What an assessment for CPCCDE5001 must cover

66 assessable components: 5 elements (46 performance criteria), 4 performance evidence and 13 knowledge evidence requirements, plus 3 foundation skills. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Plan for assessment of asbestos removal.

  • 1.1Confirm scope, timelines and budget for the project with the client and asbestos removalist.
  • 1.2Identify type of asbestos containing material (ACM), its location, friability and condition by reference to the asbestos register and consultation with workplace personnel and client.
  • 1.3Research and confirm legislation, regulations, code of practice and standards to inform the planning process, risk identification and to ensure a compliant and independent assessment process.
  • 1.4Prepare required reports in a timely manner and according to the requirements of the specific audience and the legislation, regulations, code of practice and standards.
  • 1.5Research and confirm characteristics of and health impacts from exposure to ACM and the rationale for air monitoring processes.
  • 1.6Identify accreditation framework and roles and responsibilities of personnel involved.
  • 1.7Identify processes used in the compliant removal of friable and non-friable asbestos using enclosures and leak testing, decontamination units, personal respirators and negative pressure equipment.
  • 1.8Collect, review and use worksite documentation to inform the planning process.
  • 1.9Define areas within the worksite where measurements are to be taken.
  • 1.10Select measuring equipment specific to the hazard and condition of the ACM, the environment, the activities being carried out and level of risk.
  • 1.11Recognise limits of own expertise and available equipment and seek expert advice and equipment as appropriate.
  • 1.12Undertake risk assessment and select suitable control measures.
  • 1.13Identify and source equipment, including personal protective equipment (PPE), required to carry out the job.
  • 1.14Document confirmed planning with the client, asbestos removalist and supervisor.

2 Collect site measurements and other data.

  • 2.1Arrange with and advise workers on-site of the requirement to collect information and data to facilitate the measurement and monitoring process.
  • 2.2Conduct site visit and complete a visual inspection in consultation with client and stakeholders and according to legislation, regulations, code of practice and standards.
  • 2.3Establish sampling schedule and strategy.
  • 2.4Identify and record effective air monitoring locations for each asbestos removal task.
  • 2.5Conduct sampling process in consultation with relevant site personnel and as stated in the standards specified for membrane filter method for estimating airborne asbestos fibres.
  • 2.6Revise sampling schedule and strategy after site inspection and in consultation with asbestos removalist and worksite manager or supervisor.
  • 2.7Develop and provide air monitoring program consisting of locations and schedule to asbestos removalist and supervisor.
  • 2.8Check operability of monitoring equipment according to manufacturer specifications, organisational procedures and professional standards.

3 Use measuring devices to collect site information and data.

  • 3.1Select air-monitoring equipment, check calibration records, calibrate equipment and determine appropriate flow rate according to accredited laboratory requirements and professional standards.
  • 3.2Use and maintain equipment correctly to accurately collect data.
  • 3.3Follow workplace safety procedures during the collection process.
  • 3.4Collect required volumes of air samples according to the membrane filter method, label and replace the filter holders according to the sampling schedule and plan.
  • 3.5Collect information and data and record results noting where samples were taken and ensuring compliance with chain of custody protocols.
  • 3.6Put in place processes and make checks to ensure all data is collected under the control of a NATA or other accredited laboratory and according to industry standards and legislative requirements.
  • 3.7Dismantle, decontaminate and dispose of parts or equipment according to regulations, code of practice and workplace procedures.
  • 3.8Store equipment correctly or make ready for re-use.
  • 3.9Service and maintain sampling equipment according to professional standards and manufacturer specifications.
  • 3.10Complete a visual inspection within enclosure and undertake air monitoring within the enclosure for areas where friable asbestos has been removed.
  • 3.11Complete a visual inspection of work area where non-friable asbestos has been removed.

4 Complete the monitoring process.

  • 4.1Label and prepare filter for despatch to the laboratory, ensuring correct handling procedures for filters and chain of custody requirements.
  • 4.2Seek confirmation of the exact nature of fibres where necessary.
  • 4.3Retain and store samples in labelled containers.
  • 4.4Assess site set-up, removal, breakdown and decontamination procedures according to legislative and code of practice requirements.
  • 4.5Implement documentation and processes to ensure the compliant transportation of samples.

5 Document results.

  • 5.1Interpret and evaluate results received from the NATA or other accredited laboratory against the recognised standard.
  • 5.2Perform further calculations as required on the technical data received from the NATA or other accredited laboratory.
  • 5.3Document outcomes from the technical analysis and make recommendations regarding exposure and control monitoring processes.
  • 5.4Liaise with asbestos removalist immediately if air monitoring results are above action levels.
  • 5.5Prepare concise, logical and accurate report that addresses regulatory requirements and is in the form required by audience.
  • 5.6Visually inspect worksite to ensure compliance with procedures prior to issuing a clearance certificate.
  • 5.7Complete and issue clearance certificate according to legislative, regulatory and code of practice requirements.
  • 5.8Retain and store results and records in a readily retrievable format according to regulatory requirements and standards.

Performance evidence

  • apply scientific and technical principles that underpin the asbestos containing material (ACM) removal assessment process
  • collect and handle samples in a manner that ensures the integrity of the sample complies with the protocols for the chain of custody
  • collect, compile, interpret and analyse measurements, information and data related to the removal process and produce a report
  • conduct site inspections, prepare advice to clients, complete clearance inspections and provide clearance certification relating to removal of ACM that complies with the requirements of relevant legislation, regulations, codes of practice and standards.

Knowledge evidence

  • the compliance requirements of the relevant Australian Standards, Building Code of Australia (BCA), model codes of practice, environmental and work health and safety (WHS) legislation
  • range of materials manufactured using asbestos, the type and characteristics of asbestos used in each material, and the usual applications associated with the material
  • legislation, regulations, codes of practise and standards
  • project plans, specifications, quality documentation and manufacturer’s instructions
  • environmental requirements and sustainability principles
  • characteristics and health impacts of exposure to ACM
  • application, methodologies and techniques of compliant removal of asbestos
  • determining factors in area in which measurements are to be taken
  • scientific techniques for measuring, testing, evaluating air monitoring results and reports
  • requirements for professional indemnity and other insurances required by legislation and to mitigate business risk
  • general construction terminology
  • risk assessment and contingency planning relating to asbestos removal
  • operational and functional features of plant, equipment and tools.

Foundation skills

  • technology skills: use mobile and communication tools and devices to communicate and collaborate effectively with others
  • technology skills: use equipment and programs to access, extract information and develop relevant documentation
  • mathematical skills: undertake complex calculations.

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing CPCCDE5001

What does an assessment tool for CPCCDE5001 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCCDE5001 needs to address all 66 unit components: 5 elements with 46 performance criteria, 4 performance evidence requirements, 13 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for CPCCDE5001?

Auditori pulls the current release of CPCCDE5001 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCCDE5001 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing CPCCDE5001 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCCDE5001, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your CPCCDE5001 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate CPCCDE5001 free