TLIS4007 — Decommission mechanical signalling infrastructure and interlocking equipment from service
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for TLIS4007 must cover
36 assessable components: 3 elements (9 performance criteria), 14 performance evidence and 13 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Disconnect mechanical/interlocking equipment and components
- 1.1Required authorisation is confirmed to ensure safe train operations may continue after mechanical/interlocking equipment components are disconnected
- 1.2Hazards are identified, risks are assessed and control measures are implemented
- 1.3Mechanical/interlocking equipment and components are prepared to enable ready removal
- 1.4Mechanical/interlocking equipment components are removed from operational area and area is made safe
2 Modify, test and adjust remaining equipment
- 2.1Remaining equipment is modified as necessary to ensure compliance with job specifications
- 2.2Correct test equipment and procedures are identified
- 2.3Appropriate tests are correctly carried out in conjunction with other personnel to ensure operational compliance
3 Certify and secure operational equipment
- 3.1Operational readiness is confirmed and required documentation/certification is correctly completed and processed to allow for commissioning
- 3.2Equipment is locked and secured to ensure against unauthorised interference
Performance evidence
- adapting to differences in equipment in accordance with operating procedures
- applying relevant legislation and workplace procedures
- applying repair and testing practices and procedures
- identifying job hazards and taking required action to minimise, control or eliminate identified hazards
- implementing contingency plans
- interpreting and following operational instructions and prioritising work
- modifying activities depending on operational contingencies, risk situations and environments
- modifying, adjusting and testing remaining equipment correctly
- monitoring work activities in terms of planned schedule
- reading and interpreting relevant instructions, procedures, information, technical data and drawings
- reporting and/or rectifying identified problems, faults or malfunctions, in accordance with regulatory requirements and workplace procedures
- using hand and power tools
- using test equipment and testing techniques
- working systematically with required attention to detail without injury to self or others, or damage to goods or equipment
Knowledge evidence
- applicable state/territory legislated rail safety requirements, relevant codes of practice and/or guidelines
- fault diagnosis, fault rectification and problem solving
- hazards that may exist when decommissioning mechanical signalling infrastructure equipment and interlocking equipment from service, and ways of controlling the risks involved
- limitations and characteristics of mechanically operated signalling equipment
- principles of signalling
- problems that may occur when decommissioning mechanical signalling infrastructure equipment and interlocking equipment from service, and action that can be taken to report or resolve these problems
- rail industry standards for decommissioning mechanical signalling infrastructure equipment and interlocking equipment from service
- relevant rail danger zones
- relevant work health and safety (WHS)/occupational health and safety (OHS) and environmental procedures and regulations
- relevant recording and documentation procedures
- repair techniques
- testing and measuring procedures
- workplace procedures for decommissioning mechanical signalling infrastructure equipment and interlocking equipment from service
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing TLIS4007
What does an assessment tool for TLIS4007 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for TLIS4007 needs to address all 36 unit components: 3 elements with 9 performance criteria, 14 performance evidence requirements, 13 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for TLIS4007?
Auditori pulls the current release of TLIS4007 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for TLIS4007 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing TLIS4007 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of TLIS4007, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- TLIS0001 — Construct and assemble points and crossings
- TLIS0002 — Install and maintain surface track drainage
- TLIS0003 — Install turnouts
- TLIS0004 — Measure and mark track for resurfacing
- TLIS2004 — Install and maintain rail bonding systems
- TLIS2012 — Install and service rail lubrication equipment
- TLIS2013 — Install minor structures
- TLIS2020 — Install overhead wiring structure
- TLIS2028 — Install and replace transoms
- TLIS2030 — Carry out track ballasting
- TLIS2031 — Install railway sleepers
- TLIS2033 — Install and repair temporary track supports