UEERE0079Install off-grid power conversion equipment to electrical installation

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for UEERE0079 must cover

47 assessable components: 2 elements (15 performance criteria), 9 performance evidence and 23 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Prepare to install off-grid power conversion equipment to electrical installation

  • 1.1Nature of the installation is verified from design documentation and any design concerns identified referred to designer
  • 1.2WHS/OHS processes and procedures for relevant work area are identified and applied in accordance with workplace procedures
  • 1.3WHS/OHS hazards are identified, risks assessed, reported to relevant person/s and workplace procedures for risk control measures applied in preparation for work
  • 1.4System installation is planned in consultation with others impacted by the work and sequenced appropriately
  • 1.5Location of system components is verified according to design within the constraints of the building structure and regulations
  • 1.6Materials, components, tools, equipment and testing devices required are obtained in accordance with workplace procedures and checked for correct operation and safety
  • 1.7Live testing, measurement and isolation requirements determined in accordance with WHS/OHS requirements and workplace procedures

2 Install off-grid power conversion equipment to electrical installation

  • 2.1Circuits/machines/plant are isolated in accordance with WHS/OHS requirements and workplace procedures
  • 2.2System components are installed to comply with design, manufacturer specifications, industry standards and regulatory requirements
  • 2.3Wiring is terminated at system components and mandatory tests conducted prior to energisation
  • 2.4Quality checks of installed apparatus are conducted in accordance with workplace procedures
  • 2.5System is programmed in accordance manufacturer specifications and design
  • 2.6Testing and commissioning of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications
  • 2.7Worksite is cleaned and made safe in accordance with workplace procedures
  • 2.8‘As-installed’ system and associated equipment are documented, manuals produced, and system is handed over to required person/s as per legislation, regulations, industry standards and job requirements

Performance evidence

  • applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements, including using risk control measures
  • verifying design and resolving any issues with designer
  • coordinating work with relevant person/s
  • determining and applying live testing, measurement and isolation requirements
  • reading and interpreting drawings/diagrams related to apparatus locations and circuit connections
  • applying appropriate installation methods for off-grid systems
  • testing system operation and verifying compliance with standards and job specifications
  • connecting and commissioning in accordance with industry standards and regulations
  • completing necessary documentation, including handing over system operational documents to the customer

Knowledge evidence

  • system configurations including multiple energy sources including:
  • systems with d.c. loads only
  • systems with d.c. and ac. loads
  • systems with a.c. loads
  • renewable energy only systems including PV, wind and micro-hydro
  • hybrid systems comprising one or more RE system with fuel generator
  • electrical installation requirements including:
  • methods used in wiring and connecting the following in accordance with relevant Australian Standards and manufacturers requirements:
  • multiple PCEs and associated control equipment
  • PCEs with generating sets
  • PCEs and fuel generators directly with loads or with switchboards or distributions board
  • considerations involved in choosing the cable routes
  • selection and locating the associated protection and isolating devices in accordance with relevant Australian standards and industry guidelines
  • wiring diagrams for the off-grid RE system showing the general circuit layout and protection between the various system components
  • system control installation including:
  • control and monitoring equipment
  • associated cabling
  • control programming
  • system testing and commissioning
  • system documentation
  • relevant manufacturer specifications
  • relevant safe work method statements (SWMS)/job safety assessments or risk mitigation processes
  • relevant workplace documentation, policies and procedures

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing UEERE0079

What does an assessment tool for UEERE0079 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEERE0079 needs to address all 47 unit components: 2 elements with 15 performance criteria, 9 performance evidence requirements, 23 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for UEERE0079?

Auditori pulls the current release of UEERE0079 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEERE0079 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing UEERE0079 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEERE0079, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your UEERE0079 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate UEERE0079 free