MEM10013 — Install split air conditioning systems and associated pipework
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for MEM10013 must cover
46 assessable components: 5 elements (21 performance criteria), 6 performance evidence and 19 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Determine job requirements
- 1.1Follow standard operating procedures (SOPs)
- 1.2Comply with work health and safety (WHS) requirements at all times
- 1.3Use appropriate personal protective equipment (PPE) in accordance with SOPs
- 1.4Identify job requirements from specifications, drawings, job sheets or work instructions
2 Locate split air conditioning components
- 2.1Determine the location of unit components, piping and drains in consultation with customer and other site considerations
- 2.2Ensure industry and local authority requirements, standards and codes and manufacturer requirements are identified, including the appropriate capacity rating of the equipment and any impacts on the installation are identified
3 Inspect and prepare installation sites
- 3.1Carry out all work safely to Australian Standards, state and local codes and regulations
- 3.2Prepare the installation site to industry codes of practice and manufacturer installation instructions, as appropriate
- 3.3Carry out the work without damage to the system, components and the surrounding environment or services
4 Prepare split system equipment and materials for installation
- 4.1Identify and note safety hazards and ensure established risk control measures are implemented
- 4.2Consult appropriate personnel to ensure the work is coordinated effectively with others involved on the worksite
- 4.3Check all components, piping and fittings for conformance to manufacturer specification, job requirements and applicable standards
- 4.4Determine the layout of the pipework from job specifications and diagrams
- 4.5Obtain materials needed to carry out the work in accordance with established procedures and check against job requirements
- 4.6Obtain tools, equipment and testing devices needed to conduct the work in accordance with established procedures and check for correct operation and safety
- 4.7Check preparatory work to ensure no damage has occurred and that it complies with work requirements
5 Prepare and install refrigerant pipework
- 5.1Use tools and equipment in accordance with manufacturers’ instructions
- 5.2Ensure pipework is prepared and joined to required specification with minimal wastage and damage/contamination to environment
- 5.3Join pipework and fittings using appropriate pipe joining methods
- 5.4Ensure pipes are run separately and insulated according to manufacturer instructions and to relevant standards codes and regulations
- 5.5Check pipework and joins for compliance and integrity using appropriate testing methods
Performance evidence
- following work instructions, standard operating procedures (SOPs) and safe work practices
- identifying and interpreting specifications, drawings, customer requirements, regulatory and legislative requirements for installing plug in split air conditioning systems and associated pipework up to 18 kW cooling capacity
- preparing the installation site for installing unit components to manufacturer requirements, standards, codes and regulations
- using tools and equipment to prepare and join pipework to specifications
- ensuring pipes are run separately and insulated to specifications and relevant standards, codes and regulations
- checking the installed system for compliance and integrity using appropriate testing methods and test equipment.
Knowledge evidence
- safe work practices and procedures and use of personal protective equipment (PPE)
- basic vapour compression cycle operating principles
- basic reverse cycle operating principles
- layouts, siting and set-ups of split air conditioning systems
- typical work environment, demands and considerations
- effective communication with appropriate persons and typical problems, contingencies and solutions
- components, accessories and fixtures for split air conditioning systems
- considerations for siting units and components and techniques and processes for site preparation
- fixing methods, tools and equipment for system components and pipework
- applicable legislative requirements, standards, codes and licensing requirements for installing system components, interconnecting wiring and connection to power supply
- applicable procedures for storage, handling and treatment of ozone depleting and synthetic greenhouse gas refrigerant
- sustainable energy practices for the efficient use of materials and for minimising damage/contamination to environment
- tools and equipment used for fabricating pipework
- pipe preparation and joining techniques including cutting, flaring, swaging and bending
- brazing/silver soldering techniques, equipment and consumables
- dry nitrogen being used during all brazing/silver soldering work
- procedures and equipment for checking pipework integrity and compliance to specification
- procedures for reporting non-conformances
- required documentation and procedures to complete and process.
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing MEM10013
What does an assessment tool for MEM10013 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for MEM10013 needs to address all 46 unit components: 5 elements with 21 performance criteria, 6 performance evidence requirements, 19 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for MEM10013?
Auditori pulls the current release of MEM10013 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for MEM10013 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing MEM10013 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of MEM10013, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- MEM03001 — Perform manual production assembly
- MEM03002 — Perform precision assembly
- MEM03003 — Perform sheet and plate assembly
- MEM03004 — Perform electronic/electrical assembly (production)
- MEM03005 — Rework and repair (electrical/electronic production)
- MEM03006 — Set assembly stations
- MEM04001 — Operate melting furnaces
- MEM04002 — Perform gravity die casting
- MEM04003 — Operate pressure die casting machine
- MEM04004 — Prepare and mix sand for metal moulding
- MEM04006 — Operate sand moulding and core making machines
- MEM04007 — Pour molten metal
Your MEM10013 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate MEM10013 free