What an assessment for CPCCON3048 must cover
50 assessable components: 6 elements (23 performance criteria), 5 performance evidence and 22 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Plan and prepare to construct tilt panels on site.
- 1.1Interpret tilt panel design specifications and drawings and clarify construction requirements with relevant persons.
- 1.2Plan work tasks to comply with relevant legislation, regulations, standards, codes, work health and safety (WHS), environmental and workplace requirements.
- 1.3Select and fit required personal protective equipment (PPE).
- 1.4Inspect work site, assess hazards and apply risk controls, including required signage and barricades.
- 1.5Select plant, tools and equipment, check for serviceability and rectify or report any faults.
- 1.6Calculate and acquire material quantities to meet task specifications and safely locate materials ready for use.
2 Set out and construct temporary casting bed.
- 2.1Select suitable area to construct casting bed in accordance with work instructions.
- 2.2Prepare ground to a flat surface in readiness for casting bed.
- 2.3Place and finish casting bed to meet work instructions.
- 2.4Coat casting bed with bond breaker in accordance with product specifications.
3 Set out work and prepare formwork for panel.
- 3.1Set out location and size of tilt panel in accordance with drawings and specifications.
- 3.2Prepare, place and fix tilt panel edge formwork, and plumb and align to specifications.
- 3.3Apply bond breaker to casting bed face or casting form face of previous panel to ensure ease of panel separation, in accordance with manufacturer requirements for dose and quantity.
- 3.4Apply form release agent to formwork in accordance with specifications.
4 Place and tie reinforcement and cast-in fittings
- 4.1Check reinforcement, accessories and cast-in fittings for conformity with design and engineering specifications.
- 4.2Position reinforcement, accessories and cast-in fittings in accordance with engineering drawings and specifications.
- 4.3Tie reinforcement in correct placement in accordance with engineering drawings and specifications.
5 Place, finish and cure concrete.
- 5.1Place concrete evenly and consolidate to specification using approved vibration method.
- 5.2Screed and finish concrete surface to specification ensuring cast-in fittings are clear.
- 5.3Apply required curing process.
- 5.4Strip edge formwork after final panel is cast, ensuring no damage to panels.
6 Clean up.
- 6.1Clear work area and dispose of, reuse or recycle materials in accordance with regulatory and workplace requirements.
- 6.2Clean, check, maintain and store plant, tools and equipment in accordance with manufacturer and workplace requirements.
Performance evidence
- constructing a casting bed for one tilt panel measuring at least 20 square metres
- constructing a formwork box for one tilt panel measuring at least 20 square metres
- constructing one tilt panel using a casting bed
- constructing one tilt panel using a formwork box
- The constructed tilt panels must include two of the following: blockouts, door and window penetrations, raking edges, waterproofing and decorative rebates.
Knowledge evidence
- compliance requirements of legislation, regulations and Australian Standards relevant to tilt panel construction tasks:
- environmental protection and waste disposal
- work health and safety (WHS)
- drawings and specifications used to interpret requirements for constructing tilt panels on site
- effects of weather and climatic conditions on the properties of concrete:
- detrimental effect of water addition to concrete properties
- precautions that should be taken to minimise any potential adverse effects when placing and curing concrete
- formwork and reinforcing techniques and componentry for tilt panels
- health risks associated with silica dust exposure
- processes for placing, finishing and curing concrete:
- approved vibration methods
- concreting levelling techniques
- techniques and processes for lifting inserts and positioning ferrules
- tensile strength of concrete panels
- tilt panel construction materials and techniques
- types, characteristics, uses and limitations of plant, tools and equipment used when constructing tilt panels on site
- workplace requirements for constructing tilt panels on site:
- cleaning up the work area
- maintaining and storing materials, plant, tools and equipment
- quality
- reporting problems
- safety requirements including personal protective equipment (PPE).
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing CPCCON3048
What does an assessment tool for CPCCON3048 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCCON3048 needs to address all 50 unit components: 6 elements with 23 performance criteria, 5 performance evidence requirements, 22 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for CPCCON3048?
Auditori pulls the current release of CPCCON3048 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCCON3048 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing CPCCON3048 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCCON3048, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- CPCCON2021 — Handle concreting materials and components
- CPCCON2022 — Select, use and maintain concreting plant, tools and equipment
- CPCCON3035 — Determine concrete supply requirements
- CPCCON3036 — Plan concrete work and brief team
- CPCCON3041 — Place concrete
- CPCCON3042 — Finish concrete
- CPCCON3043 — Cure concrete
- CPCCON3044 — Apply decorative finishes to concrete
- CPCCON3046 — Repair and rectify concrete
- CPCCON3047 — Cut concrete
- CPCCON3049 — Apply and finish sprayed concrete
- CPCCON3050 — Carry out high-performance concreting