What an assessment for RIICRC308E must cover
68 assessable components: 6 elements (20 performance criteria), 27 performance evidence and 18 knowledge evidence requirements, plus 3 foundation skills. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Plan and prepare to conduct paver operations
- 1.1Obtain, interpret, clarify and confirm work requirements
- 1.2Access, interpret and apply paver operations documentation and confirm work activity is compliant
- 1.3Identify and address potential risks, hazards and environmental issues, and implement control measures
- 1.4Select and wear personal protective equipment according to site requirements
- 1.5Identify, obtain, confirm and implement signage requirements
- 1.6Select plant, tools and equipment required to carry out tasks and check for faults
2 Conduct paver pre-operational checks
- 2.1Carry out pre-start and start-up procedures according to manufacturer specifications and site requirements
- 2.2Check paver controls and functions according to manufacturer specifications and site requirements
- 2.3Rectify or report any faults identified according to site requirements
3 Operate paver
- 3.1Identify operating techniques to specified output and tolerances according to manufacturer specifications and site and job requirements
- 3.2Operate paver according to manufacturer specifications and site and job requirements
4 Relocate paver
- 4.1Drive paver on highways and construction sites according to manufacturer specifications and site and job requirements
- 4.2Prepare paver for relocation according to manufacturer specifications and site and job requirements
- 4.3Carry out park and shutdown procedures according to manufacturer specifications and site requirements
5 Carry out plant maintenance
- 5.1Conduct inspection and fault finding according to manufacturer specifications and site requirements
- 5.2Carry out routine operational servicing and lubrication tasks according to manufacturer specifications and site requirements
- 5.3Carry out minor maintenance according to manufacturer specifications and site requirements
- 5.4Record machine performance according to site requirements
6 Conduct clean-up activities
- 6.1Clear work area and recycle or dispose of materials according to site requirements
- 6.2Clean, check, maintain and store plant, tools and equipment according to manufacturer specifications and site requirements
Performance evidence
- conduct paver operations on at least two occasions, including:
- laying at least five sections of straight paving, including:
- laying at least one of section of at least 100 metres
- placing at least three intersections
- conducting paver pre-operational checks and rectifying or reporting any faults, including serviceability checks for:
- brakes
- implements
- attachments
- manoeuvrability
- operating paver according to manufacturer specifications and site and job requirements
- relocating paver according to manufacturer specifications and site and job requirements
- carrying out plant maintenance
- clearing work area and disposing of, recycling or storing materials
- cleaning, checking, maintaining and storing plant, tools and equipment
- writing records of paver machine performance.
- locate and apply required documentation, policies and procedures and confirm work activity is compliant
- implement the requirements, procedures and techniques to conduct paver operations, including:
- identifying and applying required specifications to all work activities
- identifying, addressing and reporting potential hazards and risks
- identifying, obtaining, confirming and implementing signage requirements
- selecting and checking for faults all plant, tools and equipment required to carry out tasks
- identifying, addressing and reporting environmental issues and ground conditions
- work with others to conduct paver operations in a way that meets required outcomes, including:
- preparing for and organising work activities to meet task requirements
- communicating with others to receive and clarify work instructions
- using communication techniques and aids to advise others of work activity and exclusion zones
- monitoring movements and hazards and identifying and communicating changes to work environment.
Knowledge evidence
- legislation required to conduct paver operations
- policies, procedures and documentation required to conduct paver operations, including those relating to:
- site requirements
- manufacturer specifications for required plant and equipment
- relevant job specifications
- hazard and risk management
- environmental protection
- work activity set up procedures
- site isolation, signage, erecting barriers and traffic control
- work health and safety
- waste management
- workplace recording and reporting
- types, characteristics, technical capabilities and limitations of pavers and plant and equipment required to conduct paver operations
- principles and techniques for effective paver operations, including:
- pre-start, start-up, park and shutdown techniques, including serviceability checks
- techniques for laying straight paving and placing intersections
- paver relocation techniques
- paver operator maintenance techniques.
Foundation skills
- Numeracy: Calculates basic measurements including mass and dimensions
- Self-management: Monitors and minimises own exposure to worksite risks and hazards during activities
- Writing: Completes maintenance records using sector specific vocabulary, grammatical structures and work conventions
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing RIICRC308E
What does an assessment tool for RIICRC308E need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for RIICRC308E needs to address all 68 unit components: 6 elements with 20 performance criteria, 27 performance evidence requirements, 18 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for RIICRC308E?
Auditori pulls the current release of RIICRC308E from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for RIICRC308E — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing RIICRC308E assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of RIICRC308E, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- RIICRC201E — Repair potholes
- RIICRC202E — Install signs
- RIICRC203E — Install sub-soil drainage
- RIICRC204E — Install and maintain roadside fixtures
- RIICRC205E — Install utility poles
- RIICRC206E — Install pre-cast concrete crash barriers
- RIICRC207E — Install noise barriers
- RIICRC208E — Lay pipes
- RIICRC209E — Lay reinforced concrete box culverts
- RIICRC301E — Maintain drainage systems
- RIICRC302E — Place and form concrete kerb, channel and fixtures
- RIICRC303E — Lay pavers