RIICTB305E — Install or replace super-structure members
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for RIICTB305E must cover
43 assessable components: 4 elements (23 performance criteria), 10 performance evidence and 7 knowledge evidence requirements, plus 3 foundation skills. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Plan and prepare to install or replace super-structure members
- 1.1Obtain, interpret and confirm work instructions
- 1.2Access, interpret and apply documentation required to install or replace super-structure members and confirm work activity is compliant
- 1.3Obtain and interpret emergency procedures, and identify steps required to respond to emergencies
- 1.4Select and wear personal protective equipment according to site requirements
- 1.5Confirm and identify requirements for complying with environmental protection, safety and traffic management signage requirements
- 1.6Identify, address and report environmental issues, potential hazards and risks
- 1.7Select plant, tools and equipment to carry out tasks and check for faults
- 1.8Identify, confirm, and locate materials required for work application
2 Install temporary supports
- 2.1Locate and level bed logs according to job requirements
- 2.2Bolt temporary headers to girders
- 2.3Position toms and jacks on bed logs according to job requirements
- 2.4Install temporary bracing according to job requirements
- 2.5Loosen existing bolts to allow movement and access
- 2.6Jack structure to allow removal of defective part according to job requirements
3 Install and secure members
- 3.1Remove defective members according to job requirements
- 3.2Measure and prepare members for installation according to job requirements
- 3.3Fit new members according to job requirements
- 3.4Apply durability treatments to new members
- 3.5Install connectors to new super-structure members according to job requirements
- 3.6Remove temporary supports after new members are secured
- 3.7Remove temporary headers and bed logs and return bridge to its settle point
4 Conduct clean-up activities
- 4.1Clear work area and dispose of or recycle materials according to site requirements
- 4.2Clean, check, perform maintenance on and store plant, tools and equipment according to manufacturer specifications and site requirements
Performance evidence
- install or replace super-structure members on at least two occasions, including:
- installing and removing temporary supports
- selecting and preparing timber
- applying preservatives
- marking out and cutting to size at least one corbel or girder for a super-structure.
- locate and apply required legislation, documentation, policies and procedures
- identify, report and record hazards and risks
- work with others to install or replace super-structure members that meets all required outcomes, including:
- communicating with others to receive and clarify work instructions
- using communication techniques and systems, including signage to advise others of work activity and exclusion zones.
Knowledge evidence
- legislation required to install or replace super-structure members
- policies, procedures and documentation required to install or replace super-structure members, including those relating to: site and equipment safety; hazard and risk management; emergency response; environmental protection; waste management; communication techniques and equipment; operational, maintenance and basic diagnostic procedures; site isolation and traffic control responsibilities; project quality requirements; job plans and specifications; site requirements; manufacturer specifications for required plant and equipment; workplace reporting requirements
- principles and techniques required to install or replace super-structure members, including those relating to: temporary support member installation and removal; super-structure members, including: corbels, transverse, stringers, girders, decking, kerbing, handrails; connection behaviour; shoring and jacking systems; timber grading; test boring; bridge foundations; bridge heritage; calculation of material requirements interpreting engineering drawings; durability treatments, including preservatives; bracing and loading
- types, characteristics, technical capabilities and limitations of plant and equipment required to install or replace super-structure members, including: drills; impact wrenches; shifting spanners; jacks; proprietary tools; wedges; oxy-acetylene equipment; rollers
- materials safety data sheet (SDS) compliance processes
- components of job safety analyses (JSAs), job safety environmental analyses (JSEAs), and safe work method statements (SWMs)
- civil construction terminology related to installing or replacing super-structure members.
Foundation skills
- Numeracy: Calculates basic measurements including mass and dimensions
- Oral communication: Identifies and interprets information from verbal instructions. Conveys information and instructions to others verbally
- Self-management: Monitors and minimises own exposure to worksite risks and hazards during work activities
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing RIICTB305E
What does an assessment tool for RIICTB305E need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for RIICTB305E needs to address all 43 unit components: 4 elements with 23 performance criteria, 10 performance evidence requirements, 7 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for RIICTB305E?
Auditori pulls the current release of RIICTB305E from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for RIICTB305E — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing RIICTB305E assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of RIICTB305E, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- RIICTB201E — Maintain timber bridges
- RIICTB202E — Apply bridge durability treatments
- RIICTB203E — Produce bridge drawings and sketches
- RIICTB301E — Undertake visual inspections
- RIICTB302E — Install temporary support members
- RIICTB303E — Erect temporary modular support systems (baileys) on existing bridges
- RIICTB304E — Install or replace sub-structure members
- RIICTB306E — Splice and connect timber members
- RIICTB307E — Assemble and disassemble temporary modular bridges
- RIICTB308E — Install or replace truss members
- RIICTB309E — Construct, maintain and remove coffer dams
- RIICTB310E — Construct specialised timber deck systems
Your RIICTB305E assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate RIICTB305E free