What an assessment for UEERA0039 must cover

143 assessable components: 3 elements (16 performance criteria), 14 performance evidence and 113 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Prepare to evaluate and report on energy management

  • 1.1WHS/OHS procedures are obtained and implemented in accordance with workplace procedures
  • 1.2WHS/OHS risk control measures and procedures for work are followed
  • 1.3The extent of evaluation is determined from building services, plant and machinery specifications and discussed with relevant person/s
  • 1.4Advice is sought from work supervisor to ensure work is coordinated effectively with others
  • 1.5Tools, testing devices and materials required for the work are obtained and checked for correct operation and safety in accordance with workplace procedures

2 Evaluate energy management

  • 2.1WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
  • 2.2Need to test or measure live work is determined in accordance with workplace procedures and WHS/OHS requirements
  • 2.3Energy management of building services, plant and machinery is applied to the evaluation process
  • 2.4Energy evaluation tests for each parameter under scrutiny are conducted in accordance with workplace procedures and test methods
  • 2.5Energy evaluation tests are conducted methodically and results/comments systematically noted
  • 2.6Unplanned situations are dealt with safely with the approval of authorised person/s
  • 2.7Evaluation is conducted without damage to systems, circuits, the surrounding environment and/or services using sustainable energy practices

3 Report on energy management

  • 3.1WHS/OHS work completion risk control measures and procedures are followed
  • 3.2Worksite is cleaned and made safe in accordance with workplace procedures
  • 3.3Results of energy management evaluation, including recommendations and justification for improvements, are documented
  • 3.4Energy evaluation report is forwarded to appropriate person/s in accordance with workplace procedures

Performance evidence

  • determining the extent of the evaluation
  • setting up and conducting appropriate examinations and tests
  • reporting evaluation, including recommendation for improving energy efficiency
  • dealing with unplanned events
  • applying environmental and sustainable energy principles and practices
  • applying relevant legislations, industry standards, codes of practice and regulations
  • applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements, including:
  • applying safe working practices
  • hazard identification and reporting
  • implementing risk control measures
  • determining need to test or measure live work
  • implementing energy management procedures for a building
  • performing energy evaluation tests
  • preparing to evaluate and report on energy management

Knowledge evidence

  • energy management fundamentals, safe working practices and relevant standards, codes and regulations, including:
  • typical energy sources and characteristics:
  • supply authorities
  • standard units of measurement
  • electricity
  • steam
  • hot water
  • high temperature hot water
  • town gas
  • liquefied petroleum gas (LPG)
  • solar
  • waste heat
  • petrol
  • diesel
  • energy usage:
  • office lighting
  • air conditioning systems
  • refrigeration systems
  • security systems
  • computer systems
  • standby/emergency systems
  • lifts and escalators
  • energy auditing process:
  • energy costs and tariffs
  • energy consumption
  • predicting future costs
  • plotting consumption trends
  • historical data
  • collecting information using surveys
  • comparisons of actual to recorded usage
  • energy balance
  • instrumentation
  • building management systems
  • estimating savings potential
  • system operation for energy efficiency:
  • types of systems
  • efficiency in building structures
  • operation of a vehicle fleet
  • proportion total energy consumption against individual systems
  • passive building design
  • preventative maintenance procedures
  • monitoring building management systems
  • operation of major and minor plant
  • inappropriate energy management procedures
  • building plant control systems
  • Australian Standards/local authority requirements
  • case studies
  • implementing energy management procedures for a building:
  • recording base year data
  • climatic conditions for locality
  • establishing energy costs and tariffs
  • building and systems surveys
  • payback period
  • survey analysis
  • energy conservation procedures
  • informing stockholders
  • recommendations and documentation
  • implementation issues
  • monitoring, evaluation and follow up
  • building management systems
  • building management systems, safe working practices and relevant standards, codes and regulations, including:
  • functions of a building management system:
  • autonomous functions
  • input/output (I/O)
  • general I/O
  • installation management items
  • energy management
  • risk management
  • information processing
  • objectives
  • building running costs
  • smoke control in accordance with AS 1668.1 The use of ventilation and air conditioning in buildings - Fire and smoke control in buildings
  • building management system hardware:
  • system architecture
  • communication devices
  • substations
  • personal computers
  • interfaces with other systems
  • input and output functions:
  • digital I/O
  • digital output with status feedback
  • analogue I/O
  • sensors
  • alarms
  • energy management:
  • night cycle
  • optimum stop/start
  • time and event programs
  • night purge
  • outside air percentage control
  • enthalpy control
  • power demand control
  • duty cycle
  • presence detection
  • lighting control
  • information processing functions:
  • computer systems
  • central system management
  • programs
  • system configuration and security
  • operator - machine interface
  • data points
  • risk and maintenance management:
  • system files
  • fire and intruder control
  • access control
  • building services, plant and machinery specifications
  • energy evaluation tests
  • relevant manufacturer specifications
  • relevant tools, equipment and testing devices
  • relevant WHS/OHS legislated requirements, including:
  • environmental and sustainable energy principles and practices
  • relevant workplace policies and procedures.

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing UEERA0039

What does an assessment tool for UEERA0039 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEERA0039 needs to address all 143 unit components: 3 elements with 16 performance criteria, 14 performance evidence requirements, 113 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for UEERA0039?

Auditori pulls the current release of UEERA0039 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEERA0039 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing UEERA0039 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEERA0039, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your UEERA0039 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate UEERA0039 free