RIICWD539Prepare traffic management plans and traffic guidance schemes for motorways and freeways

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for RIICWD539 must cover

117 assessable components: 5 elements (24 performance criteria), 44 performance evidence and 47 knowledge evidence requirements, plus 2 foundation skills. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Establish context for traffic management plan

  • 1.1Determine worksite requirements and document context of traffic management plan, including scope, client objectives and key stakeholders
  • 1.2Identify characteristics, constraints and hazards that apply to the worksite, including capacity and traffic volume
  • 1.3Complete risk assessment of proposed worksite and work activities
  • 1.4Establish and document the scope and objectives of traffic management plan
  • 1.5Establish and confirm safety and accessibility of all road users affected by proposed worksite and works

2 Prepare and complete traffic management plan

  • 2.1Monitor and coordinate the progress of personnel involved in the preparation process
  • 2.2Document traffic management plan communications strategy for internal and external audiences
  • 2.3Prepare resource requirements for executing traffic management plan as required
  • 2.4Assemble traffic management plan
  • 2.5Prepare communication for traffic management control centre
  • 2.6Document sequencing and staging of traffic management controls
  • 2.7Gain plan approval from required authorities

3 Select, modify or design traffic guidance scheme

  • 3.1Determine whether to select, modify or develop required traffic guidance scheme or schemes according to job requirements
  • 3.2Determine personnel requirements, roles and responsibilities according to job requirements
  • 3.3Determine traffic control arrangements according to job requirements
  • 3.4Develop speed management and enforcement plan as required
  • 3.5Determine traffic guidance scheme modification triggers for emergencies and uncontrolled events
  • 3.6Determine inspection, monitoring, reporting and quality control measures for on-site traffic control

4 Finalise traffic management plan preparation process

  • 4.1Deliver final traffic management plan to stakeholder
  • 4.2Establish and maintain record and version control according to workplace procedures

5 Support and review traffic management plan implementation

  • 5.1Provide clarification and advice to personnel implementing traffic management plan as required
  • 5.2Review traffic management plan implementation and recommend changes as required to meet job requirements
  • 5.3Contribute to traffic management plan validation process as required to meet job requirements
  • 5.4Participate in performance review of preparation process

Performance evidence

  • prepare traffic management plans and traffic guidance schemes for motorways and freeways on at least two occasions, including:
  • identifying and assessing hazards, risks and constraints in the work zone
  • determining traffic control arrangements for:
  • required detours or bypasses
  • traffic paths, lane arrangements and dimensions
  • channelization or delineation arrangements, including tapers
  • access arrangements for worksite traffic
  • key road users, including:
  • public transport
  • police and emergency services
  • over dimension vehicles
  • signage requirements, including type, size and placement
  • protecting traffic control workers during installation, operation and removal of traffic guidance scheme
  • unattended worksites
  • required traffic control illumination
  • escape routes
  • truck mounted attenuators
  • deployment vehicles
  • deployment of traffic management for road workers and road users
  • safety barriers
  • lane use management systems
  • closing an on-ramp or off-ramp
  • rolling blockades
  • night works
  • advance warning through the use of VMS
  • mobile works
  • emergency vehicles
  • special requirements for using traffic controllers
  • interpreting and analysing data
  • calculating flow rates, level of service, capacities and percentages
  • determining traffic management plan capacity requirements
  • documenting scope and authorities to modify the plan during implementation
  • reviewing and confirming required approvals and permits.
  • locate and apply required legislation, documentation, policies and procedures
  • access and interpret required:
  • plans, drawings, specifications and traffic management plan briefs
  • engineering survey information
  • traffic analysis data
  • select and apply required traffic management plan implementation techniques
  • apply engineering graphical presentation techniques
  • work with required personnel to undertake and complete the work zone traffic management plan including:
  • complying with written and verbal reporting requirements and procedures
  • communicating with others to receive and clarify work instructions and coordinate work activities
  • consulting with stakeholders.

Knowledge evidence

  • legislation required to prepare traffic management plans and traffic guidance schemes for motorways and freeways
  • policies, procedures and documentation required to prepare traffic management plans and traffic guidance schemes for motorways and freeways, including:
  • Austroads Guide to Temporary Traffic Management
  • temporary traffic management
  • risk assessment and management
  • statutory compliance
  • work health and safety
  • traffic management plans
  • environmental management
  • cultural and heritage management
  • quality management
  • plan approvals and reviews
  • performance reviews
  • task specific documentation, including plans, drawings, specifications and traffic management plan briefs
  • workplace recording and reporting
  • principles of road user behaviour, including on:
  • freeways and motorways
  • grade separated roads with speed limits greater than or equal to 90km/h and traffic volumes generally greater than 20,000 vehicles per day (Average Annual Daily Traffic (AADT))
  • principles of traffic management plans and traffic guidance schemes, including:
  • design options, including for:
  • motorways and freeways
  • multiple lane closures
  • on-ramps and off-ramps
  • rolling blockades
  • techniques for evaluating and selecting preferred options
  • signs, devices and equipment types,
  • characteristics, technical capabilities and limitations
  • geometrics
  • potential traffic hazards, constraints and conditions
  • techniques to address conflicts between different road user groups
  • factors that determine the time at which works can be undertaken
  • techniques for implementing traffic management plans and traffic guidance schemes, including:
  • operational techniques
  • sophisticated public communications strategies
  • industry and workplace design
  • implementation structures and capabilities
  • team leadership techniques
  • problem solving techniques
  • cost estimation techniques
  • engineering graphical presentation techniques
  • accessing and interpreting site specific data, including:
  • engineering survey information
  • hydrological, meteorological, cultural and heritage data
  • complex temporary traffic management equipment types, including:
  • truck mounted attenuators
  • electronic signs
  • barriers.

Foundation skills

  • Numeracy: Applies basic mathematics including addition and multiplication to calculate resourcing requirements, flow rates and levels of service
  • Oral communication: Presents information and provides assistance using sector-specific vocabulary. Uses listening and questioning to clarify and confirm understanding

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing RIICWD539

What does an assessment tool for RIICWD539 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for RIICWD539 needs to address all 117 unit components: 5 elements with 24 performance criteria, 44 performance evidence requirements, 47 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for RIICWD539?

Auditori pulls the current release of RIICWD539 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for RIICWD539 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing RIICWD539 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of RIICWD539, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your RIICWD539 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate RIICWD539 free