RIIOGD405E — Carry out well control and blow out prevention operations
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for RIIOGD405E must cover
33 assessable components: 4 elements (23 performance criteria), 4 performance evidence and 4 knowledge evidence requirements, plus 2 foundation skills. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Plan and prepare to carry out well control and blow out prevention (BOP)
- 1.1Obtain, interpret and confirm work requirements
- 1.2Access, interpret and apply well control and BOP documentation and confirm the work activity is compliant
- 1.3Identify and minimise environmental issues and potential hazards, and assess and address risks within scope of own role and according to workplace procedures
- 1.4Select and wear personal protective equipment required for work activities
- 1.5Calculate kill mud weight, pressure losses, drill stem and annular volumes, maximum allowable annular surface pressure (MAASP) and initial and final circulating pressures
- 1.6Identify, interpret and respond to early warning signs of kicks and well going under-balance while drilling
- 1.7Recognise kick indicators and apply kick detection methods and responses
2 Assess well control equipment and report and record faults
- 2.1Identify the purpose, use of and relationship between equipment, indicators, counters and detection systems to determine fitness of equipment for well control
- 2.2Identify flow paths for normal drilling operations and well control
- 2.3Identify and apply well-control testing procedures and principles
- 2.4Demonstrate primary equipment failure well shut-in procedures
3 Carry out well kill operations
- 3.1Brief crew on well control procedures
- 3.2Access and apply pre-recorded information
- 3.3Identify, read, interpret and record pressures and gauge information and undertake corrective action as required
- 3.4Determine and apply well kill procedures according to work requirements and workplace procedures
- 3.5Apply trip kill sheet data and well-closure procedure when dealing with influx and shutting in a well
- 3.6Calculate hydrostatic head at specific depths and apply required procedures when observing loss of circulation
- 3.7Identify, interpret and apply required tripping methods and tests
- 3.8Identify, interpret and apply stripping methods
- 3.9Identify, interpret and apply recording and reporting procedures according to workplace procedures
- 3.10Manage and communicate with crew during a well control emergency
4 Conduct housekeeping activities
- 4.1Clean, check, perform maintenance on and store plant, tools and equipment
- 4.2Report issues identified with plant, tools and equipment
Performance evidence
- carry out well control and blow out prevention (BOP) operations on at least two occasions, including: taking measurements, including: penetration rate, circulating and pump pressure, rotary torque, hook load, active surface volume, frequency; making calculations and estimations, including: pressure, density, volume, height (influx height), velocity, length (influx length), weight, total depth (TD), total vertical depth (TVD); interpreting gauges and graphs; detecting kick warning signs and indicators; completing trip and kill sheet records; monitoring drilling operations.
- locate and apply documentation, policies and procedures required for carrying out well control and BOP operations
- implement the requirements, procedures and techniques for carrying out well control and BOP, including: identifying, addressing and reporting potential hazards and risks; identifying, addressing and reporting environmental issues; preparing written records and reports; rectifying any identified faults and malfunctions within scope of own role and escalating where required
- direct others to carry out well control and BOP that meets required outcomes, including: resolving coordination requirements with others at the site prior to commencing and during work activities; preparing for and organising work activities to meet all task requirements; using a range of communication techniques and aids to advise others of work activity and exclusion zones.
Knowledge evidence
- key legislation required for carrying out well control and BOP operations
- key policies, procedures and established requirements for carrying out well control and BOP operations, including those for: setting up work activity; site isolation, signage and erecting barriers; work health and safety; environmental issues; selecting and checking plant, tools and equipment required to carry out tasks for faults; carrying out work to specifications; communication techniques relevant to work activities; using well control and auxiliary equipment; delegating roles and responsibilities of assistants; maintaining equipment; taking measurements, including: penetration rate, circulating and pump pressure, rotary torque, hook load, active surface volume, frequency; shut in casing pressure; shut in drill pipe pressure; making calculations, including: pressure, density, volume, height, velocity, length, weight, total depth (TD), total vertical depth (TVD); responding to emergency situations; controlling identified hazards; housekeeping
- technical solutions for well control and BOP
- kick detection methods and responses.
Foundation skills
- Reading: Identifies and interprets complex information from workplace procedures, documentation, legislation and regulations
- Oral communication: Presents workplace procedures and technical instructions to others using sector-specific vocabulary
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing RIIOGD405E
What does an assessment tool for RIIOGD405E need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for RIIOGD405E needs to address all 33 unit components: 4 elements with 23 performance criteria, 4 performance evidence requirements, 4 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for RIIOGD405E?
Auditori pulls the current release of RIIOGD405E from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for RIIOGD405E — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing RIIOGD405E assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of RIIOGD405E, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- RIIOGD202E — Carry out equipment and basic rig maintenance procedures
- RIIOGD203F — Prepare and operate drilling fluid systems
- RIIOGD204F — Perform rig floor operations
- RIIOGD205E — Support blow out prevention operations
- RIIOGD206E — Assist and monitor well control operations
- RIIOGD209F — Operate and maintain ancillary equipment
- RIIOGD301E — Conduct and maintain derrick operations
- RIIOGD302F — Assist in running casing
- RIIOGD303F — Trip pipe
- RIIOGD304D — Apply effective coal seam gas control practices
- RIIOGD305E — Apply blow out prevention operational procedures
- RIIOGD401E — Rig up, conduct pre-spud operations and rig down
Your RIIOGD405E assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate RIIOGD405E free