation requirements
- evaluation of equipment serviceability
- identification and procurement of materials and apparatus
- manuals, system diagrams and drawings
- commissioning and maintenance procedures for distribution field devices
- principles and operating parameters of distribution field devices, including:
- automatic circuit reclosers (ACRs)
- fuses
- circuit breakers
- transformers
- gas switches
- sectionalisers
- regulators
- capacitors
- reactors
- mobile phone systems
- mobile radio systems
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing UETDRSB003
What does an assessment tool for UETDRSB003 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UETDRSB003 needs to address all 68 unit components: 3 elements with 17 performance criteria, 27 performance evidence requirements, 24 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for UETDRSB003?
Auditori pulls the current release of UETDRSB003 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UETDRSB003 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing UETDRSB003 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UETDRSB003, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- UETDRSB001 — Perform substation switching operations to a given schedule
- UETDRSB002 — Commission and maintain discrete control and protection systems
- UETDRSB004 — Conduct surveys using thermovision techniques
- UETDRSB005 — Diagnose and resolve faults in a substation environment
- UETDRSB006 — Inspect substations
- UETDRSB007 — Install and maintain substation direct current systems
- UETDRSB008 — Install high current d.c. equipment and switchgear
- UETDRSB009 — Install high voltage plant and equipment
- UETDRSB010 — Maintain capacitor bank equipment
- UETDRSB011 — Maintain high current d.c. equipment and switchgear
- UETDRSB012 — Maintain high voltage circuit breakers
- UETDRSB013 — Maintain on-load tap changers (OLTC)
Your UETDRSB003 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate UETDRSB003 free