UEERA0017Design complex air conditioning systems and select equipment

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for UEERA0017 must cover

131 assessable components: 3 elements (14 performance criteria), 9 performance evidence and 108 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Prepare to design complex air conditioning systems

  • 1.1WHS/OHS requirements and workplace procedures for a given work area are identified, obtained and applied
  • 1.2WHS/OHS risk control measures and workplace procedures are followed in preparation for the work
  • 1.3Scope of the refrigeration system is determined from the design brief and/or consultations with relevant person/s
  • 1.4Design development work is planned in accordance with workplace procedure for timelines in consultation with others involved

2 Design complex air conditioning systems

  • 2.1Relevant complex air conditioning processes and methods are applied to the design
  • 2.2Alternative concepts for design are evaluated in accordance with the design brief
  • 2.3Safety, functionality and budgetary considerations are incorporated in the design specifications
  • 2.4System design draft is checked for compliance in accordance with the design brief and relevant industry standards
  • 2.5System design is documented for submission to relevant person/s for approval
  • 2.6Unplanned events are dealt with in accordance with problem solving techniques and workplace procedures

3 Obtain approval for complex air conditioning systems design

  • 3.1System design is presented to customer and/or relevant person/s
  • 3.2Requests for alterations to the design are negotiated with relevant person/s in accordance with workplace procedures
  • 3.3Final design is documented and approval obtained from relevant person/s in accordance with workplace procedures
  • 3.4Quality of work is monitored in accordance with workplace procedures and relevant industry standards

Performance evidence

  • developing outlines of alternative designs
  • developing the design within the safety, regulatory, functional requirements and budget limitations
  • documenting and presenting design effectively
  • successfully negotiating design alteration requests
  • obtaining approval for final design
  • dealing with unplanned events
  • applying relevant work health and safety (WHS)/occupational health and safety (WHS/OHS) requirements, including using risk control measures
  • designing complex commercial refrigeration system
  • preparing to design complex air conditioning system

Knowledge evidence

  • complex heating, ventilation and air conditioning (HVAC) system design, safe working practices and relevant standards, codes and regulations, including:
  • HVAC load estimating of multiple zone and multi-storey buildings:
  • system design parameters:
  • human comfort
  • system requirements in accordance with AS 1668 The use of ventilation and air conditioning in buildings SAA refrigeration code
  • heat transfer calculations for complex structures and building components
  • heat and radiation transfer calculations through complex glass structures including various internal and external shading devices
  • indoor air quality
  • olfs and decipols
  • complex shading:
  • solar data, azimuth and altitude angles
  • shading from adjacent structures
  • computer software:
  • heat load estimating
  • building thermal performance analysis and simulation software
  • advanced psychrometrics:
  • complex psychrometric processes:
  • revise sensible cooling and heating and evaporative (adiabatic) cooling
  • cooling and dehumidification
  • cooling and dehumidification with high latent load
  • cooling and dehumidification all outdoor air
  • cooling and dehumidification all outdoor air with dehumidified air requirements less than supply air
  • cooling with evaporative humidification
  • cooling with near isothermal humidification
  • spray process to include cooling and dehumidification, cooling and humidification with heated spray water, heating and humidification
  • partial load processes
  • reheat
  • bypass of, RA only and mix of RA and OA
  • variable air volume
  • variable coil effective surface temperature
  • split coil, horizontal, vertical and intertwined
  • system performance:
  • saturation efficiency of sprayers
  • system capacity calculated from air quantity and enthalpy change
  • required plant capacity and airflow rates:
  • effects of coil bypass factor and ADP
  • calculation of dehumidified air quantity, using both TSH and ERSH methods
  • recap on psychrometrics formulae and charts:
  • properties of air
  • gas constants
  • derivation of air constants
  • combined gas laws
  • Dalton’s law of partial pressures
  • carrier’s equation
  • psychrometric property tables
  • psychrometric charts
  • air mixing equations
  • air quantity equations
  • indirect evaporative coolers
  • analysis of cooling coil selection and performance
  • psychrometric analysis of:
  • air conditioning in tropics
  • all outdoor air
  • LCV/HWF systems
  • psychrometric analysis using equations and tables
  • air conditioning system design:
  • design parameters for multi-storey building:
  • customer and objective
  • customer concept of environment desired
  • economic
  • client brief
  • relevant design criteria:
  • building purpose, location, orientation and shape
  • external environment ambient conditions
  • internal load diversity
  • thermal capacity behaviour
  • thermal load (full and partial)
  • zoning and building usage:
  • space and building
  • occupancies, single purpose and multi-purpose
  • system selection criteria:
  • economics
  • environment
  • control requirements
  • existing structures
  • new structures
  • system components
  • space for equipment and system
  • selection of appropriate system
  • system and applications:
  • design features, engineering procedures and controls
  • direct expansion - self-contained room/zone, heat pump, multi-zone fan-coils and central station
  • all water - room fan-coil
  • all-air - constant volume variable temperature, face and bypass, reheat, constant temperature variable volume, constant volume induction, dual-duct and dual-conduit
  • air water - induction unit and primary air fan-coil
  • HVAC energy conversation techniques:
  • heat recovery systems
  • night cycle
  • optimum stop/start
  • purge cycles
  • chiller/boiler/cooling tower sequencing
  • economy cycles (based on temperature or enthalpy)
  • supply air reset
  • supply water reset
  • condenser water temperature reset
  • power demand control
  • load limiting
  • load shedding
  • set point relaxation
  • ventilation cycles
  • plant - fixed OA to economy, boiler to electric reheat and constant volume to variable air volume (VAV)
  • cost-benefit (payback)
  • problem-solving techniques
  • relevant job safety assessments or risk mitigation processes
  • relevant manufacturer specifications
  • relevant WHS/OHS legislated requirements
  • relevant workplace budget, quality, policies and procedures
  • relevant workplace documentation.

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing UEERA0017

What does an assessment tool for UEERA0017 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEERA0017 needs to address all 131 unit components: 3 elements with 14 performance criteria, 9 performance evidence requirements, 108 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for UEERA0017?

Auditori pulls the current release of UEERA0017 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEERA0017 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing UEERA0017 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEERA0017, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your UEERA0017 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate UEERA0017 free