UEPOPS137Shut down a steam turbine

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for UEPOPS137 must cover

43 assessable components: 5 elements (17 performance criteria), 15 performance evidence and 11 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Plan and prepare steam turbine shutdown work

  • 1.1Work health and safety (WHS)/occupational health and safety (OHS) regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, environmental requirements and workplace procedures are identified, applied and monitored
  • 1.2Work requirements are identified from relevant personnel and documentation in accordance with workplace procedures
  • 1.3Turbine shutdown schedule is identified from relevant documentation in accordance with workplace procedures
  • 1.4Pre-shutdown checks are carried out on steam turbine plant in accordance with manufacturers’ recommendations and specifications, and workplace procedures

2 Conduct steam turbine shutdown

  • 2.1Steam turbine load is reduced in accordance manufacturers’ recommendations and specifications, and workplace procedures
  • 2.2Steam turbine and generator are removed from the steam generation system in accordance with manufacturers’ recommendations and specifications, and workplace procedures
  • 2.3Steam turbine is placed on turning gear in accordance with manufacturers’ recommendations and specifications, and workplace procedures
  • 2.4Steam turbine is cooled down on turning gear in accordance with manufacturers’ recommendations and specifications, and workplace procedures

3 Test steam turbine plant operation during shutdown

  • 3.1Tests are performed in accordance with workplace procedures
  • 3.2Steam generation system and steam turbine plant is observed for operational response in accordance with workplace procedures
  • 3.3Steam turbine plant is returned to operational status upon completion of testing in accordance with workplace procedures

4 Analyse and report on system faults or status during steam turbine shutdown

  • 4.1Causes of abnormal steam turbine plant operating conditions are identified by analysing technical and operational information in accordance with workplace procedures
  • 4.2Corrective action is taken in accordance with workplace procedures
  • 4.3Steam turbine plant integrity and personnel safety is maintained through consultation with relevant personnel and technical and operational documentation in accordance with workplace procedures
  • 4.4Relevant personnel are notified when defects are detected in accordance with workplace procedures

5 Complete documentation

  • 5.1Steam turbine plant problems, movements and status are reported in accordance with workplace procedures
  • 5.2Documentation is updated in accordance with workplace procedures

Performance evidence

  • applying work health and safety (WHS)/occupational health and safety (OHS) regulations, including: emergency procedures, risk control measures, safe working practices
  • communicating with personnel
  • completing documentation using recording procedures
  • identifying steam turbine plant status
  • implementing regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, and environmental requirements
  • interpreting manuals
  • monitoring and operating steam turbine plant and equipment
  • organising resources
  • planning steam turbine plant work
  • recognising and responding to abnormal plant operating conditions
  • shutting down steam turbine plant and equipment
  • testing plant operationally
  • testing steam turbine plant operations using diagnostic and data analysis techniques and tools to determine faults
  • using steam turbine cooling techniques and procedures
  • working with permit to work system

Knowledge evidence

  • arrangements of power production plant
  • manuals
  • permit to work system
  • regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, and environmental requirements
  • shutdown procedures
  • steam turbine plant and equipment, location and operating parameters
  • steam turbine system components and interaction with other power generation plant and equipment
  • turbine operations
  • WHS/OHS requirements, including: emergency procedures, risk control measures, safe working procedures
  • workplace documentation
  • workplace policies and procedures

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing UEPOPS137

What does an assessment tool for UEPOPS137 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEPOPS137 needs to address all 43 unit components: 5 elements with 17 performance criteria, 15 performance evidence requirements, 11 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for UEPOPS137?

Auditori pulls the current release of UEPOPS137 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEPOPS137 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing UEPOPS137 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEPOPS137, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your UEPOPS137 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate UEPOPS137 free