CPCPFS3049 — Conduct preventive maintenance on fixed fire pumpsets
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for CPCPFS3049 must cover
46 assessable components: 6 elements (25 performance criteria), 6 performance evidence and 15 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Prepare for work.
- 1.1Access, read and apply preventative maintenance on fixed pumpset requirements from relevant job plans and specifications, codes, Australian Standards, manufacturer’s specifications and jurisdictional requirements.
- 1.2Identify and apply workplace policies and procedures, work health and safety (WHS) and environmental requirements.
- 1.3Sequence tasks specified in relevant maintenance schedules.
- 1.4Identify materials and components and calculate quantities.
- 1.5Select and check serviceability of tools, equipment and personal protective equipment (PPE).
- 1.6Carry out preparation of work area for efficient preventive maintenance of fixed fire pumpsets.
- 1.7Check materials and components for conformity with delivery docket.
2 Perform preventive maintenance tasks on pump circulatory system.
- 2.1Isolate pump following workplace requirements before conducting maintenance tasks.
- 2.2Disassemble cooling line strainer, remove and inspect screen, and identify and report faulty materials.
- 2.3Clean screen and reassemble strainer following workplace procedures.
- 2.4Check operation of circulatory valve and replace valve if required.
- 2.5De-isolate pump, conduct start test, and check water flow at tundish or sight glass.
3 Perform preventive maintenance tasks on packing glands.
- 3.1Disassemble pump packing gland housing and remove gland plate.
- 3.2Remove and dispose of packing using appropriate packing extractors and following quality and environmental requirements.
- 3.3Repack gland following manufacturer’s instructions.
- 3.4Reinstall gland plate and adjust as required.
- 3.5De-isolate, operate and check pump to ensure packing gland leak rate meets manufacturer’s instructions and quality requirements.
4 Perform preventive maintenance tasks on special pump valves.
- 4.1Drain down pump pipework and check to ensure there is no residual water pressure.
- 4.2Disassemble special valves and inspect housing.
- 4.3Inspect internal components of special valves and install replacements.
- 4.4Reassemble special valves, de-isolate pump and check system to ensure it is operating correctly.
5 Report anomalies and complete documentation.
- 5.1Record inspection and testing results and report anomalies following quality requirements.
- 5.2Complete preventive maintenance documentation and forward to relevant persons for action.
6 Clean up.
- 6.1Clear the work area, and dispose of, reuse or recycle materials in accordance with state and territory legislation and workplace policies and procedures.
- 6.2Clean tools and equipment, check for serviceability and report any damage, and store and secure.
Performance evidence
- performing preventive maintenance on a diesel-driven, packed gland fixed fire pumpset in accordance with AS 2941 Fixed fire protection installations across two different jobs and include:
- a circulatory system
- a packing gland
- a pressure relief valve, and
- a pressure reducing valve
- performing system interfaces isolation of fire detection control indicating equipment (FDCIE) and fire pumpsets.
Knowledge evidence
- processes, procedures and techniques of:
- conducting preventive maintenance on fixed fire pumpsets
- isolating and draining down pump pipework
- characteristics, applications and limitations of approved materials and components:
- end suction pumps
- multistage multioutlet pumps
- screw pumps
- turbine pumps
- split case pumps
- pressure relief valves
- pressure reducing valves
- circulatory system
- how to access relevant information, including relevant job plans and specifications, codes, Australian Standards, manufacturer’s specifications and jurisdictional requirements. to conduct preventive maintenance on fixed fire pumpsets
- tools, materials and equipment used to conduct preventive maintenance on fixed fire pumpsets
- work health and safety (WHS) requirements to conduct preventive maintenance on fixed fire pumpsets.
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing CPCPFS3049
What does an assessment tool for CPCPFS3049 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCPFS3049 needs to address all 46 unit components: 6 elements with 25 performance criteria, 6 performance evidence requirements, 15 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for CPCPFS3049?
Auditori pulls the current release of CPCPFS3049 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCPFS3049 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing CPCPFS3049 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCPFS3049, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- CPCPFS2021 — Connect static storage tanks for fixed fire protection systems
- CPCPFS2022 — Install portable fire equipment
- CPCPFS3030 — Design fire sprinkler systems using pre-calculated charts and tables
- CPCPFS3031 — Fabricate and install fire hydrant and hose reel systems
- CPCPFS3034 — Install control valve assemblies, actuating devices and local alarms
- CPCPFS3036 — Install special hazard systems
- CPCPFS3037 — Install residential life safety sprinkler systems
- CPCPFS3038 — Test and maintain fire hydrant and hose reel installations
- CPCPFS3040 — Conduct basic functional testing of water-based fire-suppression systems
- CPCPFS3041 — Inspect and test fire pumpsets
- CPCPFS3042 — Conduct annual routine service of complex water-based fire-suppression systems
- CPCPFS3043 — Conduct functional water flow testing
Your CPCPFS3049 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate CPCPFS3049 free