UEERA0099Install, commission, service and maintain air conditioning systems

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for UEERA0099 must cover

62 assessable components: 7 elements (37 performance criteria), 10 performance evidence and 15 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Prepare to install air conditioning systems

  • 1.1WHS/OHS risk control measures and procedures for carrying out the work are obtained and implemented in accordance with workplace procedures
  • 1.2Work details are determined from documentation and/or supervisor to establish scope of work to be completed in accordance with workplace procedures
  • 1.3Components, piping, accessories, controls and consumables for the installation work are obtained and checked against job requirements in accordance with industry standards and codes of practice
  • 1.4Tools, equipment and testing devices to complete work are obtained in accordance with workplace procedures and checked for operational safety in accordance with workplace procedures

2 Select, install, replace and terminate low voltage (LV) and extra-low voltage (ELV) cables within air conditioning equipment.

  • 2.1Cable conductor sizes are selected to meet the equipment manufacturer specifications, current-carrying capacity requirements
  • 2.2Reasons for selections made are documented in accordance with established procedures
  • 2.3Cables are installed and replaced to comply with technical standards, job specifications and relevant State/Territory legislation and regulations and with sufficient access to affect terminations
  • 2.4Cables and conductors are terminated at accessories in accordance with manufacturer specifications and regulatory requirements
  • 2.5Safety inspection of installed cables and testing of installed circuits are undertaken and any defects are rectified
  • 2.6‘As-installed’ cables/wiring are documented and appropriate person/s notified in accordance with established procedures

3 Install non-ducted split air conditioning systems

  • 3.1All required major components are securely mounted in the locations identified by the documentation or the supervisor in accordance with workplace procedures
  • 3.2Refrigerant pipe work and associated components are installed according to specifications ensuring all connections and tube cleanliness are in accordance with requirements and workplace procedures
  • 3.3Pressure testing of the installed components and pipe work is conducted to the required level for the type of refrigerant being used in accordance relevant codes of practice and industry standards
  • 3.4Leaks are located and rectified employing appropriate methods in accordance with relevant codes of practice and industry standards
  • 3.5Air conditioning system is evacuated to remove moisture and other contaminates in accordance with relevant codes of practice and industry standards
  • 3.6Vacuum drop test is carried out to verify all moisture and other contaminants have been removed from the system in accordance with relevant codes of practice and industry standards
  • 3.7Power and control circuit wiring is checked to ensure it conforms to circuit diagram specifications and system is electrically safe to energise in accordance with relevant codes of practice and industry standards

4 Install ducted split air conditioning systems

  • 4.1Major components are securely mounted in the locations identified by the documentation or the supervisor in accordance with workplace procedures
  • 4.2Flexible ductwork, associated fittings and flow control devices are installed according to specifications ensuring all connections are in accordance with workplace procedures and industry standards
  • 4.3Refrigerant pipework and associated components are installed ensuring all connections and tube cleanliness is maintained at all times in accordance with workplace procedures and manufacturer specifications
  • 4.4Pressure testing of the installed components and pipe work is conducted to the required level for the type of refrigerant being used in accordance with relevant industry standards and workplace procedures
  • 4.5Leaks are located and rectified employing appropriate methods in accordance with industry standards and codes of practices
  • 4.6Air conditioning system is evacuated to remove moisture and other contaminates in accordance with industry standards, relevant codes of practices and workplace procedures
  • 4.7Vacuum drop test is carried out to verify all moisture and other contaminants have been removed from the system in accordance with industry standards, relevant codes of practices and workplace procedures
  • 4.8Power and control circuit wiring is checked to ensure it conforms to circuit diagram specifications and system is electrically safe to energise in accordance with industry standards, relevant codes of practices and workplace procedures

5 Commission air conditioning systems

  • 5.1Air conditioning system is charged with the appropriate type and quantity of refrigerant in accordance with industry standards, relevant codes of practices and workplace procedures
  • 5.2Measurements are obtained and recorded to confirm that the refrigerant charge is optimal in accordance with the system’s design and manufacturer specifications
  • 5.3Control devices installed in the air stream for air flow quantity and distribution control are adjusted in accordance with the system’s design and manufacturer specifications
  • 5.4Measurements are obtained and recorded to confirm that air flow quantities and distribution is optimal in accordance with the system’s design and manufacturer specifications

6 Locate and rectify faults and carry out maintenance on air conditioning systems

  • 6.1Fault diagnosis is carried out in accordance with industry standards, relevant codes of practices and workplace procedures
  • 6.2Fault-finding and rectification processes are carried out effectively without damage to the system and components in accordance with relevant codes of practice, industry standards and workplace procedures
  • 6.3System is returned to an operational state in accordance with workplace procedures and manufacturer specifications
  • 6.4Components that require routine maintenance are identified and regularly maintained in accordance with relevant timeframes, industry standards and workplace procedures

7 Complete work and report activities

  • 7.1WHS/OHS risk control measures continue to be applied in accordance with workplace procedures
  • 7.2Worksite and equipment are cleaned and made safe in accordance with workplace procedures
  • 7.3Refrigerant usage is recorded in accordance with relevant industry regulations and codes of practice
  • 7.4Supervisor is notified of task completion in accordance with workplace procedures

Performance evidence

  • applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements
  • commissioning a ducted air conditioning system, including the adjustment of supply and fresh air dampers to meet stated design flow rates
  • locating and rectifying mechanical faults and electrical faults on air conditioning systems
  • maintaining air conditioning systems
  • recording values and reporting completion of work
  • selecting, replacing, installing and terminating extra-low voltage (ELV) cables within air conditioning systems.
  • selecting, replacing, installing and terminating damaged low voltage (LV) cables within air conditioning equipment according to relevant State/Territory legislation and regulations.
  • testing for electrical safety compliance.
  • installing a ducted split air conditioning system
  • installing a non-ducted split air conditioning system.

Knowledge evidence

  • air distribution, including: • air control damper types and applications • common fan types and applications • duct fitting types and applications • noise and vibration control methods • purpose of zoning, including advantages and disadvantages • relevant legislation, industry standards, codes of practice and regulations • rigid and flexible duct types and applications • supply and return air diffuser/grille types and applications
  • basic ducted split system selection for a residential application, including: • application of industry recognised check figures watts per square metre (W/m²) and manufacturers data • basic ductwork dimensioning employing a duct calculator • drawing a basic ductwork layout map • manufacturers design specifications and effects of operating the air conditioning system outside these conditions, including high/low ambient temperature and high relative humidity
  • Current-carrying capacity requirements of installed cables including: • identification of conductor size based on the maximum current requirement for a given installation condition, including any applicable derating factors • types of cables and applications • engaging appropriately qualified person to rectify any non-compliance • relevant State/Territory legislation, regulations and scope of work
  • commissioning air conditioning systems requirements and procedures, including: • basic air balancing techniques • techniques to determine operating values for a reverse cycle high wall split air conditioning system
  • common items identified on a preventative maintenance schedule, including the following air conditioning system types: • high wall splits • package units • split ducted
  • defrost (de-ice) operation, including activation and termination conditions
  • equipment installation requirements and procedures, including: • location considerations for outdoor and indoor units, including exposure, prevailing winds and noise regulations • maintaining structural integrity, including weight being applied and cutting of trusses/beams • maintenance of fire rating integrity • reading and interpreting manufacturer instructions • relevant legislation, industry standards, codes of practice and regulations • requirements for condensate removal and/or drainage
  • fault finding and rectification of air conditioning systems requirements and procedures, including: • typical controller fault codes and use of manufacturer’s data • symptoms and rectification of typical abnormal system conditions • defrost initiation or termination failure • earthing short, including load circuit has connected with casing and/or frame • high side sub-cooling too low/too high • incorrect phase rotation and scroll compressors • inefficient compressor, including reduced pumping capacity • inverter failure, including manufacturers recommended testing procedure • low side superheat too low/too high • non-condensables • open circuit • refrigerant overcharge and undercharge • restricted filter drier • shunted short, including load is internally shorted causing lower resistance
  • package units, including construction, applications and installation
  • reading and interpreting single phase wiring and pipe work schematics for a typical cooling only room air conditioner
  • reading and interpreting single phase wiring and pipe work schematics for a typical reverse cycle high wall split air conditioner
  • reading and interpreting three phase wiring and pipe work schematics for a typical reverse cycle package unit
  • relevant standards, codes and requirements applicable to the installation of cables
  • techniques for replacing and installing cables and wiring systems within air conditioning equipment: • application of wiring accessories • cable and conductor terminations • drawing-in, placing and fixing of cables • inspecting and testing installed and terminated cables to ensure they comply and are safe to reconnect to the supply • maintaining fire rating integrity
  • ventilation, including: • fresh air requirements in accordance with relevant industry standards • common methods, including natural, supply and exhaust • relevant legislation, industry standards, codes of practice and regulations.

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing UEERA0099

What does an assessment tool for UEERA0099 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEERA0099 needs to address all 62 unit components: 7 elements with 37 performance criteria, 10 performance evidence requirements, 15 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for UEERA0099?

Auditori pulls the current release of UEERA0099 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEERA0099 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing UEERA0099 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEERA0099, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your UEERA0099 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate UEERA0099 free