UEERE0071Fault find and repair off-grid photovoltaic/generating set systems to an electrical installation

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for UEERE0071 must cover

26 assessable components: 3 elements (14 performance criteria), 2 performance evidence and 10 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Prepare to fault find and repair off-grid PV/genset systems

  • 1.1Work health and safety (WHS)/occupational health and safety (OHS) processes and procedures for relevant work area are identified and applied in accordance with workplace procedures
  • 1.2The nature of the fault/issue is identified from stakeholders and relevant data and documentation
  • 1.3Requirements for working with other stakeholders are confirmed and applied
  • 1.4Required materials, tools, apparatus and testing devices are identified, accessed and checked for correct operation and safety
  • 1.5Need to test or measure live electrical work is determined in accordance with WHS/OHS requirements and workplace procedures

2 Fault find and repair off-grid PV/genset systems

  • 2.1Circuits/apparatus are isolated in accordance with WHS/OHS requirements and workplace procedures
  • 2.2Nature of reported fault/issue is verified
  • 2.3System testing is conducted and documented
  • 2.4Fault or faults are diagnosed, faulty equipment is identified, and the replacement products required are documented
  • 2.5System is made safe, faulty apparatus is dismantled, recorded and stored in accordance with manufacturer guides and stakeholder instructions
  • 2.6Repaired or replaced apparatus is assembled in accordance with manufacturer guidelines, industry standards and regulation

3 Complete and report repair work activities

  • 3.1Repaired apparatus is tested and commissioned in accordance with manufacturer guidelines, industry standards and regulation
  • 3.2Work area is cleaned and made safe
  • 3.3Repair is documented and stakeholders notified

Performance evidence

  • applying relevant work health and safety (WHS)/occupational health and safety (OHS) procedures
  • finding and repairing faults/issues in off-grid PV/genset systems including: - verifying the reported faults/issues - diagnosing fault/issue based on measured and expected values - determining and implementing solution - documenting issue and justification for the solution used.

Knowledge evidence

  • off-grid PV/genset systems maintenance processes including: - correct isolation and shutdown procedures prior to carrying out maintenance tasks - appropriate maintenance methods for the various system components using appropriate safety procedures - maintenance schedule for the system - problem-solving techniques, including measuring and calculating value requirements
  • off-grid PV/genset systems fault finding: - procedures for individual equipment - procedures for interconnected systems
  • off-grid PV/genset systems maintenance procedures including: - requirements for individual equipment - requirements for interconnected systems.
  • requirements including relevant industry standards, regulations and manufacturer requirements
  • off-grid PV/genset systems testing and commissioning procedures including: - safe testing of equipment - safe testing of system operation
  • system configurations including multiple energy sources including: - systems with d.c. loads only - systems with d.c. and ac. loads - systems with a.c. loads - renewable energy only systems including PV, wind and micro-hydro - hybrid systems comprising one or more RE system with fuel generator
  • electrical installation requirements including: - methods used in wiring and connecting the following in accordance with relevant Australian Standards and manufacturers requirements: - multiple PCEs and associated control equipment - PCEs with generating sets - PCEs and fuel generators directly with loads or with switchboards or distributions board - selection and locating the associated protection and isolating devices in accordance with relevant Australian standards and industry guidelines - wiring diagrams for the off-grid RE system showing the general circuit layout and protection between the various system components
  • system control installation including: - control and monitoring equipment - associated cabling - control programming - system testing and commissioning - system documentation
  • relevant manufacturer specifications
  • relevant safe work method statements (SWMS)/job safety assessments or risk mitigation processes.

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing UEERE0071

What does an assessment tool for UEERE0071 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEERE0071 needs to address all 26 unit components: 3 elements with 14 performance criteria, 2 performance evidence requirements, 10 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for UEERE0071?

Auditori pulls the current release of UEERE0071 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEERE0071 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing UEERE0071 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEERE0071, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your UEERE0071 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate UEERE0071 free