MEM10022 — Commission and decommission high and low voltage equipment or installations
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for MEM10022 must cover
40 assessable components: 4 elements (18 performance criteria), 15 performance evidence and 7 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Determine job requirements
- 1.1Follow standard operating procedures (SOPs)
- 1.2Comply with work health and safety (WHS) requirements at all times, including appropriate risk control measures
- 1.3Use appropriate personal protective equipment (PPE) in accordance with SOPs
- 1.4Consult and obtain approval from authorised personnel the need to commission or decommission electrical equipment or installation
- 1.5Analyse and confirm commissioning, switching and work schedules, including drawings, plans and regulatory requirements
2 Prepare to commission or decommission electrical equipment or installation
- 2.1Inspect or confirm suitability and safety of electrical equipment or installation site for required commissioning or decommissioning
- 2.2Identify and obtain WHS policies and procedures related to the requirements for commissioning or decommissioning electrical equipment or installation
- 2.3Obtain necessary tools, equipment and testing devices needed for commissioning or decommissioning electrical equipment or installation
- 2.4Brief others participating in or affected by the work on commissioning or decommissioning of electrical equipment or installation
- 2.5Prepare the site according to the work schedule to minimise risk, disruption and damage to property, operations and individuals
3 Commission or decommission electrical equipment or installation
- 3.1Commission electrical equipment or installation using a systems approach, including the use of appropriate test equipment, in accordance with the approved commissioning schedule
- 3.2Verify that the performance of the installed equipment/installation through a series of tests is consistent with the customer requirements/specified design intent
- 3.3Capture and record performance data of the whole installation as the baseline for future operation and maintenance
- 3.4Decommission electrical equipment or installation using an approved decommissioning schedule, including the use of appropriate test equipment, according to requirements and established procedures
- 3.5Shut down and isolate sequentially electrical equipment or installation in preparation for repair or maintenance work using safe working practices
- 3.6Deal safely with unexpected situations during the isolation process, including, where required, the approval of an authorised person
4 Complete commission or decommission electrical equipment or installation
- 4.1Check work undertaken against work schedules for conformance with requirements and report anomalies in accordance with established procedures
- 4.2Document completion of commissioning or decommissioning of electrical equipment or installation in accordance with established procedures
Performance evidence
- following work instructions, standard operating procedures (SOPs) and safe work practices
- identifying and interpreting circuits, drawings, specifications, commissioning, decommissioning switching schedules and instructions relevant to the work to be undertaken
- preparing and following work plans associated with commissioning and decommissioning electrical equipment or installation in accordance with legislative and regulatory requirements, hazard and safety requirements
- complying with the Australian/New Zealand Wiring Rules and regulatory requirements for high voltage and low voltage electrical equipment and installations
- selecting the appropriate measuring and testing devices
- conducting briefing sessions to all personnel participating in or affected by the work
- preparing the site, including signage, barriers and warning devices
- commissioning electrical equipment or installation using a systems approach
- verifying the performance of the installed equipment/system to meet the design requirements through a series of tests/measurements
- making adjustments, where necessary, to ensure conformance with the specified design intent
- capturing and recording performance data of the whole installation as the baseline for future operation and maintenance
- decommissioning electrical equipment or installation
- shutting down and isolating electrical equipment sequentially in preparation for maintenance or repair using lock out and tag procedures and safe working practices
- seeking assistance from authorised personnel for site specific commissioning and decommissioning of electrical equipment and installations including the need for high voltage switching
- documenting completion of commissioning/decommissioning process in accordance with SOPs.
Knowledge evidence
- safe work practices and procedures and use of personal protective equipment (PPE)
- Australian/New Zealand Wiring Rules and regulatory requirements for high voltage and low voltage electrical installations
- industry personnel to be consulted for advice on commissioning or decommissioning procedures
- test and commissioning, including: - procedures required for a particular electrical equipment or installation - objectives to be achieved, including: - to verify proper functioning of the equipment/system after installation - to verify that the performance of the installed equipment/systems meet with the specified design intent through a series of tests and adjustments - to capture and record performance data of the whole installation as a baseline for future operation and maintenance - using a systems approach, including: - performance tests appropriate to equipment/installation to be commissioned - measurements required to ensure conformance to specifications - adjustments to be made to meet specified design and operational requirements - the use of appropriate test equipment
- decommissioning of electrical equipment or installation, including: - procedures required for a particular electrical equipment or installation - a working knowledge of the electrical equipment or installation in order to sequentially shut down and isolate for the purposes of repair and maintenance including using lock out and tag procedures to enable safe removal of equipment/conductors
- types of operational forms, access authorities, permits and requirements associated with high voltage switching
- reporting requirements relevant to the electrical equipment or installation being commissioned.
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing MEM10022
What does an assessment tool for MEM10022 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for MEM10022 needs to address all 40 unit components: 4 elements with 18 performance criteria, 15 performance evidence requirements, 7 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for MEM10022?
Auditori pulls the current release of MEM10022 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for MEM10022 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing MEM10022 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of MEM10022, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- MEM03001 — Perform manual production assembly
- MEM03002 — Perform precision assembly
- MEM03003 — Perform sheet and plate assembly
- MEM03004 — Perform electronic/electrical assembly (production)
- MEM03005 — Rework and repair (electrical/electronic production)
- MEM03006 — Set assembly stations
- MEM04001 — Operate melting furnaces
- MEM04002 — Perform gravity die casting
- MEM04003 — Operate pressure die casting machine
- MEM04004 — Prepare and mix sand for metal moulding
- MEM04006 — Operate sand moulding and core making machines
- MEM04007 — Pour molten metal