RIINHB322EConstruct multiple aquifer production bores

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for RIINHB322E must cover

96 assessable components: 4 elements (17 performance criteria), 47 performance evidence and 30 knowledge evidence requirements, plus 2 foundation skills. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1. Plan and design for constructing multiple aquifer bores

  • 1.1Obtain, interpret and confirm work requirements
  • 1.2Access, interpret and apply multiple aquifer drilling documentation and confirm work activity is compliant
  • 1.3Identify and minimise environmental issues and potential hazards, and assess and address risks within scope of own role and according to workplace procedures
  • 1.4Site a bore and design multiple aquifer bore according to work and legislative requirements
  • 1.5Select and wear personal protective equipment required for work activity
  • 1.6Communicate with other personnel at site according to work requirements and confirm briefings and handover details are communicated and received

2. Construct and develop multiple aquifer bores in line with established requirements

  • 2.1Drill and isolate target production zone from other formations
  • 2.2Log strata encountered during drilling according to workplace procedures
  • 2.3Confirm or amend bore design based on testing and encountered geology
  • 2.4Construct bore according to confirmed or amended design using advanced construction techniques (multiple casing strings and pressure cementing)
  • 2.5Undertake bore development until a continuous, clean supply of water is obtained, in accordance with acceptable and practical limits set by site, contractual or regulatory requirements
  • 2.6Estimate yield by using yield testing methodologies
  • 2.7Complete written bore construction record according to workplace procedures

3. Disinfect/decontaminate bore and drilling equipment in line with established requirements

  • 3.1Determine and monitor potential contaminants of drilling equipment
  • 3.2Disinfect/decontaminate bores and installed equipment constructed for potable supplies

4. Decommission bore holes in line with established requirements

  • 4.1Determine suitable decommissioning procedures for failed or unwanted bores and select appropriate materials
  • 4.2Seal the bore as per legislative requirements

Performance evidence

  • construct multiple aquifer production bores on at least three occasions, including:
  • planning and preparing for constructing multiple aquifer bores, including:
  • selecting a bore site to prevent contamination and minimise interference with other bores
  • selecting appropriate drilling method for planned geology in a multiple aquifer system (potential drilling methods include rotary air, rotary mud, sonic, cable tool and auger)
  • designing a multiple aquifer bore to ensure the exclusion of unsuitable waters and to prevent the inter-mixing of aquifers with different water quality or Standing Water Levels
  • constructing and developing multiple aquifer bores in line with established requirements, including:
  • drilling and isolating target production zone
  • identifying and logging strata encountered during drilling including aquifer and aquitard (confining layer) units
  • confirming or amending bore design based on testing and encountered geology, using:
  • sieve testing
  • lithological logging
  • geophysics testing
  • aquifer yields testing
  • water quality testing
  • selecting likely water entry mechanism from the formation to the bore including stainless steel screens, filter packs, slotted casing and open-hole
  • calculating and making up cement grout volumes and mixing grout component quantities, including:
  • cement powder
  • water
  • bentonite
  • other additives as required
  • calculating hole and annular volumes
  • calculating grout specific gravity
  • determining appropriate screen and filter pack configuration, accounting for:
  • formation grain size
  • screen aperture
  • annular space
  • filter pack mineralogy, including quartz sand
  • natural filter pack potential (formation)
  • constructing bore according to confirmed or amended design, including:
  • assembling and installing casings, seals and screens
  • installing filter pack
  • grouting
  • sealing intermediate and/or production casing strings or seal selected zones to complete grouting operations
  • continuing development until a continuous, clean supply of water is obtained
  • estimating yield by using methodologies of:
  • air lifting
  • pumping
  • disinfecting/decontaminating bore and drilling equipment in line with established requirements, including:
  • disinfecting bores and installed equipment using proprietary chemical solution
  • decommissioning bore holes in line with established requirements, including:
  • decommissioning failed or unwanted bores as required.
  • During the above, the candidate must:
  • locate and apply required documentation, standards, policies and procedures
  • select and wear personal protective equipment required for work activities
  • maintain plumbness and alignment of the hole within limitations
  • use a range of communication techniques and equipment essential to the safe completion of work activity, including hand, audible and other signals
  • meet written and verbal reporting requirements and procedures associated with equipment operations.

Knowledge evidence

  • key legislation required to construct multiple aquifer production bores
  • key policies, procedures and established requirements for constructing multiple aquifer bores, including those for:
  • Minimum Construction Requirements (MCR)
  • workplace health and safety
  • environmental practice
  • accidents and emergencies
  • safety data sheets (SDS)
  • housekeeping
  • key factors affecting multiple aquifer bore performance, including:
  • properties, uses and effects of and differences between:
  • single and multiple aquifers
  • drilling fluids
  • casings
  • cement (grout) additives
  • grout placement methods and procedures
  • hole preparation for cementing (grouting) operations
  • pressure cementing methods
  • results of sieve analysis
  • calculations for:
  • up hole velocity
  • specific gravity
  • cement mixes
  • screen design parameters
  • flow rates (including L/sec and GPM)
  • conversion from imperial to metric and vice versa
  • equipment processes, technical capability and limitations
  • casing strength and collapse characteristics
  • applications for wire-wound screens
  • screen design parameters to ensure appropriate entrance velocities
  • types of pathogens and contaminants including bacteria.

Foundation skills

  • Numeracy: Identifies and comprehends relevant mathematical information and formulae in relation to constructing multiple aquifer bores
  • Writing: Produces and completes workplace reports, including maintenance schedules using appropriate vocabulary, grammatical structures and conventions

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing RIINHB322E

What does an assessment tool for RIINHB322E need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for RIINHB322E needs to address all 96 unit components: 4 elements with 17 performance criteria, 47 performance evidence requirements, 30 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for RIINHB322E?

Auditori pulls the current release of RIINHB322E from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for RIINHB322E — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing RIINHB322E assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of RIINHB322E, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.