CPCPMS5011 — Design air conditioning and ventilation systems
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for CPCPMS5011 must cover
151 assessable components: 5 elements (32 performance criteria), 1 performance evidence and 118 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Evaluate design parameters.
- 1.1Clarify and establish scope of work for the design of air conditioning and ventilation systems.
- 1.2Determine design requirements using relevant Australian standards, codes, plans, specifications, manufacturer instructions and client briefs, including factors that contribute to quality, safety and time efficiency.
- 1.3Apply sustainability principles and concepts throughout the design.
- 1.4Evaluate user comfort and specific use conditions to calculate psychrometric evaluation and heat loads.
- 1.5Evaluate building heat losses.
- 1.6Specify distribution requirements for air conditioning and ventilation system applications.
- 1.7Evaluate air conditioning and ventilation systems according to given applications.
- 1.8Evaluate and interpret mechanical services drawings.
- 1.9Evaluate health risks that may arise due to poor maintenance of air conditioning and ventilation systems.
- 1.10Specify minimum performance requirements for several different air conditioning and ventilation systems.
- 1.11Evaluate the suitability of manufacturer specifications and technical manuals for a range of design applications.
- 1.12Carry out research including a desktop study to outline design parameters.
- 1.13Consider the safety of system users or building occupants.
2 Plan system components.
- 2.1Plan appropriate zoning of air conditioning and ventilation systems to comply with performance objectives.
- 2.2Specify air conditioning units for optimum performance.
- 2.3Specify fan types for a range of applications.
- 2.4Plan air diversion systems, including registers, to ensure a balanced system.
- 2.5Plan ventilation and duct work components and specify locations.
- 2.6Specify approved materials for planned design.
- 2.7Complete plans and drawings using relevant Australian standards, codes, manufacturer installation requirements and drawing symbols.
3 Design and size systems.
- 3.1Calculate volume of air changes per hour from given floor plans and details.
- 3.2Specify methods for eliminating health risks from existing or proposed systems, with reference to relevant authority.
- 3.3Design and size air conditioning and ventilation systems for the required applications.
4 Prepare documentation.
- 4.1Prepare client brief for the selected design.
- 4.2Prepare plans and specifications for of air conditioning and ventilation systems.
- 4.3Develop an appropriate checklist, including the formulas required to carry out an air balance to a given specification.
- 4.4Prepare a testing and commissioning schedule.
5 Test systems.
- 5.1Evaluate test procedures for air conditioning and ventilation.
- 5.2Conduct tests using appropriate testing equipment, ensuring tests are conducted for air pressure, air velocity, air volume, humidity, pitot tubes, sound power levels and temperature.
- 5.3Record test results and prepare a report.
- 5.4Design, plan and specify adjustments as required.
- 5.5Produce an operation and maintenance manual.
Performance evidence
- designing, sizing and documenting the layout details for an air conditioning and ventilation system for a 10-storey residential building with ground floor commercial premises and basement car park and include: air conditioning units, ducting systems, controls, fans, zones.
Knowledge evidence
- methods of determining scope of work by: interpreting plans and specifications
- methods of determining scope of work by: reviewing sizing and documenting layout for air conditioning and ventilation systems, including residential and commercial systems
- methods of determining scope of work by: analysing new projects or an existing structure being renovated, extended, restored or maintained
- design requirements: architectural plans
- design requirements: building specifications
- design requirements: fire safety
- design requirements: the National Construction Code (NCC)
- design requirements: owners
- design requirements: tenants
- air-flow requirements and sizing of duct work
- specific use conditions: age and activity of occupants
- specific use conditions: computer requirements
- specific use conditions: food preparation
- specific use conditions: smoke exhaust
- specific use conditions: wet-bulb and dry-bulb temperature and humidity
- psychrometric evaluation: absolute, specific and relative humidity
- psychrometric evaluation: air composition
- psychrometric evaluation: air properties: density, expansion coefficient, kinematic viscosity, Prandtl number, specific heat, temperature, thermal conductivity
- psychrometric evaluation: altitude, density and volume
- psychrometric evaluation: determination of the air condition using a psychrometric or Mollier chart, showing: dewpoint temperature, dry-bulb temperature, enthalpy, humidity ratio, relative humidity, specific volume, wet-bulb temperature
- assessment of factors affecting heat load: building materials
- assessment of factors affecting heat load: insulation
- assessment of factors affecting heat load: number of personnel
- assessment of factors affecting heat load: number of windows
- assessment of factors affecting heat load: room dimensions
- assessment of factors affecting heat load: usage
- assessment of factors affecting heat load: weather effects
- assessment of factors affecting heat load: using: calculations and computer software systems
- assessment of factors affecting heat load: using: heat load calculation methods and formulas
- building heat losses: construction materials
- building heat losses: insulation materials
- building heat losses: maintaining plenum
- building heat losses: occupancy
- building heat losses: room sizes
- legislation, standards and other relevant documentation according to Commonwealth, state and territory legislation and regulations relating to: growth and distribution of Legionella pneumophila bacteria and other water and airborne infectious bacterial agents
- legislation, standards and other relevant documentation according to Commonwealth, state and territory legislation and regulations relating to: handling of materials, including hazardous materials and substances
- legislation, standards and other relevant documentation according to Commonwealth, state and territory legislation and regulations relating to: hazard control
- legislation, standards and other relevant documentation according to Commonwealth, state and territory legislation and regulations relating to: organic and inorganic contaminants
- legislation, standards and other relevant documentation according to Commonwealth, state and territory legislation and regulations relating to: quality assurance requirements, including: AS 1100 Technical drawing materials
- legislation, standards and other relevant documentation according to Commonwealth, state and territory legislation and regulations relating to: AS/NZS 1668 The use of ventilation and air-conditioning in buildings Set
- legislation, standards and other relevant documentation according to Commonwealth, state and territory legislation and regulations relating to: AS/NZS ISO 817:2016 Refrigerants – Designation and safety classification
- legislation, standards and other relevant documentation according to Commonwealth, state and territory legislation and regulations relating to: AS/NZS 5149 Refrigerating systems and heat pumps – Safety and environmental requirements - Parts 1 to 4
- legislation, standards and other relevant documentation according to Commonwealth, state and territory legislation and regulations relating to: AS/NZS 3666 Air-handling and water systems of buildings microbial control - Parts 1 to 4
- legislation, standards and other relevant documentation according to Commonwealth, state and territory legislation and regulations relating to: Environment Protection Authority (EPA)
- legislation, standards and other relevant documentation according to Commonwealth, state and territory legislation and regulations relating to: internal company quality assurance policy and risk management strategy
- legislation, standards and other relevant documentation according to Commonwealth, state and territory legislation and regulations relating to: International Standards Organisation (ISO)
- legislation, standards and other relevant documentation according to Commonwealth, state and territory legislation and regulations relating to: site safety plan
- legislation, standards and other relevant documentation according to Commonwealth, state and territory legislation and regulations relating to: workplace operations and procedures
- specification and operational manual information: commissioning and testing
- specification and operational manual information: components installation
- specification and operational manual information: fittings
- specification and operational manual information: manufacturer specifications, literature and data
- specification and operational manual information: materials
- specification and operational manual information: pumps
- specification and operational manual information: systems
- specification and operational manual information: valves
- specification: air-flow requirements
- specification: equipment selection
- specification: fire safety
- specification: jointing
- specification: manufacturer requirements
- specification: materials
- specification: work health and safety (WHS)
- specification: specialised components
- specification: support
- specification: testing
- specification: workmanship
- plans: axonometric
- plans: cross-sections
- plans: details
- plans: elevations
- plans: isometrics
- plans: schematics
- plans: sections
- plans: plans produced by: computer generation
- plans: plans produced by: drawing equipment
- design and sizing detail: cost
- design and sizing detail: materials and quality of work
- design and sizing detail: milestones
- design and sizing detail: nominated subcontractors
- design and sizing detail: provision of on-site facilities and site access
- design and sizing detail: quality assurance
- design and sizing detail: space allowances
- design and sizing detail: standard procedures
- design and sizing detail: work schedules
- design parameters: client requirements
- design parameters: legislative requirements
- design parameters: WHS requirements
- design parameters: user requirements in relation to zoning
- design parameters: reference to calculations, tables, regulations and manufacturer specifications
- methods of applying sustainability principles and concepts: selecting appropriate material to ensure minimal environmental impact
- methods of applying sustainability principles and concepts: efficient use of material
- methods of applying sustainability principles and concepts: efficient energy usage
- tests and testing equipment for: air pressure
- tests and testing equipment for: air velocity
- tests and testing equipment for: air volume
- tests and testing equipment for: humidity
- tests and testing equipment for: pitot tubes
- tests and testing equipment for: sound power levels
- tests and testing equipment for: temperature
- tests and testing equipment for: air flow
- tests and testing equipment for: climate control
- tests and testing equipment for: defect inspection
- tests and testing equipment for: performance quality assurance (QA) audit
- commissioning schedule information: acoustic performance
- commissioning schedule information: balancing
- commissioning schedule information: system certification
- commissioning schedule information: check for foreign material
- commissioning schedule information: leak check
- commissioning schedule information: system defects
- commissioning schedule information: system functions as per design
- operation and maintenance manual information: as installed drawing
- operation and maintenance manual information: certification documentation
- operation and maintenance manual information: results of commissioning test
- operation and maintenance manual information: maintenance schedules
- operation and maintenance manual information: manufacturer brochures and technical information
- operation and maintenance manual information: regular water quality testing
- operation and maintenance manual information: system operation
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing CPCPMS5011
What does an assessment tool for CPCPMS5011 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCPMS5011 needs to address all 151 unit components: 5 elements with 32 performance criteria, 1 performance evidence requirements, 118 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for CPCPMS5011?
Auditori pulls the current release of CPCPMS5011 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCPMS5011 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing CPCPMS5011 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCPMS5011, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- CPCPMS2021 — Assemble mechanical services components
- CPCPMS3031 — Fabricate and install steel pressure piping
- CPCPMS3032 — Select and fit insulation and sheathing
- CPCPMS3033 — Install small bore heating systems
- CPCPMS3034 — Install and test medical gas pipeline systems
- CPCPMS3035 — Install and test ducting systems
- CPCPMS3036 — Install air handling units
- CPCPMS3037 — Install and commission a single head split system air conditioning
- CPCPMS3038 — Install air conditioning control equipment
- CPCPMS3039 — Maintain mechanical services equipment
- CPCPMS3040 — Install and commission evaporative air cooling systems
- CPCPMS3041 — Install domestic solid fuel burning appliances
Your CPCPMS5011 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate CPCPMS5011 free