What an assessment for ICTCBL313 must cover
40 assessable components: 3 elements (18 performance criteria), 6 performance evidence and 9 knowledge evidence requirements, plus 7 foundation skills. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Prepare for cable modification and cutover
- 1.1Obtain relevant legislation, codes, regulations and standards for given work
- 1.2Scope work by obtaining project plan from appropriate personnel and arrange for site access to comply with security arrangements
- 1.3Notify appropriate personnel of identified safety hazards at worksite
- 1.4Determine cable route and type of cable from project plan, and identify and avoid other services
- 1.5Obtain plant, tools and safety equipment and material to perform tasks safely and efficiently
- 1.6Prepare implementation plan with cutover tasks based on identified nature of job and seek client approval
- 1.7Notify client and network carrier of proposed cutover details and proposed disruption to services
- 1.8Undertake additional preparatory non-jointing work, as required, according to enterprise guidelines and site conditions
- 1.9Select labour support required according to cutover tasks and available skills
- 1.10Select technical equipment for cutover to suit materials being used, cable type and joint enclosure
2 Joint and cutover cable
- 2.1Follow work health and safety (WHS) and environmental requirements for given work
- 2.2Joint cable according to sequencing plan, materials, joint type, location, and enterprise and manufacturer’s guidelines
- 2.3Test cable for performance and rectify any faults relating to cutover according to location, materials available and industry practice
- 2.4Seal all joints according to cable type, location, and enterprise and manufacturer’s guidelines
3 Complete project documentation
- 3.1Record test results for future reference, complete reports on cutover installation and design amendments to reflect existing cable layout according to enterprise requirements
- 3.2Recover obsolete materials and return to appropriate point for disposal
- 3.3Restore site according to requirements of enterprise or approving authority and to client satisfaction
- 3.4Notify appropriate personnel completion of cutover and obtain sign off
Performance evidence
- prepare for cutover
- rearrange cable
- conduct tests to determine success of cutover
- interpret results and rectify faults occurring as a result of cutover
- apply regulations and standards related to the cable rearrangement
- comply with all related health and safety requirements, work practices and service level agreements
Knowledge evidence
- cabling types, connectors and cabling structures
- legislation, codes of practice and other formal agreements that impact on the work activity
- manufacturer’s requirements for safe operation of equipment
- cutover of cable on the client’s equipment
- health and safety requirements relating to the activity and site conditions
- test methods and performance requirements
- features and operating requirements of test equipment
- typical issues and challenges that occur on the worksite
- purpose of warranties and service level agreements (SLA)
Foundation skills
- Reading: Analyses and consolidates test results and data from a range of sources, against defined criteria and requirements Reads and interprets plans, specifications and other documentation from a variety of sources and consolidates information to determine requirements
- Writing: Documents outcomes and changes to plans using industry relevant terminology and recognised plan symbols Prepares documentation and correspondence using clear language and correct spelling and terminology
- Oral Communication: Interacts effectively in verbal exchanges using active listening, questioning and reading of verbal and non-verbal signals to convey and clarify information
- Numeracy: Make calculations appropriate for measuring and estimating materials for construction Performs mathematical calculations to check, interpret and confirm results of system tests
- Navigate the world of work: Takes personal responsibility for following explicit and implicit policies, procedures and legislative requirements Identifies and acts on issues that contravene relevant policies, procedures and legal requirements
- Interact with others: Uses a range of strategies to establish a sense of connection and build rapport with clients and co-workers
- Get the work done: Takes responsibility for planning, sequencing and prioritising tasks and own workload for efficiency and effective outcomes Addresses less predictable problems and initiates standard procedures in response, applying problem solving processes in determining a solution
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing ICTCBL313
What does an assessment tool for ICTCBL313 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for ICTCBL313 needs to address all 40 unit components: 3 elements with 18 performance criteria, 6 performance evidence requirements, 9 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for ICTCBL313?
Auditori pulls the current release of ICTCBL313 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for ICTCBL313 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing ICTCBL313 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of ICTCBL313, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- ICTCBL205 — Joint metallic conductor cable on customer premises
- ICTCBL206 — Alter services to existing cable system
- ICTCBL210 — Install a telecommunications service to a building
- ICTCBL211 — Install an above ground equipment enclosure
- ICTCBL212 — Erect aerial cable supports
- ICTCBL219 — Apply safe technical work practices for cabling registration when configuring an ADSL circuit
- ICTCBL238 — Install, maintain and modify customer premises communications cabling: ACMA Lift Rule
- ICTCBL239 — Install customer cable support systems
- ICTCBL240 — Place and secure customer cable
- ICTCBL241 — Terminate metallic conductor customer cable
- ICTCBL242 — Install functional and protective telecommunications earthing system
- ICTCBL246 — Install, maintain and modify customer premises communications cabling: ACMA Restricted Rule
Your ICTCBL313 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate ICTCBL313 free