UEPOPS071Operate and monitor a heat recovery steam generator unit

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for UEPOPS071 must cover

41 assessable components: 5 elements (18 performance criteria), 13 performance evidence and 10 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Plan and prepare work

  • 1.1Work health and safety (WHS)/occupational health and safety (OHS) regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, environmental requirements and workplace procedures are identified, applied and monitored
  • 1.2Work requirements are identified from relevant personnel and documentation in accordance with workplace procedures
  • 1.3Operational checks are carried out on HRSG plant in accordance with manufacturers’ recommendations and specifications, and workplace procedures

2 Operate HRSG plant

  • 2.1Gas turbine exhaust flow and power output are adjusted to achieve steam flow conditions in accordance with workplace procedures
  • 2.2Supplementary HRSG firing system is placed into an out-of-service to maintain design steam flow and conditions in accordance with workplace procedures
  • 2.3Monitoring and control of HRSG drum level, feedwater flow, steam temperature, pressure and flow are carried out in accordance with manufacturers’ recommendations and specifications, and workplace procedures
  • 2.4HRSG plant is operated within limits of design in accordance with workplace procedures
  • 2.5Corrective action is taken to rectify HRSG abnormalities in accordance with manufacturers’ recommendations and specifications, and workplace procedures

3 Monitor and analyse HRSG plant

  • 3.1HRSG plant to be monitored is identified in accordance with workplace procedures
  • 3.2HSRG plant is monitored for normal operation and to detect deviations from required operating conditions in accordance with workplace procedures
  • 3.3HSRG plant integrity and personnel safety is maintained in consultation with relevant personnel and technical and operational documentation in accordance with workplace procedures
  • 3.4Relevant personnel are notified when defects are detected in accordance with workplace procedures
  • 3.5Causes of abnormal HRSG plant operating conditions are identified by analysing relevant technical and operational information in accordance with workplace procedures,

4 Test HSRG plant operation

  • 4.1Operational tests are performed in accordance with workplace procedures
  • 4.2HRSG plant is observed for correct operational response in accordance with workplace procedures
  • 4.3HRSG plant is returned to required operational status upon completion of testing in accordance with workplace procedures

5 Complete documentation

  • 5.1HSRG plant problems, movements and status are reported in accordance with workplace procedures
  • 5.2Documentation is updated in accordance with workplace procedures

Performance evidence

  • analysing system faults using data analysis techniques and tools
  • applying work health and safety (WHS)/occupational health and safety (OHS) requirements, including: • emergency procedures • risk control measures • safe working practices
  • communicating with personnel
  • completing documentation using recording procedures
  • identifying heat recovery steam generator (HRSG) plant status
  • implementing regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, and environmental requirements
  • interpreting manuals
  • operating and monitoring HRSG plant and equipment
  • organising resources
  • preparing HRSG plant and equipment for operation
  • recognising and responding to abnormal HRSG plant operating conditions
  • testing plant operation using diagnostic and testing techniques
  • working with permit to work system

Knowledge evidence

  • arrangements of power production plant
  • HRSG plant and equipment, location and operating parameters
  • manuals
  • operation of HRSG plant and equipment
  • operational testing of HRSG plant, including HRSG efficiency
  • permit to work system
  • regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, and environmental requirements
  • WHS/OHS requirements, including: • emergency procedures • risk control measures • safe working practices
  • workplace documentation
  • workplace policies and procedures

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing UEPOPS071

What does an assessment tool for UEPOPS071 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEPOPS071 needs to address all 41 unit components: 5 elements with 18 performance criteria, 13 performance evidence requirements, 10 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for UEPOPS071?

Auditori pulls the current release of UEPOPS071 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEPOPS071 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing UEPOPS071 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEPOPS071, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your UEPOPS071 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate UEPOPS071 free