UEERA0049 — Install and start up single head split air conditioning and water heating heat pump systems
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for UEERA0049 must cover
65 assessable components: 4 elements (29 performance criteria), 17 performance evidence and 19 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Prepare to assemble, install and start up split air conditioning and water heat pump system
- 1.1WHS/OHS hazards, risk control methods, relevant standards, codes and legislation are obtained and applied in accordance with workplace procedures
- 1.2Safety hazards which have not previously been identified are assessed, reported and advice on risk control measures sought from supervisor
- 1.3Work activities are sequenced in accordance with job schedule
- 1.4Relevant person/s is consulted to ensure the work is coordinated effectively with others involved on the worksite
- 1.5Layout of pipe work to be installed is determined from job/task details, including manufacturer specifications and diagrams
- 1.6Materials needed to carry out the work are obtained in accordance with workplace procedures and checked against job/task requirements
- 1.7Tools, equipment and testing devices are obtained in accordance with workplace procedures and checked for operation and safety
- 1.8Appropriately licensed electrician is confirmed to carry out electrical work for the air conditioning and water heat pump system
- 1.9Appropriately licensed plumber is confirmed to carry out mains water piping work for the heat pump hot water system
- 1.10Preparatory work is checked to ensure no damage has occurred and complies with job/task requirements in accordance with workplace procedures
2 Assemble, install and start up split air conditioning and water heat pump system
- 2.1Split air conditioning and water heat pump system components are positioned and assembled in accordance with workplace procedures, manufacturer instructions and industry standards
- 2.2Interconnecting refrigerant piping/tubing is prepared and installed in accordance with workplace procedures, manufacturer instructions and industry standards
- 2.3Components are pressure tested and evacuated in strict accordance with manufacturer instructions, industry standards and codes of practice
- 2.4Condensate drains are prepared and installed to the units in accordance with workplace procedures, manufacturer instructions, industry standards and local regulatory requirements
- 2.5The refrigerant service valves are opened on the pre-charged outdoor unit to enable the refrigerant to enter the evacuated pipe work and the connected unit in strict accordance with manufacturer instructions and industry standards
- 2.6Unplanned situations are discussed with relevant person/supervisor, documented and dealt with safely in accordance with workplace procedures
- 2.7Quality checks of installation and start-up are undertaken in accordance with workplace procedures
- 2.8Notification is given to relevant person/s that the split air conditioning and water heat pump system is ready for electrical and/or mains water connection in accordance with workplace procedures
- 2.9Split air conditioning and water heat pump work is carried out efficiently without waste of materials or damage to apparatus, circuits, the surrounding environment or services using relevant workplace sustainable energy principles in accordance with workplace procedures
3 Test single head split air conditioning and water heat pump system
- 3.1Split air conditioning and water heat pump system performance is inspected and tested in accordance with workplace procedures to ensure compliance with industry technical standards, manufacturer specifications and job/task requirements
- 3.2Worksite and equipment are cleaned and made safe in accordance with workplace procedures
- 3.3Work completion is documented and appropriate person/s notified in accordance with workplace procedures
4 Decommission split air conditioning and water heat pump system
- 4.1Refrigerant is pumped down and/or recovered from indoor unit, interconnecting refrigerant piping/tubing is removed, and indoor and outdoor refrigerant circuits are sealed in accordance with workplace procedures, manufacturer instructions and industry standards
- 4.2Licensed electrician is engaged in accordance with workplace procedures to isolate and disconnect electrical supply and cabling from air conditioning and water heat pump system
- 4.3Indoor and outdoor refrigerant pipework, water pipework, condensate drains and electrical conduits/cables are unmounted in accordance with workplace procedures
- 4.4Unplanned situations are discussed with appropriate person/s, documented and dealt with safely in accordance with workplace procedures
- 4.5Split air conditioning and water heat pump work is carried out efficiently without waste of materials or damage to apparatus, circuits, the surrounding environment or services using relevant workplace sustainable energy principles
- 4.6Worksite and equipment are cleaned and made safe in accordance with workplace procedures
- 4.7Work completion is documented and appropriate person/s notified in accordance with workplace procedures
Performance evidence
- applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements, including using risk control measures
- applying safe working practices and relevant legislation, industry standards, codes of practice and regulations
- applying sustainable energy principles and practices
- assembling, installing and starting up split air conditioning and/or water heat pump system
- dealing with unplanned events/situations in accordance with workplace procedures in a manner that minimises risk to personnel and equipment
- decommissioning split air conditioning and/or water heat pump system
- determining job/work task requirements and applying workplace procedures, including making equipment/worksite safe
- documenting work activities
- giving notification to appropriate person/s for electrical connections to be completed
- implementing risk control measures
- inspecting and testing single head split air conditioning and/or water heat pump system and documenting performance to manufacturer specifications, including undertaking functional performance checks
- making equipment and worksites safe through leak testing and fitting of caps to refrigerant access ports to stop refrigerant escaping into the environment
- positioning and assembling system components to specifications
- installing and connecting refrigerant piping
- installing and connecting condensate drain piping
- preparing to assemble, install and start up a single head split air conditioning system and/or water heat pump system with a maximum cooling/heating capacity of less than 18 kilowatt (kW)
- pressure testing and evacuating system using manufacturer instructions.
Knowledge evidence
- condensate drain pipe work installation and connections
- refrigerant pipe work installation and connections
- relevant A1 and A2L class refrigerant, systems, piping, tools and equipment
- relevant codes of practice, industry standards, regulations and WHS/OHS legislated requirements, including:
- AS/NZS 5141 Residential heating and cooling systems - Minimum applications and requirements for energy efficiency, performance and comfort criteria
- AS/NZS 5149.3 Refrigerating systems and heat pumps - Safety and environmental requirements - Installation site
- AS/NZS 5149.4 Refrigerating systems and heat pumps - Safety and environmental requirements - Operation, maintenance, repair and recovery
- Australia and New Zealand Refrigerant Handling Code of Practice - Part 2 Systems other than self-contained low charge systems
- Ozone Protection and Synthetic Greenhouse Gas Management Regulations
- relevant manufacturer specifications and instructions relevant risk mitigation processes, including safe working practices and risk control measures
- relevant workplace documentation
- relevant workplace policies and procedures
- role of licensed electrician/plumber
- split air conditioning and water heat pump (maximum plant capacity for each system is 18 kW), including:
- decommissioning split system requirements and procedures installing split systems, including manufacturer instructions, location, mounting and connecting pipe work
- single head split air conditioning system (up to 18 kW) types, applications, major components, controls, operation and operating conditions
- split system start-up, including manufacturer instructions, pressure testing, evacuation, checking refrigerant charge, adding refrigerant, leak detection and checking function and performance.
- split water heating heat pump system (up to 18 kW) types, applications, major components, controls, operation and operating conditions
- sustainable energy principles and practices.
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing UEERA0049
What does an assessment tool for UEERA0049 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEERA0049 needs to address all 65 unit components: 4 elements with 29 performance criteria, 17 performance evidence requirements, 19 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for UEERA0049?
Auditori pulls the current release of UEERA0049 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEERA0049 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing UEERA0049 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEERA0049, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- UEERA0001 — Analyse the operation of HVAC air and hydronic systems
- UEERA0002 — Analyse the psychrometric performance of HVAC/R systems
- UEERA0003 — Analyse the thermodynamic performance of HVAC/R systems
- UEERA0004 — Analyse vibration and noise in refrigeration and air conditioning systems
- UEERA0005 — Apply safety awareness and legal requirements for ammonia refrigerant
- UEERA0006 — Apply safety awareness and legal requirements for carbon dioxide refrigerant
- UEERA0007 — Apply safety awareness and legal requirements for flammable refrigerants
- UEERA0008 — Audit HVAC/R control systems for compliance with regulations and standards
- UEERA0009 — Audit energy use for commercial HVAC/R systems
- UEERA0010 — Commission complex heating, ventilation and air conditioning (HVAC) systems
- UEERA0011 — Commission complex refrigeration systems and equipment
- UEERA0012 — Commission complex refrigeration/air conditioning control systems
Your UEERA0049 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate UEERA0049 free