UEERE0070 — Fault find and repair grid-connected photovoltaic power supply systems
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for UEERE0070 must cover
35 assessable components: 3 elements (14 performance criteria), 2 performance evidence and 19 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Prepare to fault find and repair grid-connected PV systems
- 1.1Work health and safety (WHS)/occupational health and safety (OHS) processes and procedures for relevant work area are identified and applied in accordance with workplace procedures
- 1.2The nature of the fault/issue is identified from stakeholders and relevant data and documentation
- 1.3Requirements for working with other stakeholders are confirmed and applied
- 1.4Required materials, tools, apparatus and testing devices are identified, accessed and checked for correct operation and safety
- 1.5Need to test or measure live electrical work is determined in accordance with WHS/OHS requirements and workplace procedures
2 Fault find and repair grid-connected PV systems
- 2.1Circuits/apparatus are isolated in accordance with WHS/OHS requirements and workplace procedures
- 2.2Nature of reported fault/issue is verified
- 2.3System testing is conducted and documented
- 2.4Fault or faults are diagnosed, faulty equipment is identified, and the replacement products required are documented
- 2.5System is made safe, faulty apparatus is dismantled, recorded and stored in accordance with manufacturer guides and stakeholder instructions
- 2.6Repaired or replaced apparatus is assembled in accordance with manufacturer guidelines, industry standards and regulation
3 Complete and report repair work activities
- 3.1Repaired apparatus is tested and commissioned in accordance with manufacturer guidelines, industry standards and regulation
- 3.2Work area is cleaned and made safe
- 3.3Repair is documented and stakeholders notified
Performance evidence
- applying relevant work health and safety (WHS)/occupational health and safety (OHS) procedures
- finding and repairing faults/issues in grid-connected photovoltaic power supply systems including: verifying the reported faults/issues, diagnosing fault/issue based on measured and expected values, determining and implementing solution, documenting issue and justification for the solution used.
Knowledge evidence
- grid-connected system fault finding: procedures for individual equipment
- grid-connected system fault finding: procedures for interconnected systems
- grid-connected system maintenance procedures including: requirements for individual equipment
- grid-connected system maintenance procedures including: requirements for interconnected systems
- requirements including relevant industry standards, regulations and manufacturer requirements
- grid-connected system testing and commissioning procedures including: safe testing of equipment
- grid-connected system testing and commissioning procedures including: safe testing of system operation
- grid-connected system testing and commissioning procedures including: daily irradiation
- PV modules
- module characteristics including: definition of the terms: I-V curve, operating point, MPP, cell temperature co-efficient, voltage and power output co-efficient
- module characteristics including: family of current - voltage (I-V) curves for a PV module, labelling major points and showing the effects of variation in irradiance and variation in cell temperature
- module characteristics including: major ratings of a PV module from manufacturer’s information or nameplate data
- module characteristics including: configuration of a typical PV array
- module characteristics including: the effect of partial shading of a PV module or array, the impact of bypass diodes and the significance of their configuration on output current in typical operating conditions
- module characteristics including: the scope and content of Australian or international standards relevant to the performance of PV modules
- module characteristics including: module level power electronics
- module characteristics including: calculation of the daily energy output of a PV array in accordance with relevant industry standards, and by using “rule of thumb” de-rating factors
- relevant manufacturer specifications
- workplace documentation for reporting repair activities
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing UEERE0070
What does an assessment tool for UEERE0070 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEERE0070 needs to address all 35 unit components: 3 elements with 14 performance criteria, 2 performance evidence requirements, 19 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for UEERE0070?
Auditori pulls the current release of UEERE0070 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEERE0070 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing UEERE0070 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEERE0070, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- UEERE0001 — Apply environmentally and sustainable procedures in the energy sector
- UEERE0006 — Conduct periodic maintenance of remote area power supply battery banks
- UEERE0007 — Conduct periodic maintenance of remote area power supply generator sets
- UEERE0008 — Conduct periodic maintenance of remote area power supply photovoltaic arrays
- UEERE0009 — Conduct periodic maintenance of remote area power supply wind generators
- UEERE0013 — Develop strategies to address environmental and sustainability issues in the energy sector
- UEERE0015 — Implement and monitor energy sector environmental and sustainable policies and procedures
- UEERE0018 — Maintain and repair remote area power generation facilities
- UEERE0049 — Apply safe work practices in the rooftop solar industry
- UEERE0050 — Identify and isolate multiple supply systems
- UEERE0051 — Apply electrical principles to renewable energy design
- UEERE0052 — Assess energy loads and uses for energy efficiency in commercial facilities
Your UEERE0070 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate UEERE0070 free