PMAOPS233 — Monitor wells and gathering systems
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for PMAOPS233 must cover
48 assessable components: 6 elements (26 performance criteria), 5 performance evidence and 17 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Prepare for work
- 1.1Receive and give shift handover
- 1.2Identify work requirements
- 1.3Identify and control hazards
- 1.4Coordinate with appropriate personnel
- 1.5Check for recent work undertaken on wells/gathering systems
- 1.6Note any outstanding/incomplete work
- 1.7Check operational status of wells/gathering systems
- 1.8Determine appropriate route/schedule for day's work
2 Complete site equipment checks
- 2.1Check equipment condition and operation
- 2.2Check required levels
- 2.3Top up levels as required
- 2.4Complete logs and reports as required
3 Use well control systems as required
- 3.1Check well control systems validity
- 3.2Perform other required well control system tasks
- 3.3Complete logs and reports as required
4 Take required readings
- 4.1Complete all required readings for site
- 4.2Compare all read values with the desired range
- 4.3Compare read values with previous log sheet values
- 4.4Complete logs and reports as required
5 Complete required lease maintenance
- 5.1Inspect lease area for items requiring action
- 5.2Complete required lease maintenance actions
- 5.3Complete logs and reports as required
6 Finalise shift activities
- 6.1Complete shift tasks as appropriate
- 6.2Ensure identified faults are correctly logged/reported for action
- 6.3Ensure incomplete tasks are scheduled for follow-up
- 6.4Ensure all logs and reports are complete and understood
Performance evidence
- undertake checks, inspections and readings according to procedures
- recognise early warning signs of equipment/processes needing attention or with potential problems
- convey information relevant to the operation clearly and effectively
- identify hazards and apply hazard control procedures
- complete workplace forms.
Knowledge evidence
- geology relevant to the wells (e.g. coal seam gas (CSG) formation, structure and completions, and coal type and structure)
- well design and construction
- physics and chemistry relevant to the unit and the processes used
- hydrate formation
- free flow and pumped wells
- pumping principles
- gas flow principles
- gas/water separation principles
- draining and venting requirements
- routine problems, faults and typical causes
- process parameters and limits (e.g. temperature, pressure and flow)
- static electricity and earthing
- relevant environmental and heritage requirements
- protective systems
- remote terminal unit, functions, operation and problems
- hierarchy of control
- hazards that may arise in the job/work environment, and: - their possible causes - potential consequences - appropriate risk controls.
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing PMAOPS233
What does an assessment tool for PMAOPS233 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for PMAOPS233 needs to address all 48 unit components: 6 elements with 26 performance criteria, 5 performance evidence requirements, 17 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for PMAOPS233?
Auditori pulls the current release of PMAOPS233 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for PMAOPS233 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing PMAOPS233 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of PMAOPS233, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- PMAOPS101 — Read dials and indicators
- PMAOPS105 — Select and prepare materials
- PMAOPS201 — Operate fluid flow equipment
- PMAOPS202 — Operate fluid mixing equipment
- PMAOPS204 — Select and use utilities and services
- PMAOPS205 — Operate heat exchangers
- PMAOPS208 — Operate chemical separation equipment
- PMAOPS210 — Operate solids handling equipment
- PMAOPS213 — Package product/material
- PMAOPS216 — Operate local control system
- PMAOPS217 — Operate wet milling equipment
- PMAOPS220 — Monitor chemical reactions in the process
Your PMAOPS233 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate PMAOPS233 free