CPCCWP5006 — Survey waterproofing systems
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for CPCCWP5006 must cover
133 assessable components: 4 elements (21 performance criteria), 21 performance evidence and 91 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Plan and prepare.
- 1.1Determine scope of survey in consultation with stakeholders, reports and project brief, building works or structural specifications.
- 1.2Gather and review design specifications and data sheets, manufacturers’ information, drawings and waterproofing contractors’ scopes of work.
- 1.3Assess site environmental conditions according to approved plans, including surface and sub-surface drainage.
- 1.4Confirm design complies with National Construction Code (NCC) performance requirements and Australian Standards.
- 1.5Determine tools, equipment and relevant technologies required for the survey according to site conditions.
- 1.6Develop the scope for the survey, including installation stages and compliance review.
2 Carry out survey.
- 2.1Establish stage inspection protocols and benchmarks for compliance with design and manufacturers’ specifications.
- 2.2Communicate survey procedures and timeframe in consultation with stakeholders.
- 2.3Conduct quality assurance inspections of the waterproofing systems, including substrate assessment for suitability, component installation and compliance with manufacturers’ specifications.
- 2.4Identify latent conditions outside of the waterproofing system design.
- 2.5Determine if installation complies with design requirements and manufacturers’ specifications.
- 2.6Record observations of survey of waterproofing systems for analysis.
3 Analyse survey report findings and make recommendations.
- 3.1Review report findings and confirm installation complies with manufacturer’s specifications, Australian Standards and NCC performance requirements.
- 3.2Identify and document any non-compliance regarding installation and deviation from design.
- 3.3Develop recommendations for remediation of non-compliances and any defects.
- 3.4Develop recommendations to remediate the latent conditions to assist with the remediation advice.
- 3.5Develop a report summary and quality control recommendations for stakeholders.
4 Evaluate survey findings and communicate recommendations.
- 4.1Review survey findings against waterproofing systems design.
- 4.2Review and confirm remediation of non-compliances and defects, including latent conditions.
- 4.3Review survey results to accommodate use of area at the highest risk level.
- 4.4Communicate survey findings and any recommendations to stakeholders.
Performance evidence
- The candidate must develop one (1) survey report for each of the below:
- an internal wet area
- an external above ground area
- a below ground system
- a remedial waterproofing system.
- The survey report must include a stage inspection or hold point report and final inspection report.
- The candidate must also provide a review of documentation or specifications for each waterproofing system above.
- One (1) or more of the survey reports must identify a latent condition and must include recommendations for a resolution of the latent condition.
- The survey reports must include:
- parameters of survey in accordance with stakeholders’ brief
- classification of wet areas
- assessment of waterproofing design against compliance with National Construction Code (NCC) performance requirements, Australian Standards, building design and use of area
- site conditions at the time of survey
- provision of stage inspection protocols and benchmarks for compliance with design and manufacturers’ specifications
- methodical collation of observations from survey
- review of observations against compliance of design and manufacturers’ specifications
- recommendations for remediation of defects and confirming compliant installation practices
- identify latent conditions outside of systems design
- recommendations to remediate the latent conditions to assist with the remediation advice
- provision of remedial scope and timeframe for remedial works to completion in accordance with survey report
- review of survey findings and recommendations against waterproofing design.
Knowledge evidence
- application of scientific methodology
- diagnostic procedures – non-destructive and destructive, including:
- site investigation
- knowledge of construction materials and their properties
- inspecting and testing protocols utilising factors and influences in accordance with risk levels, including:
- observation procedures
- establishing control areas and reference points
- analysing evidence
- utilising information from other sources, e.g., hydraulic and drainage reports, Bureau of Meteorology observations
- suitable technologies:
- thermal
- microwave
- ground penetrating radar (GPR)
- dye water testing
- impedance and capacitance technologies
- electronic field vector mapping
- high and low voltage holiday testing
- setting control parameters and testing values, including:
- calibration of testing equipment
- effects on testing equipment by site conditions and testing procedures
- contributing site factors, including:
- water ingress sources
- surface water pathways
- sub-surface water pathways
- properties of water and moisture movement
- gradient or falls
- hydrostatic pressure
- surface tension of finishes
- capillarity
- size and effectiveness of outfalls
- penetrations and intrusion points
- causes and effects of dampness in buildings, including the ingress of water, capillary action and surface and interstitial condensation and their remediation
- building elements and integration, including:
- product properties and compatibility with building elements
- installation methods and practices
- stages of installation and inspection benchmarks
- waterproofing systems design and relationship with building design
- physical aids to detection of moisture and water ingress and interpretation of results, including:
- flood testing
- targeted water testing
- thermal surveys
- moisture meters
- combination of aids
- hygrometric surveys
- NCC performance requirements relevant to wet areas tested, including:
- waterproofing
- weather proofing
- damp proofing
- condensation management
- Australian Standards and design requirements relevant to wet areas inspected
- waterproofing system manufacturers’ requirements, including:
- installation
- performance of system according to service conditions
- suitability of materials as fit for purpose
- compatibility of components within the system
- risk assessment of water ingress for the purposes of providing designed systems, including:
- assessment of service conditions
- risk and management of interstitial condensation within building elements as part of design
- consequence of defects affecting the use of the intended adversely affected areas as wet, damp or dry
- feasibility of repair of the waterproofing system
- properties of waterproofing systems available:
- substrate assessment and preparation
- combining components to form a system
- component compatibility in a combined system
- component properties for site conditions
- component installation practices
- system analysis for effectiveness
- stakeholders:
- architect
- engineer
- builder
- building owner
- consumer
- design team
- construction team
- certifier
- building surveyor
- regulators
- report content and communication of findings:
- types of diagnostic reports and structures, including:
- issue
- performance standard
- remedial action required
- tables and diagrams
- photographic evidence
- thermal imaging analysis
- interpreting measurement values
- references to Australian Standards and designs
- verbal communication strategies
- different audiences
- presenting evidence.
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing CPCCWP5006
What does an assessment tool for CPCCWP5006 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCCWP5006 needs to address all 133 unit components: 4 elements with 21 performance criteria, 21 performance evidence requirements, 91 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for CPCCWP5006?
Auditori pulls the current release of CPCCWP5006 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCCWP5006 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing CPCCWP5006 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCCWP5006, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- CPCCWP2001 — Handle waterproofing materials and components
- CPCCWP2002 — Use waterproofing tools and equipment
- CPCCWP2004 — Prepare surfaces for waterproofing application
- CPCCWP3001 — Apply waterproofing system to below ground level wet areas
- CPCCWP3002 — Apply waterproofing process to internal wet areas
- CPCCWP3003 — Apply waterproofing process to external above-ground wet areas
- CPCCWP3004 — Apply waterproofing remedial processes
- CPCCWP3005 — Assess construction waterproofing processes
- CPCCWP5001 — Design below ground waterproofing
- CPCCWP5002 — Design external above ground waterproofing
- CPCCWP5003 — Design waterproofing to internal wet area
- CPCCWP5004 — Determine origin of water and moisture ingress into buildings
Your CPCCWP5006 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate CPCCWP5006 free