What an assessment for UEEIC0024 must cover
82 assessable components: 3 elements (16 performance criteria), 15 performance evidence and 51 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Determine integrated system scenario
- 1.1Customer requirements for scenes, events and controls in an integrated system are determined from job specifications and appropriate person/s
- 1.2Types and locations of integrated system loads are determined from job specifications and customer requirements
- 1.3Types and locations of control (input) devices of integrated system are determined from job specifications and customer requirements
- 1.4Budget for the integrated system is determined from customer and appropriate person/s
2 Plan integrated system
- 2.1Hazards are identified, risks assessed and control measures implemented
- 2.2Integrated system devices and capabilities are incorporated the system plan
- 2.3Number and types of output devices to meet scenario specified are chosen for compatibility with system loads
- 2.4Number and types of control (input) devices to meet system scenario specified are obtained
- 2.5Integrated systems are planned to comply with bus system and supply voltage parameters in accordance with job specifications
- 2.6Other control methods are considered in developing an integrated system plan in accordance with workplace procedures
- 2.7Integrated systems are planned within cost and budget constraints
- 2.8Final plan is documented and submitted to appropriate person/s for approval in accordance with workplace procedures
3 Implement integrated system installation
- 3.1Work health and safety (WHS)/occupational health and safety (OHS) risk control work measures and workplace procedures are followed
- 3.2Integrated system is arranged using appropriate topology in accordance with workplace procedures
- 3.3Connection chart/diagram between devices in the integrated system is developed in accordance with workplace procedures
- 3.4Appropriate cable for the bus system is selected and connected at devices and accessories using the methods and the polarity specified by manufacturer specifications
Performance evidence
- applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements, including implementing risk control measures
- arranging an integrated system using an acceptable topology
- complying with a given budget
- complying with manufacturer instructions/specifications
- considering other control methods in planning the integrated system
- dealing with unplanned events/situations in accordance with workplace procedures in a manner that minimises risk to personnel and equipment
- determining customer requirements for integrated system
- determining scenario specifications including number and types of control systems
- developing a connection chart/diagram
- developing appropriate topology for integrated system
- documenting integrated system plan
- identifying integrated system scenario
- implementing an integrated system installation
- planning installations of integrated system
- planning integrated system to comply with bus system and supply voltage parameters
Knowledge evidence
- acceptable and unacceptable topologies for a single network
- bus system parameters, including:
- how bus systems work
- network topology
- voltage and current limits
- cable type and length limits
- network impedance
- network and device status indication
- low voltage (LV) supply, voltage parameters and quality
- supply sources such as uninterruptable power supplies (UPS) and inverters may adversely effect voltage parameters and waveform
- cabling, including:
- insulation resistance testing precautions and prohibitions
- LV cable terminations and conductor size
- bus cable polarity and pairing, termination requirements and techniques
- field and enclosure segregation requirements related to related to relevant industry standards
- supply and load protection, including:
- conductors and protection device coordination
- protection on supply and load side of system devices
- use of residual current devices (RCDs)
- output devices, including:
- relay connections for extra-low voltage (ELV) and LV loads
- dimmer types
- supply and load connections for the various dimmer types
- installation requirements for input devices, including:
- passive infrared detectors
- light level control
- key inputs
- touch screens
- acceptable and unacceptable topologies for a single network
- connection chart/diagrams
- devices and connections for other control methods, including:
- distributed signalling interface (DSI) and gateway dimming and control
- devices and connections digital addressable lighting interface (DALI) dimming and control
- zero to 10 volts analogue control
- installation requirements for input devices
- installations of integrated systems for input devices, including passive infrared detectors, light level control, key inputs, and touch screens
- job specifications and customer requirements
- LV supply, voltage parameters and quality, including supply sources such as UPS and inverters which may adversely affect voltage parameters and waveforms
- manufacturer documentation
- relevant manufacturer specifications
- relevant safe work method statements (SWMS)/job safety assessments or risk mitigation processes
- relevant cabling industry standards, including:
- cable type and length limits, including network impedance
- how bus systems work and network topology
- voltage and current limits
- relevant WHS/OHS legislated requirements
- relevant workplace documentation
- relevant workplace policies and procedures
- risk control measures
- supply and load protection
- acceptable and unacceptable topology requirements for a single network
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing UEEIC0024
What does an assessment tool for UEEIC0024 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEEIC0024 needs to address all 82 unit components: 3 elements with 16 performance criteria, 15 performance evidence requirements, 51 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for UEEIC0024?
Auditori pulls the current release of UEEIC0024 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEEIC0024 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing UEEIC0024 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEEIC0024, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- UEEIC0001 — Analyse complex electronic circuits controlling fluids
- UEEIC0002 — Assemble, enter and verify operating instructions in microprocessor equipped devices
- UEEIC0003 — Assist in commissioning process and instrumentation control systems
- UEEIC0004 — Calibrate, adjust and test measuring instruments
- UEEIC0005 — Configure and maintain industrial control system networks
- UEEIC0006 — Design and configure Human-Machine Interface (HMI) networks
- UEEIC0007 — Design and use advanced programming tools, PC networks and HMI Interfacing
- UEEIC0008 — Design electronic control systems
- UEEIC0009 — Develop an electrical integrated system interface for access through a touch screen
- UEEIC0010 — Develop and test code for microcontroller devices
- UEEIC0011 — Develop electrical integrated systems
- UEEIC0012 — Develop structured programs to control external devices
Your UEEIC0024 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate UEEIC0024 free