UEERE0058Coordinate the installation, fault finding and repair of micro grid systems

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for UEERE0058 must cover

71 assessable components: 4 elements (22 performance criteria), 9 performance evidence and 40 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Prepare to coordinate work on micro-grid systems

  • 1.1Nature of the installation is verified from design documentation and any design concerns identified referred to designer
  • 1.2Work health and safety (WHS)/occupational health and safety (OHS) processes and procedures are identified and applied in accordance with workplace procedures
  • 1.3Engagement and scheduling of contractors and other experts required for completion of work is arranged, and roles, responsibilities and levels of authority confirmed
  • 1.4Work is planned in consultation with others impacted by the work and sequenced appropriately
  • 1.5Location of system components is verified according to design within the constraints of the building structure and regulations
  • 1.6Materials, components, tools, equipment and testing devices required are obtained in accordance with workplace procedures and checked for correct operation and safety
  • 1.7Live testing, measurement and isolation requirements determined in accordance with WHS/OHS requirements and workplace procedures

2 Coordinate installation of micro-grid systems

  • 2.1Circuits/machines/plant are isolated in accordance with WHS/OHS requirements and workplace procedures
  • 2.2Transport of equipment to the site is confirmed in accordance with workplace procedures
  • 2.3System components are installed by relevant personnel to comply with deign, manufacturer specifications, industry standards and regulatory requirements
  • 2.4Installation/construction work of other parties is confirmed as compliant with industry standards, regulations and manufacturer specifications prior to commencing each stage of the project
  • 2.5Quality checks of installed apparatus are conducted in accordance with workplace procedures
  • 2.6System is programmed by relevant personnel in accordance manufacturer specifications and design
  • 2.7Testing and commissioning of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications

3 Coordinate fault finding and repair of micro-grid systems

  • 3.1Nature of reported fault/issue is verified
  • 3.2Circuits/apparatus are confirmed as isolated in accordance with WHS/OHS requirements and workplace procedures
  • 3.3Fault or faults are diagnosed, faulty equipment is identified, and the replacement products required are documented by relevant personnel
  • 3.4System is made safe, faulty apparatus is dismantled, recorded and stored by relevant personnel in accordance with manufacturer guides and stakeholder instructions
  • 3.5Repaired or replaced apparatus is assembled by relevant personnel in accordance with manufacturer guidelines, industry standards and regulation
  • 3.6Testing and re-commissioning of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications

4 Complete and report work activities

  • 4.1Work area is cleaned and made safe
  • 4.2'As-installed' system and associated equipment are documented, manuals produced, and system is handed over to required person/s as per legislation, regulations, industry standards and job requirements

Performance evidence

  • applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements, including using risk control measures
  • verifying design and resolving any issues with designer
  • engaging and scheduling of contractors and other experts required for completion of work and confirming roles, responsibilities and levels of authority
  • planning work in consultation with others impacted by the work and sequenced appropriately
  • ensuring installed/repaired system components comply with deign, manufacturer specifications, industry standards and regulatory requirements
  • conducting quality checks of installed apparatus
  • ensuring system is programmed in accordance manufacturer specifications and design
  • testing and commissioning the system in accordance with design, regulations, relevant industry standards and manufacturer specifications
  • completing necessary documentation, including handing over system operational documents to the customer.

Knowledge evidence

  • conducting and reporting the outcomes of site surveys for renewable energy systems
  • design principles for grid-connected, off-grid and micro-grid systems
  • processes, procedures and techniques for the installation of:
  • grid connected photovoltaic systems
  • grid connected energy storage systems
  • power conversion equipment to the grid
  • power conversion equipment to essential loads
  • off-grid systems to an electrical installation
  • micro-grid system components and operating systems
  • system configurations including multiple energy sources including:
  • systems with d.c. loads only
  • systems with d.c. and a.c. loads
  • systems with a.c. loads
  • renewable energy only systems including PV, wind and micro-hydro
  • hybrid systems comprising one or more RE system with fuel generator
  • electrical installation requirements including:
  • methods used in wiring and connecting in accordance with relevant Australian Standards and manufacturers requirements
  • considerations involved in choosing the cable routes
  • selection and locating the associated protection and isolating devices in accordance with relevant Australian standards and industry guidelines
  • wiring diagrams for RE systems showing the general circuit layout and protection between the various system components
  • system control installation including:
  • control and monitoring equipment
  • associated cabling
  • control programming
  • fault finding, repair and maintenance of grid-connected and off-grid systems
  • micro-grid system fault finding including:
  • procedures for individual equipment
  • procedures for interconnected systems
  • micro-grid system maintenance procedures including:
  • requirements for individual equipment
  • requirements for interconnected systems.
  • requirements including relevant industry standards, regulations and manufacturer requirements
  • micro-grid system quality check procedures
  • micro-grid system testing and commissioning procedures including:
  • safe testing of equipment
  • safe testing of system operation
  • system documentation
  • relevant manufacturer specifications
  • relevant safe work method statements (SWMS)/job safety assessments or risk mitigation processes
  • relevant workplace documentation, policies and procedures.

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing UEERE0058

What does an assessment tool for UEERE0058 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEERE0058 needs to address all 71 unit components: 4 elements with 22 performance criteria, 9 performance evidence requirements, 40 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for UEERE0058?

Auditori pulls the current release of UEERE0058 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEERE0058 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing UEERE0058 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEERE0058, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your UEERE0058 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate UEERE0058 free