CPCPRF2022 — Select and install roof sheeting and wall cladding
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for CPCPRF2022 must cover
65 assessable components: 6 elements (24 performance criteria), 7 performance evidence and 34 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Identify installation requirements.
- 1.1Access, read and determine roof sheeting and wall cladding installation requirements from job specifications, relevant Australian Standards, codes, manufacturer’s instructions and jurisdictional requirements.
- 1.2Identify and apply workplace policies and procedures, work health and safety (WHS) and environmental requirements.
- 1.3Identify whether materials to be used are compatible with the surrounding environment and other materials within the installation.
- 1.4Determine material types and calculate quantities from plans and specifications.
- 1.5Identify roof insulation and wall cladding to meet thermal, acoustic, moisture and bushfire control requirements.
- 1.6Identify safety mesh requirements to support the installation requirements.
2 Receive delivery of materials.
- 2.1Provide safe access for delivery vehicles and on-site workers.
- 2.2Ensure the point of delivery can support the load and assist in the unloading and transfer of materials.
- 2.3Check conformity of materials against the delivery docket and specifications and report any shortfalls or damage.
- 2.4Secure materials and protect from moisture and mechanical damage.
3 Prepare for work.
- 3.1Identify and check condition of plant, equipment and tools required for the installation.
- 3.2Select, fit and use appropriate personal protective equipment (PPE).
- 3.3Check fall protection system is in place and secure.
4 Install roof sheeting.
- 4.1Perform installation and fix selected insulation ensuring acoustic, thermal, moisture and bushfire control.
- 4.2Measure, cut and fix roof battens for the installation at correct spacings to match plans, in accordance with jurisdictional legislation.
- 4.3Measure, cut, weather and install roof sheets using appropriate fastening spacings and methods.
- 4.4Remove swarf end of installation.
5 Install wall cladding.
- 5.1Perform installation and fix selected insulation ensuring acoustic, thermal, moisture and fire control.
- 5.2Measure, cut and fasten battens at correct spacings to match plans, in accordance with jurisdictional legislation.
- 5.3Measure, cut and install wall cladding and flashings using appropriate fastening spacing and methods.
- 5.4Install thermal breaks as required.
6 Clean up.
- 6.1Remove swarf off cladding, flashings and gutter and clear any rivet stems and fasteners.
- 6.2Clear the work area and dispose of, reuse or recycle materials in accordance with state or territory legislation and workplace requirements.
- 6.3Clean tools and equipment, check for serviceability and report any damage, and store and secure.
Performance evidence
- installing steel claddings to structures not less than 2 metres wide and 1.5 metres long including:
- a flat deck roof system to a pitch ≥ 1° using concealed fixing method and installing safety wire mesh, blanket and foil
- a pitched roof system ≥ 5° using an approved pierced fixing method and incorporating: a valley, hip, ridge and barge; thermal insulation containing a blanket and foil for fire management
- a non-structural cladded roof over rigid support using concealed fixing method including valley, hip, ridge, barge and roof discharge detail and moisture control pliable membrane
- a sandwich panel roof or wall over supports using pierced fixing method with a minimum of two panels
- a non-metallic roof sheet using pierced fixing and installing safety wire mesh
- wall cladding incorporating side lapping with one external and internal corner and toe mould and including: an opening of 300 x 600 mm; pliable building membrane.
Knowledge evidence
- reading and interpreting plans, including electronic plans
- current standards and codes for roof sheeting and insulation:
- HB39 Installation Code for metal roof and wall cladding
- National Construction Code (NCC)
- AS 1562 Design and installation of sheet roof and wall cladding
- AS 4200.2 Pliable building membranes and underlays - Installation
- AS 3999 Bulk thermal insulation - Installation
- calculation of material quantities
- receival, storage, protection and checking quantities for delivery of roofing materials
- roof components:
- insulation to meet thermal acoustic, moisture and fire control
- safety mesh
- rigid supports
- roof and safety battens
- fixings and fasteners
- metal and non-metallic roofing sheets
- sandwich panel
- thermal breaks and approved sealants
- capillary action and thermal expansion
- corrosion control
- weathering
- unloading and storage of roof materials following manufacturers’ instructions:
- stacking dunnage
- environmental protection
- conformity of materials against the delivery docket
- work health and safety (WHS) requirements:
- working at heights
- fragile materials
- asbestos containing materials
- selecting and installing roof sheeting and wall cladding
- overhead hazards
- installation in bushfire prone areas and requirements of The National Association of Steel-Framed Housing (NASH) Standard for construction in bushfire areas or AS 3959 Construction of buildings in bushfire-prone areas
- how to access relevant information, including codes and standards
- tools, materials and equipment used to select and install roof sheeting and wall cladding.
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing CPCPRF2022
What does an assessment tool for CPCPRF2022 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCPRF2022 needs to address all 65 unit components: 6 elements with 24 performance criteria, 7 performance evidence requirements, 34 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for CPCPRF2022?
Auditori pulls the current release of CPCPRF2022 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCPRF2022 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing CPCPRF2022 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCPRF2022, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- CPCPRF2023 — Collect and store roof water
- CPCPRF2024 — Fabricate roof coverings for curved structures
- CPCPRF3021 — Receive roofing materials
- CPCPRF3022 — Fabricate and install roof drainage systems
- CPCPRF3023 — Fabricate and install external flashings
- CPCPRF3024 — Install roof components
- CPCPRF3025 — Install roof coverings to curved roof structures
- CPCPRF3026 — Install roof sheets, wall cladding and complex flashings
- CPCPRF3027 — Select and install a heritage roof system
- CPCPRF4011 — Design and size roof drainage systems