RIICTT310E — Renovate large diameter pipes and chambers
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for RIICTT310E must cover
42 assessable components: 5 elements (27 performance criteria), 6 performance evidence and 7 knowledge evidence requirements, plus 2 foundation skills. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Prepare to renovate large diameter pipes and chambers
- 1.1Obtain, interpret, and confirm work requirements
- 1.2Access, interpret and apply documentation and procedures to renovate large diameter pipes and chambers and confirm the work activity is compliant
- 1.3Identify environmental issues and potential hazards, and assess and address risks within scope of own role and according to workplace procedures
- 1.4Select and wear personal protective equipment required for work activities
- 1.5Complete induction procedures as required by workplace policies and procedures and job role requirements
- 1.6Obtain and confirm safety requirements from the site safety plan
- 1.7Identify, obtain and implement signage requirements from the project traffic management plan
- 1.8Identify and select plant, tools and equipment, check for serviceability and rectify and report any faults as required
- 1.9Identify and confirm environmental protection requirements from the project environmental management plan
2 Perform site survey
- 2.1Notify and obtain approval from property owners and occupiers for entry onto their property
- 2.2Determine site conditions through visual inspection, plans, discussion with land owners and information from service utilities
- 2.3Locate underground utilities according to job and workplace requirements
- 2.4Record existing site conditions according to job and workplace requirements
3 Initiate rehabilitation work
- 3.1Prepare entry and exit pits where specified
- 3.2Identify, interpret and apply required confined space entry procedures
- 3.3Monitor process and confirm conformity to design requirements
- 3.4Maintain system serviceability during rehabilitation works
4 Undertake renovation of large diameter pipes and chambers
- 4.1Determine fault by physical inspection
- 4.2Select renovation method required for fault
- 4.3Piece together and patch fractured and ruptured sections as required
- 4.4Complete renovation according to work requirements
- 4.5Conduct curing process according to work requirements
- 4.6Secure and seal termination at ends of process
- 4.7Open junctions for inspection and operation
- 4.8Monitor installation process and confirm finished product conforms to design requirements
5 Clean up
- 5.1Clear work area and dispose of, reuse and recycle materials as required
- 5.2Clean, check, perform maintenance on and store plant, tools and equipment and report issues as required or address within scope of own role
Performance evidence
- renovate large diameter pipes and chambers on at least two occasions including at least two different renovations of large diameter pipes and chambers.
- locate, apply and retain on site access to documentation, policies and procedures required for renovating large diameter pipes and chambers
- implement the requirements, procedures and techniques for renovating large diameter pipes and chambers, including: determining site conditions and locating underground utilities, determining pipeline faults and required repair and sealing method
- complete housekeeping activities
- work with others to renovate large diameter pipes and chambers that meets all required outcomes, including: using a range of communication techniques and equipment to convey information to others, maintaining written and verbal reporting requirements and procedures, organising work activities to meet all task requirements
- identify, obtain, confirm and apply work, safety and signage instructions and requirements.
Knowledge evidence
- engineering drawings, plans and specifications required for renovating large diameter pipes and chambers
- civil construction terminology relevant for renovating large diameter pipes and chambers
- safety data sheets and materials handling methods
- principles for pipeline systems relevant to trenchless technology
- key risks relating renovating large diameter pipes and chambers, including those associated with: traffic, live electrical services, confined spaces, falls, locating near other works in progress, manual handling, gas
- key policies and procedures, legislation and established requirements for renovating large diameter pipes and chambers, including those for: workplace health and safety, equipment safety, project environmental management, site condition assessments, operating and maintaining equipment, site isolation and traffic control, waste disposal and recycling, confined space entry, locating underground utilities
- key factors affecting work activities described in performance evidence above, including: fault types, renovation methods, equipment types, characteristics, technical capabilities and limitations, laser control equipment techniques, curing process, working in a road reserve, manual handling techniques.
Foundation skills
- Reading: Identifies and interprets information from at times complex workplace procedures, documentation, legislation and regulations
- Writing: Records simple and routine information relating to work activities
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing RIICTT310E
What does an assessment tool for RIICTT310E need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for RIICTT310E needs to address all 42 unit components: 5 elements with 27 performance criteria, 6 performance evidence requirements, 7 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for RIICTT310E?
Auditori pulls the current release of RIICTT310E from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for RIICTT310E — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing RIICTT310E assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of RIICTT310E, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- RIICTT301E — Conduct fluid assisted directional boring
- RIICTT302E — Conduct impact moling, ramming and augering operations
- RIICTT303E — Control micro tunnelling and pipe-jacking operations
- RIICTT304E — Undertake on-line replacement for existing pipeline systems
- RIICTT305E — Undertake localised repair and sealing of existing pipeline systems
- RIICTT306E — Install cure in-place linings for existing pipeline systems
- RIICTT307E — Spray linings for existing pipeline systems
- RIICTT308E — Install close-fit linings for existing pipeline systems
- RIICTT309E — Install slip lining in existing pipeline systems
- RIICTT401E — Supervise the installation of underground services using trenchless technology
- RIICTT402E — Supervise repair and rehabilitation of underground services using trenchless technology
Your RIICTT310E assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate RIICTT310E free