What an assessment for CPCCDE3024 must cover

57 assessable components: 6 elements (38 performance criteria), 3 performance evidence and 16 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Plan and prepare for work.

  • 1.1Interpret and apply compliance requirements to mobile plant operations.
  • 1.2Complete tasks according to manufacturer specifications and regulatory, legislative and workplace policies and requirements.
  • 1.3Obtain work instructions from required information, confirm with team members and other relevant personnel, and apply to planning and preparation.
  • 1.4Follow instructions and advice from structural engineer regarding demolition techniques on suspended floors and load bearing capacities including pre- and post-tensioning and pre-cast floors.
  • 1.5Identify and apply work health and safety (WHS) requirements to task planning according to safety plans.
  • 1.6Confirm placement of mobile plant and allowable weight of demolition debris loads on suspended floors according to advice of structural engineer.
  • 1.7Identify environmental requirements for the project.
  • 1.8Identify, select and fit personal protective equipment (PPE).
  • 1.9Check tools and equipment for serviceability, and report or rectify faults.
  • 1.10Conduct required pre-start operator maintenance tasks.
  • 1.11Conduct mobile plant pre-start, start-up, park and shutdown operational checks.
  • 1.12Check mobile plant controls and functions for serviceability and rectify and report faults.

2 Select, check and fit attachments.

  • 2.1Select mobile plant attachments to carry out tasks consistent with job requirements.
  • 2.2Check arms and connections for excessive wear and replace and report as required.
  • 2.3Fit attachments securely according to safe work method, and fit safety pins or clips.
  • 2.4Check hydraulic components rectify faults or replace components and report on action taken.
  • 2.5Test operation of hydraulic system before applying load.
  • 2.6Test attachment operation by raising and lowering attachment and check attachment is locked in position for travel.
  • 2.7Remove, maintain and store attachments.

3 Prepare demolition site.

  • 3.1Determine requirements of site demolition plan and discuss these with team members.
  • 3.2Conduct site inspection of property or dilapidation survey to determine condition of work site and surrounds before work begins and amend and see approval of safe work method statement as required.
  • 3.3Obtain confirmation from supervisor and regulatory authorities that specified services, above and below ground, have been disconnected and identifies and protects any remaining live services.
  • 3.4Identify hazardous material for separate handling.
  • 3.5Position mechanical equipment and plant in operating locations and arrange appropriate exclusion zone and traffic control.

4 Operate mobile plant for demolition process.

  • 4.1Identify and apply mobile plant general operating techniques to achieve safe, effective and efficient output while achieving specified tolerances.
  • 4.2Identify site hazards associated with mobile plant demolition operations and follow safe operating techniques to minimise risks.
  • 4.3Monitor and control placement of mobile plant and allowable weight of demolition debris loads on suspended floors throughout the demolition process.
  • 4.4Move mobile plant safely between work locations and observe codes and traffic management requirements.
  • 4.5Implement control measures to manage hazards arising from demolition process according to the demolition plan, safe work methods and regulatory requirements.
  • 4.6Assess demolition tasks immediately prior to starting and review safe work method statement (SWMS) to incorporate management of previously undiscovered hazards.
  • 4.7Operate mobile plant on suspended floors to demolish building elements or remove demolition debris using suitable attachments according to approved demolition plan, structural engineering advice, and current safe work method.
  • 4.8Maintain communication with team members during the demolition process.
  • 4.9Monitor worksite conditions and progress in consultation with team members and stop work or adjust techniques as required.

5 Carry out machine operator inspection and maintenance tasks.

  • 5.1Park and shut down mobile plant safely and remove and store attachments.
  • 5.2Inspect mobile plant for faults and remove and replace defective parts.
  • 5.3Conduct regular programmed operator maintenance tasks and complete log sheets.

6 Clean up work area.

  • 6.1Clear work area and sort materials and waste and position for removal, as required, according to site demolition project environmental management plan.
  • 6.2Clean, check, maintain and store maintenance tools and equipment.

Performance evidence

  • demolish 10 square metres of roof and wall structure
  • break up 10 square metres of concrete floor using a hydraulic hammer attachment
  • separate, sort, and load for transport a minimum of 10 cubic metres of recyclable and waste material.

Knowledge evidence

  • the compliance requirements of the relevant Australian Standards, Building Code of Australia (BCA), model codes of practice, environmental and work health and safety (WHS) legislation
  • basic principles of structural engineering relating to:
  • placement of loads on suspended floors during demolition of the same floor
  • propping requirements
  • stability of buildings and structures throughout the demolition process
  • risks associated with:
  • pre-tensioning
  • post-tensioning
  • pre-cast slabs
  • general construction terminology
  • hazards associated with the operation of mobile plant on suspended floors on residential, commercial and industrial demolition sites
  • hazards associated with inappropriate demolition methodology, including structural collapse or the premature failure of floors or other structural elements
  • methods for materials storage and disposal, including environmentally friendly waste management
  • method of operation and maintenance requirements of mobile plant and attachments
  • types, characteristics, uses and limitations of mobile plant in the demolition industry
  • workplace and equipment safety requirements.

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing CPCCDE3024

What does an assessment tool for CPCCDE3024 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCCDE3024 needs to address all 57 unit components: 6 elements with 38 performance criteria, 3 performance evidence requirements, 16 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for CPCCDE3024?

Auditori pulls the current release of CPCCDE3024 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCCDE3024 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing CPCCDE3024 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCCDE3024, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your CPCCDE3024 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate CPCCDE3024 free