TLIS2020 — Install overhead wiring structure
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for TLIS2020 must cover
42 assessable components: 4 elements (14 performance criteria), 13 performance evidence and 15 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Plan installation
- 1.1Work requirements are determined to identify scope of work and resources required
- 1.2Hazards are identified, risks are assessed and control measures are implemented
- 1.3Type of overhead wiring structure required for job is identified and organised
2 Prepare for installation
- 2.1Footings are prepared and excavated in accordance with rail industry standards and workplace procedures
- 2.2Formwork is installed in accordance with rail industry standards and workplace procedures
- 2.3Concrete reinforcing is installed in accordance with rail industry standards and workplace procedures
- 2.4Concrete is mixed and placed in accordance with rail industry standards and workplace procedures
- 2.5Hold down plates/bolts are placed into concrete to correct dimensions to enable fitting of overhead wiring structure
3 Install components
- 3.1Components are assembled onto bridge section as required in preparation for installation
- 3.2Masts and other components are positioned and installed as required in accordance with accepted workplace procedures
- 3.3Fastening systems are installed in accordance with rail industry standards to ensure the integrity of the overhead wiring structure
4 Complete documentation
- 4.1Required documentation procedures and processes are confirmed
- 4.2Documentation is filled in legibly and proofread
- 4.3Documentation is processed in accordance with workplace procedures
Performance evidence
- applying relevant workplace procedures
- checking compliance of work with job specifications
- identifying job hazards and taking required action to minimise, control or eliminate identified hazards
- installing overhead wiring structures
- interpreting and following operational instructions and prioritising work
- modifying activities depending on operational contingencies, risk situations and environments
- monitoring work activities in terms of planned schedule
- planning own work including predicting consequences and identifying improvements
- reading and interpreting relevant technical data, drawings, instructions and manuals
- reporting and/or rectifying identified problems, faults or malfunctions, in accordance with regulatory requirements, rail industry standards and workplace procedures
- selecting and using relevant equipment and tools in accordance with workplace procedures
- using levelling equipment in accordance with workplace procedures
- working systematically with required attention to detail without injury to self or others, or damage to equipment
Knowledge evidence
- applicable state/territory legislated rail safety requirements, relevant codes of practice and/or guidelines
- characteristics and relevant information on overhead wiring structures
- characteristics of plant and equipment, materials, transport, structures, hardware and components used in work activities
- emergency management plan
- hazardous situations and related personal protection measures
- hazards that may exist when installing overhead wiring structures and ways of controlling the risks involved
- problems that may occur when installing overhead wiring structures and action that can be taken to report or resolve these problems
- relevant earthmoving equipment and methods
- relevant information in workplace technical manuals and instructions
- relevant rail danger zones
- relevant rail industry standards
- relevant recording and documentation procedures
- relevant safeworking system and workplace procedures
- relevant work health and safety (WHS)/occupational health and safety (OHS) and environmental procedures and regulations
- workplace procedures for installing overhead wiring structures
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing TLIS2020
What does an assessment tool for TLIS2020 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for TLIS2020 needs to address all 42 unit components: 4 elements with 14 performance criteria, 13 performance evidence requirements, 15 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for TLIS2020?
Auditori pulls the current release of TLIS2020 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for TLIS2020 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing TLIS2020 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of TLIS2020, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- TLIS0001 — Construct and assemble points and crossings
- TLIS0002 — Install and maintain surface track drainage
- TLIS0003 — Install turnouts
- TLIS0004 — Measure and mark track for resurfacing
- TLIS2004 — Install and maintain rail bonding systems
- TLIS2012 — Install and service rail lubrication equipment
- TLIS2013 — Install minor structures
- TLIS2028 — Install and replace transoms
- TLIS2030 — Carry out track ballasting
- TLIS2031 — Install railway sleepers
- TLIS2033 — Install and repair temporary track supports
- TLIS2034 — Install and repair rail fastening systems
Your TLIS2020 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate TLIS2020 free