UEERE0054Conduct site survey for grid-connected photovoltaic and battery storage systems

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for UEERE0054 must cover

68 assessable components: 2 elements (18 performance criteria), 18 performance evidence and 32 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Prepare to conduct site survey

  • 1.1Stakeholders are identified and client requirements and expectations for grid-connected system obtained
  • 1.2Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures relevant to site survey are obtained and applied
  • 1.3Equipment and documentation needed for the site inspection are obtained in accordance with workplace procedures
  • 1.4Requirements for site survey and roles/responsibilities of people involved in site survey, design and installation are discussed with client
  • 1.5General information about industry standards, building/electrical regulations and codes, and risk minimisation is provided to client
  • 1.6Advice on the benefits of photovoltaic and battery storage systems and energy management is provided to client
  • 1.7Current client energy usage data is collected, and future changes identified
  • 1.8Resources, information sources and other people that will support gathering required site survey information are identified

2 Undertake and document site survey

  • 2.1Site survey for the proposed installation is safely undertaken
  • 2.2Current and expected future client energy generation needs are discussed, and expectations are clarified
  • 2.3Site hazards that may impact installation are identified and documented
  • 2.4Information about site access, building structures, existing electrical infrastructure, available RE resources is gathered and included in report
  • 2.5Site survey report is prepared and provided to designer in accordance with workplace procedures
  • 2.6Designer, and other qualified person/s if required, are consulted and briefed on client expectations and requirements
  • 2.7Designer, and other qualified person/s if required, are consulted and briefed on site access, conditions, risks and potential installation issues
  • 2.8Options for grid-connected photovoltaic and battery storage equipment to meet site requirements and client expectations are discussed with designer, and other qualified person/s if required
  • 2.9Placement of system components is considered, and any restrictions or issues of concern noted
  • 2.10Final site survey report is prepared after consultation with designer

Performance evidence

  • applying relevant work health and safety (WHS)/occupational health and safety (OHS), and risk assessment and control procedures
  • identifying all relevant stakeholders and qualified personnel required to complete site survey
  • communicating effectively with clients to discuss: requirements for site assessment and information to be collected
  • communicating effectively with clients to discuss: roles/responsibilities of people involved in design, installation and maintenance
  • communicating effectively with clients to discuss: industry standards, building/electrical regulations and codes, and risk minimisation relevant to the installation
  • communicating effectively with clients to discuss: benefits and options of photovoltaic and battery storage systemsand energy management
  • undertaking site survey safely and documenting findings including: potential site hazards that may impact installation
  • undertaking site survey safely and documenting findings including: site access, layout, distances and building structures
  • undertaking site survey safely and documenting findings including: solar access and shading
  • gathering information about existing electrical installation and any existing energy generation elements
  • current energy usage including maximum power and energy demand
  • current and expected future energy generation needs including maximum power demand
  • working with qualified personnel as required to complete site survey
  • options for suitable photovoltaic generating systems
  • options for suitable battery storage systems
  • options for placement of system components, any restrictions or issues of concern
  • potential installation problem/s and recommend solutions
  • producing final site survey report

Knowledge evidence

  • relevant WHS/OHS requirements including: risk assessment and mitigation processes
  • relevant WHS/OHS requirements including: safe work method statements (SWMS)/job safety assessments or risk control processes prior to site visit
  • relevant WHS/OHS requirements including: legislated requirements
  • relevant WHS/OHS requirements including: roof access and working at heights
  • relevant WHS/OHS requirements including: electrical safety
  • basic energy principles
  • relevant manufacturer specifications
  • relevant standards, building regulations and codes of practice
  • stakeholders, required personnel and roles and responsibilities of people involved in design, installation and maintenance
  • methods for identifying and recording existing electrical infrastructure
  • relevant local, state and commonwealth requirements
  • site survey process and information to be gathered, recorded and analysed
  • energy assessment and review including: methods for discussing with client energy use patterns and future plans in energy use
  • energy assessment and review including: methods for collecting energy usage and patterns
  • energy assessment and review including: consideration of appropriate energy efficient appliances and technologies
  • energy assessment and review including: data sources
  • energy services required by the electrical installationgrid-connected photovoltaic systems including: different equipment types their componentry and configuration
  • energy services required by the electrical installationgrid-connected photovoltaic systems including: factors that impact equipment type selection related to site and usage characteristics
  • energy services required by the electrical installationgrid-connected photovoltaic systems including: basic design, installation, and maintenance requirements
  • energy services required by the electrical installationgrid-connected photovoltaic systems including: connection limitations, requirements
  • energy services required by the electrical installationgrid-connected photovoltaic systems including: basic configuration of a PV array
  • energy services required by the electrical installationgrid-connected photovoltaic systems including: environmental considerations and required approvals
  • grid-connected battery storage systems including: methods of battery storage
  • grid-connected battery storage systems including: fundamentals of battery storage
  • grid-connected battery storage systems including: different energy storage technologies, associated componentry and system configuration
  • grid-connected battery storage systems including: factors that impact equipment type selection related to site and usage characteristics
  • grid-connected battery storage systems including: life expectancy
  • grid-connected battery storage systems including: basic design, installation and maintenance requirements
  • grid-connected battery storage systems including: basic operation of battery storage systems and integrated systems
  • installation considerations and requirements for grid-connected photovoltaic and battery storage systems
  • electrical diagrams for a RE system including: functional block diagrams for typical grid-connected RE system configurations
  • electrical diagrams for a RE system including: architectural and site diagrams to show the locations of equipment, fittings and cabling

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing UEERE0054

What does an assessment tool for UEERE0054 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEERE0054 needs to address all 68 unit components: 2 elements with 18 performance criteria, 18 performance evidence requirements, 32 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for UEERE0054?

Auditori pulls the current release of UEERE0054 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEERE0054 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing UEERE0054 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEERE0054, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your UEERE0054 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate UEERE0054 free