What an assessment for CPCPRE2001 must cover

112 assessable components: 4 elements (23 performance criteria), 4 performance evidence and 85 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Access requirements to brace and prop prefabricated concrete elements.

  • 1.1Review and clarify prefabricated concrete installation task.
  • 1.2Review erection design documentation including task specifications and check to make sure they are in accordance with regulations and codes of practice.
  • 1.3Review work health and safety (WHS) requirements for the task in accordance with safety plans and policies.
  • 1.4Identify safety signage and barricade requirements.
  • 1.5Review environmental requirements for the task in accordance with environmental plans and legislative requirements.
  • 1.6Access plant, tools, equipment, braces props, the required material and their respective safety specifications to carry out task.
  • 1.7Access set-out drawings and the erection design documentation to verify the location of prefabricated concrete installations.

2 Prepare to brace and prop prefabricated concrete elements.

  • 2.1Erect identified safety signage and barricade requirements, and fit personal protective equipment (PPE).
  • 2.2Obtain plant, tools, equipment, check for serviceability and rectify or report any faults.
  • 2.3Check braces and props for serviceability and rectify or report any faults.
  • 2.4Check braces and/or props are correctly labelled with working load limit (WLL) in accordance with AS 3850 Prefabricated concrete elements.
  • 2.5Review erection plan and access information on job sequencing, team roles and coordinated activities.
  • 2.6Verify that the concrete strength of the elements to be braced and the concrete supporting elements for the braces and props have attained the specified minimum strength in accordance with the erection design documentation.

3 Conduct bracing and propping of prefabricated concrete elements.

  • 3.1Position braces and/or props in accordance with the erection design documentation and AS 3850 1,2 & 3 Prefabricated concrete elements.
  • 3.2Position levelling shims/packers to the nominated reduced level (RL) in accordance with the erection design documentation.
  • 3.3Prepare and install temporary and/or permanent braces and props, incorporating modifications, correct bolt and installation procedures in accordance with the erection design documentation and standards.
  • 3.4Clear all personnel from the drop zone during all lifting, handling and rotation operations.
  • 3.5Check that all support fixings are all correctly installed, checked and secured in accordance with the erection design documentation, with the correct tightening torque.
  • 3.6Confirm that the element is either adequately braced or fixed to and incorporated into the supporting structure prior to releasing the lifting equipment.
  • 3.7Check that the installed element is in the specified position and in accordance with the set-out drawings and erection design documentation.
  • 3.8Safely access lifting points and release lifting device in accordance with the instructions provided by the lifting clutch manufacturer.

4 Clean up.

  • 4.1Clear work area and dispose of, reuse or recycle materials in accordance with regulatory and workplace requirements.
  • 4.2Clean, check, maintain and store tools and equipment in accordance with manufacturer and workplace requirements

Performance evidence

  • bracing two prefabricated concrete elements of a height not less than 7 metres and width 3 metres:
  • one of which must be a prefabricated concrete wall panel braced with two braces
  • one of which must include both primary and secondary bracing elements (knee, end and lateral-bracing or double knee-braces)
  • propping two prefabricated concrete elements, one of which must end propping only, and the other to be continuously shored.

Knowledge evidence

  • compliance requirements of legislation, regulations, codes and Australian Standards relevant to brace and prop of prefabricated concrete elements:
  • AS 3850.1, 2 & 3 Prefabricated concrete elements
  • environmental protection and waste disposal
  • work health and safety (WHS) regulations, including:
  • Safe Work Australia ‘Guide to managing risk in construction: prefabricated concrete’ 2019
  • use of personal protective equipment (PPE)
  • fall protection
  • drop zones
  • hazardous substances
  • safe manual handling techniques
  • safe manual lifting procedures
  • risk assessment process for lifting and securing prefabricated elements erection design documentation:
  • set-out details
  • element mass
  • rigging diagrams
  • component geometry
  • the strength of concrete at the time of lifting and handling from the manufacturers’ “birth certificate” contained in the erection documentation
  • faulty manufacturing and concrete defects which could compromise the strength of the prefabricated elements and pose a potential safety issue for lifting and handling
  • types of drawings and specifications used to interpret concrete installation requirements
  • erection documentation
  • prefabricated concrete brace and prop specifications, including:
  • erection sequence
  • orientation of prefabricated concrete elements
  • bracing details, including type and angle
  • requirement for erection brace and prop footings
  • levelling shims
  • drawings
  • types of bracing, including:
  • single storey (drop-in) panel propping
  • double storey (spin-up) panel propping
  • panel to panel propping
  • beam propping
  • spandrels propping
  • column bracing
  • lateral bracing
  • end bracing
  • main bracing
  • knee bracing
  • deadman bracing
  • types of propping, including:
  • single props (Acrow)
  • single frame
  • continuous frame
  • types of concrete prefabricated elements, including:
  • dowell bar
  • panels
  • columns
  • beams
  • planks
  • stairs
  • barriers
  • workplace requirements when working with prefabricated concrete elements:
  • cleaning up the work area
  • maintaining and storing plant, labelling, tools and equipment
  • adhering to manufacturer specifications
  • reporting problems
  • quality
  • types of prefabricated concrete elements
  • types of support fixings, including:
  • brace footing
  • ferrule bolts
  • brace pins
  • fire rating requirements relevant to concrete prefabricated element rectification
  • workplace procedures related to communication protocols
  • principles of sustainability relevant to material reuse
  • logical task sequencing
  • types, characteristics and limitations of tools, equipment and materials required for propping and bracing prefabricated concrete elements, including:
  • hammers
  • jacks
  • podgers
  • spanners
  • spirit levels and automatic levels
  • tape measures
  • trolleys
  • wedges
  • wrenches
  • hammer lock
  • theodolite
  • post-installed anchors
  • bolting procedures
  • cast-in-threaded inserts for Class 4.6 bolts
  • concrete supporting elements, including:
  • floor slabs
  • piers
  • footings.

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing CPCPRE2001

What does an assessment tool for CPCPRE2001 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCPRE2001 needs to address all 112 unit components: 4 elements with 23 performance criteria, 4 performance evidence requirements, 85 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for CPCPRE2001?

Auditori pulls the current release of CPCPRE2001 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCPRE2001 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing CPCPRE2001 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCPRE2001, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your CPCPRE2001 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate CPCPRE2001 free