UETDRIS021 — Coordinate and direct switching programs
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for UETDRIS021 must cover
49 assessable components: 3 elements (17 performance criteria), 6 performance evidence and 26 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Prepare to coordinate and direct switching programs
- 1.1Purpose for the switching program is established in accordance with workplace requirements
- 1.2Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be done are reviewed and determined
- 1.3Data is analysed for best outcomes in accordance with workplace requirements
- 1.4Hazards are identified, risks assessed, and control measures identified and applied
- 1.5Work plan is developed, validated and communicated with stakeholders in accordance with workplace requirements
- 1.6Work permits are determined in accordance with workplace requirements
- 1.7Operational personnel requirements are determined in accordance with workplace requirements
2 Coordinate and direct switching programs
- 2.1Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are applied and monitored
- 2.2Personnel are confirmed and coordinated in accordance with workplace requirements
- 2.3Switching programs are coordinated and directed in accordance with workplace requirements
- 2.4Work permits are received and signed in accordance with workplace requirements
- 2.5Hazard control measures are monitored in accordance with workplace requirements
- 2.6Incidents or unplanned events are responded to in accordance with workplace requirements
3 Complete work and documentation
- 3.1Completed work is checked for compliance against the work plan and workplace requirements
- 3.2Incidents or unplanned events are reported in accordance with workplace requirements
- 3.3Work permits are signed off in accordance with workplace requirements
- 3.4Work records, reports and documentation are completed, and appropriate personnel notified in accordance with workplace requirements
Performance evidence
- applying relevant legislation, regulations, standards, codes of practice and organisational workplace requirements including: work health and safety (WHS)/occupational health and safety (OHS) requirements
- identifying hazards, assessing risks, identifying, applying and monitoring control measures
- dealing with an unplanned event on at least one (1) occasion
- obtaining and signing work permits in accordance with workplace requirements
- completing relevant work records, reports and documentation
- demonstrating switching coordination and direction on at least one (1) occasion
Knowledge evidence
- relevant legislation, regulations, standards, codes of practice and organisational workplace requirements including WHS/OHS requirements
- hazard, risk assessment and risk control requirements, including potential hazards
- application, purpose and types of permits
- events constituting an unplanned event or incident
- procedures for responding to an unplanned event or incident
- workplace records, reports and documentation maintenance
- operational personnel requirements
- switching programs
- interconnected electrical networks
- functions of supervisory control and data acquisition (SCADA) or equivalent system
- responding to alarms, indicators and trouble calls
- switching operator authorisation
- smanuals, system diagrams, plans and drawings
- types, characteristics and capabilities of electrical apparatus
- sources of possible back-feed
- restrictions on electrical apparatus
- isolation procedures
- earthing procedures
- fault levels and settings
- load calculation
- operating agreements
- protection system principles
- HV single wire earth return (SWER) system
- harmonics
- resonant networks
- feeder automation systems
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing UETDRIS021
What does an assessment tool for UETDRIS021 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UETDRIS021 needs to address all 49 unit components: 3 elements with 17 performance criteria, 6 performance evidence requirements, 26 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for UETDRIS021?
Auditori pulls the current release of UETDRIS021 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UETDRIS021 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing UETDRIS021 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UETDRIS021, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- UETDRIS007 — Install and maintain distribution overhead conductors and cables
- UETDRIS008 — Install and maintain electrical apparatus
- UETDRIS010 — Install and maintain low voltage overhead services
- UETDRIS011 — Install and maintain low voltage underground services
- UETDRIS012 — Install and maintain poles, structures and hardware
- UETDRIS013 — Install and maintain public lighting systems
- UETDRIS014 — Install and replace energy meters and associated equipment
- UETDRIS015 — Install low voltage mobile generator
- UETDRIS017 — Perform high voltage field switching operation to a given schedule
- UETDRIS018 — Perform low voltage field switching operation to a given schedule
- UETDRIS020 — Contribute to coordinated high voltage live work
- UETDRIS022 — Coordinate permit procedures
Your UETDRIS021 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate UETDRIS021 free