UEEEC0058 — Repair predictable faults in television receivers
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for UEEEC0058 must cover
44 assessable components: 3 elements (20 performance criteria), 13 performance evidence and 11 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Prepare to repair televisions
- 1.1Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for relevant work area are identified, obtained and applied
- 1.2Risk control measures are applied in accordance with workplace procedures prior to commencing work
- 1.3Nature of the fault is obtained from documentation or from relevant person/s to determine scope of work
- 1.4Instructions for coordinating work with others are obtained from relevant person/s and applied
- 1.5Materials required for the work are determined in accordance with workplace procedures
- 1.6Tools, equipment and testing devices required for work are obtained in accordance with workplace procedures and checked for correct operation and safety
2 Find and repair faults
- 2.1Workplace risk control measures and workplace procedures are applied
- 2.2Need to test and measure live work is determined in accordance with WHS/OHS requirements and workplace procedures
- 2.3Apparatus is checked and isolated as required in accordance with WHS/OHS requirements and workplace procedures
- 2.4Fault finding is undertaken methodically applying principles of televisions and circuits using measured and calculated values of apparatus parameters in accordance with manufacturer instructions and workplace procedures
- 2.5Apparatus components are dismantled, where necessary, and parts stored to protect against loss or damage
- 2.6Faulty components are rechecked and their fault status confirmed
- 2.7Repairs are undertaken in accordance with manufacturer instructions and relevant person/s instructions
- 2.8Apparatus is reassembled and tested for safety and functionality in preparation for return to the customer
- 2.9Unplanned situations are dealt with safely and with the approval of relevant person/s
- 2.10Repairs are conducted efficiently without waste of materials, damage to apparatus, the surrounding environment or services applying sustainable energy practices
3 Complete and report repair activities
- 3.1WHS/OHS work completion risk control measures and workplace procedures are followed
- 3.2Work area is cleaned and made safe in accordance with workplace procedures
- 3.3Justification is provided for repairs to apparatus in the required format
- 3.4Work completion reporting is completed and relevant person/s notified in accordance with workplace procedures
Performance evidence
- applying methodical fault-finding techniques
- applying relevant risk identification, assessment, reporting and control requirements
- applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements, including using risk control measures
- applying sustainable energy principles and practices
- coordinating work with relevant person/s
- dealing effectively with unplanned events
- determining live testing/measurement requirements
- determining scope of repair work
- efficiently finding faults
- identifying and accessing materials, tools, apparatus and testing devices
- isolating circuits/machines/systems
- providing justification for the repairs
- replacing components without damage
Knowledge evidence
- relevant industry standards, codes and regulations
- relevant manufacturer specifications
- relevant safe work method statements (SWMS)/job safety assessments or risk mitigation processes
- relevant WHS/OHS legislated requirements
- relevant workplace documentation
- relevant workplace policies and procedures
- technical manuals and catalogues
- television chrominance and luminance
- television fundamentals
- television receiver repair basics
- television scanning and deflection
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing UEEEC0058
What does an assessment tool for UEEEC0058 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEEEC0058 needs to address all 44 unit components: 3 elements with 20 performance criteria, 13 performance evidence requirements, 11 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for UEEEC0058?
Auditori pulls the current release of UEEEC0058 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEEEC0058 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing UEEEC0058 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEEEC0058, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- UEEEC0001 — Analyse the performance of wireless-based electronic communication systems
- UEEEC0002 — Assemble and install reception antennae and signal distribution equipment
- UEEEC0003 — Assemble and set up basic security systems
- UEEEC0004 — Assemble and set up fixed video/audio components and systems in buildings and premises
- UEEEC0005 — Assess electronic apparatus compliance
- UEEEC0006 — Carry out repairs of predictable faults in video and audio replay/recording apparatus
- UEEEC0007 — Commission electronics and communications systems
- UEEEC0008 — Commission large fire protection systems
- UEEEC0009 — Commission satellite and microwave communication systems
- UEEEC0010 — Design and develop advanced digital systems
- UEEEC0011 — Design and develop electronics/computer systems projects
- UEEEC0012 — Design custom electronic equipment installations
Your UEEEC0058 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate UEEEC0058 free