What an assessment for UEPMNT351 must cover
51 assessable components: 5 elements (27 performance criteria), 10 performance evidence and 14 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Plan and prepare for work
- 1.1Requirements including scope of work and assigned roles are identified and confirmed with appropriate personnel or by site inspection, in accordance with workplace procedures
- 1.2Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, legislative requirements, industry standards, codes of practice, manufacturers’ specifications, environmental obligations and workplace procedures are reviewed in preparation for work
- 1.3Resources are obtained and inspected for compliance with job specification
- 1.4Relevant plans, drawings and manuals are selected and used, in accordance with workplace procedures
- 1.5Correct materials and components for work are obtained and inspected, in accordance with workplace procedures, for compliance with job specification
- 1.6Work is planned, sequenced and prioritised, in accordance with workplace procedures
- 1.7Potential hazards are identified and risk control measures are selected and implemented, in accordance with workplace procedures
- 1.8Work area is prepared, in accordance with workplace procedures and requirements
2 Test electrical wiring systems
- 2.1Isolations for work are confirmed, in accordance with workplace procedures
- 2.2Electrical wiring systems are tested using appropriate plans, drawings and manuals, in accordance with workplace procedures
- 2.3Electrical wiring systems, including enclosures and/or supports, are inspected in accordance with workplace procedures, prior to testing to ensure absence of any damage, defects and deterioration
- 2.4Fixed electrical wiring is tested, as required, and results are documented to confirm compliance with job specification
3 Test electrical equipment
- 3.1Isolations are confirmed, where appropriate, in accordance with workplace procedures site requirements
- 3.2Electrical equipment is tested using appropriate plans, drawings and manuals, in accordance with workplace procedures
- 3.3Test conditions are confirmed, and equipment is inspected, in accordance with workplace procedures, to ensure absence of damage, defects and deterioration
- 3.4Electrical equipment is tested using appropriate testing techniques, in accordance with workplace procedures
- 3.5Electrical equipment test results are documented to confirm compliance with job specification
4 Commission electrical equipment
- 4.1Isolations are confirmed, where appropriate, in accordance with workplace procedures and site requirements
- 4.2Electrical equipment is commissioned using appropriate plans, drawings and manuals, in accordance with workplace procedures
- 4.3Equipment is set up, in accordance with workplace procedures, operational requirements or manufacturers’ specifications
- 4.4Testing and monitoring procedures are followed, and results are documented to ensure electrical equipment functions within manufacturers’ specifications
- 4.5Electrical equipment is commissioned, in accordance with workplace procedures
- 4.6Final inspection on electrical equipment is carried out, in accordance with workplace procedures
5 Complete work
- 5.1Work is completed and appropriate personnel are notified, in accordance with workplace procedures
- 5.2Work area is cleared of waste, cleaned, restored and secured in accordance with workplace procedures
- 5.3Tools and equipment are cleaned, maintained and stored, in accordance with workplace procedures
- 5.4Work completion details are finalised, in accordance with workplace procedures
Performance evidence
- applying Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) requirements including: - emergency procedures - hazard identification - risk control measures - safe working practices
- commissioning electrical equipment
- completing work as per scheduling requirements communicating with personnel
- determining permit to work requirements
- implementing legislation, industry standards, codes of practice and regulations
- inspecting and testing wiring systems
- inspecting, testing and monitoring electrical equipment
- planning testing and commissioning electrical equipment work
- selecting materials
- using manufacturers’ specifications and manuals
Knowledge evidence
- characteristics and operation of electrical equipment
- electrical equipment commissioning
- equipment and materials
- inspections of wiring systems and electrical equipment
- isolations
- legislation, industry standards, codes of practice and regulations
- manufacturers’ specifications and manuals
- permit to work system
- power generation plant and equipment, and its location
- testing methods and techniques
- typical arrangements of power production plant
- WHS/OHS legislated requirements including: - emergency procedures - hazard identification - risk control measures - safe working practices
- workplace documentation
- workplace policies and procedures
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing UEPMNT351
What does an assessment tool for UEPMNT351 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEPMNT351 needs to address all 51 unit components: 5 elements with 27 performance criteria, 10 performance evidence requirements, 14 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for UEPMNT351?
Auditori pulls the current release of UEPMNT351 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEPMNT351 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing UEPMNT351 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEPMNT351, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- UEPMNT001 — Carry out routine work activities in an electricity supply industry generation environment
- UEPMNT002 — Carry out routine work activities in an ESI large scale wind generation environment
- UEPMNT003 — Coordinate maintenance on a wind farm
- UEPMNT004 — Diagnose and repair faults in large scale wind turbines
- UEPMNT005 — Diagnose and repair faults in wind turbine control systems
- UEPMNT006 — Diagnose and repair faults in wind turbine electrical systems
- UEPMNT007 — Diagnose and repair mechanical systems faults in wind turbines
- UEPMNT008 — Maintain and monitor wind farm civil assets
- UEPMNT009 — Maintain large scale wind turbines
- UEPMNT010 — Maintain wind turbine control systems
- UEPMNT011 — Maintain wind turbine electrical systems
- UEPMNT012 — Maintain wind turbine mechanical systems