ICTNWK624Configure advanced internetwork routing solutions

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for ICTNWK624 must cover

51 assessable components: 3 elements (16 performance criteria), 4 performance evidence and 26 knowledge evidence requirements, plus 5 foundation skills. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Develop IP routing solutions

  • 1.1Confirm work brief and tasks according to organisational policies and procedures
  • 1.2Analyse and select appropriate advanced IPv4 and IPv6 routing protocols according to work brief
  • 1.3Select and source configuration hardware, software and tools
  • 1.4Confirm component serviceability
  • 1.5Create routing solution implementation and verification plan
  • 1.6Configure and test routing solution according to plan
  • 1.7Rectify any routing issues

2 Create IPv6-based network

  • 2.1Determine IPv6-based network requirements
  • 2.2Create implementation and verification plan for IP-based network solution in consultation with required personnel
  • 2.3Perform IPv6 interoperation with IPv4-based network
  • 2.4Verify and test IPv6-based network solution and rectify any issues

3 Confirm network redistribution

  • 3.1Complete network redistribution analysis
  • 3.2Create IPv6 redistribution plan according to analysis findings
  • 3.3Conduct and verify IPv6-based network redistribution
  • 3.4Test redistribution solution and rectify any issues
  • 3.5Develop and securely file documentation on completed work tasks according to organisational policies and procedures

Performance evidence

  • configure at least one internet protocol version 4 (IPv4) routing solution in which the work must include one of the following: distance vector routing protocol solution; link-state routing protocol solution
  • configure at least one internet protocol version 6 (IPv6) routing solution
  • produce and securely file documentation of work tasks performed
  • apply required organisational policies and procedures

Knowledge evidence

  • key types of IPv4 and IPv6 routing protocols and solutions, including:
  • distance vector routing solutions
  • link-state routing protocol solutions
  • hybrid routing solutions
  • functions and features relevant to configuring advanced internetwork routing solutions, including:
  • broadband technologies
  • routing tables
  • external factors that impact network design
  • business component implementation
  • implementation and verification plans
  • virtual private networks (VPN)
  • IPv6-based networks
  • IPv4-based networks
  • IPv4 and IPv6 redistribution and interoperation processes
  • local area networks (LANs)
  • wide area networks (WANs)
  • routing solutions
  • configuration procedures for IPv6-based networks
  • methods and technical guidelines required to configure network components
  • network testing tools and operations for complex networks
  • risk management strategies and practices for complex networks, including:
  • protocols and operational processes
  • operating security technologies
  • formal and structured approaches to network management
  • organisational formats for documentation
  • organisational policies and procedures and legislative requirements relating to work tasks

Foundation skills

  • Reading: Interprets complex technical information to confirm requirements
  • Writing: Prepares workplace documentation that includes all completed work tasks in a format appropriate to organisational requirements
  • Planning and organising: Uses a combination of formal planning processes to identify threats and risks
  • Problem solving: Uses nuanced knowledge of context to solve problems in complex and dynamic environments
  • Technology: Interprets the strategic and operational potential of digital trends to achieve work goals, enhance work processes, create opportunities and enhance or reduce risks

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing ICTNWK624

What does an assessment tool for ICTNWK624 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for ICTNWK624 needs to address all 51 unit components: 3 elements with 16 performance criteria, 4 performance evidence requirements, 26 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for ICTNWK624?

Auditori pulls the current release of ICTNWK624 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for ICTNWK624 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing ICTNWK624 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of ICTNWK624, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your ICTNWK624 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate ICTNWK624 free