CPCPCM5014 — Design sewer infrastructure systems
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for CPCPCM5014 must cover
244 assessable components: 5 elements (33 performance criteria), 7 performance evidence and 204 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Prepare and implement sewer contracts.
- 1.1Identify and apply main utility sewer design and sizing procedures.
- 1.2Document required qualifications, roles and responsibilities of local authority personnel and contracted parties qualified to install sewers.
2 Plan and detail system components.
- 2.1Analyse soil classification, characteristics and types from test results.
- 2.2Detail trenching safety procedures, specifying backfilling and compaction methods.
- 2.3Plan layout of pipework systems, including the type and location of fittings, valves and controls.
- 2.4Specify pipe laying, dewatering and testing procedures for installation of pipework of varying sizes.
- 2.5Calculate self-cleaning velocities, pipe size and grade, and ventilation requirements for a range of systems.
- 2.6Detail sewer connections, access chambers, bedding material and support systems.
- 2.7Determine size and detail requirements for pump station, pumps, controls and equipment.
- 2.8Specify approved materials, jointing methods and installation requirements for sewer infrastructure systems.
- 2.9Identify maintenance procedures of the system.
3 Evaluate design parameters.
- 3.1Establish scope of work for sewer infrastructure systems.
- 3.2Determine design requirements from relevant Australian standards, codes, plans, specifications and client brief.
- 3.3Conduct cost–benefit analysis comparing a range of pipe materials and system design.
- 3.4Analyse and apply statutory and regulatory requirements and relevant Australian Standards and codes for the design of sewer infrastructure systems.
- 3.5Obtain trade and technical manuals and interpret manufacturer requirements.
- 3.6Conduct additional research, including a desktop study to outline design parameters.
- 3.7Determine factors that contribute to quality, safety and time efficiency.
- 3.8Determine point of connection to the authority’s system.
- 3.9Specify safety procedures and regulations for trench safety and for pumping stations and establish performance requirements.
- 3.10Assess pipe sizes using equivalent population (EP) density.
4 Design and size systems.
- 4.1Identify easements and location for sewer infrastructure systems, including pumping rising mains.
- 4.2Design sewer infrastructure systems for a range of applications.
- 4.3Design and detail sewer long sections.
- 4.4Design pump rising main systems.
- 4.5Design pumping stations.
- 4.6Apply computer software packages to design and size sewer infrastructure system.
- 4.7Determine and design ventilation requirements.
- 4.8Apply sustainability principles and concepts throughout the design process.
5 Prepare documentation.
- 5.1Prepare client brief of the desired design.
- 5.2Prepare plans and specification for a range of sewer infrastructure systems.
- 5.3Prepare testing and commissioning schedule.
- 5.4Produce operation and maintenance manual, including information on how to properly and safely maintain the system.
Performance evidence
- designing, sizing and documenting the installation and layout details for a sewer infrastructure system for a residential development of 50 properties, incorporating a gravity system and pumping station, to include:
- sewer reticulation mains
- pump station
- pump rising main
- ventilation
- odour control
- evaluating and documenting design parameters to relevant Australian standards and codes, and regulatory, client and manufacturer requirements.
Knowledge evidence
- common terminology and definitions used in the design of sewer infrastructure systems
- application of statutory and regulatory requirements and relevant Australian standards and codes:
- Acts, regulations and Commonwealth, state or territory and local government policies
- AS/NZS 3500 National plumbing and drainage
- AS 2200 Design charts for water supply and sewerage
- Environmental Protection Authority (EPA)
- National Construction Code (NCC)
- Sewerage Code of Australia
- other relevant Australian standards and codes
- utility provider’s design standards -e.g. Water Corporation (WA), Urban Utilities (QLD)
- scope of work requirements:
- interpreting plans and specifications
- sizing and documenting layout sewer infrastructure system
- design requirements:
- architectural plans
- builder specifications
- fire safety requirements
- owner requirements
- pipework identification
- flow requirements and sizing of pipework
- ventilation requirements
- cost–benefit analysis comparing the range of suitable materials and system choices available to enable cost-effective choices without compromising the integrity of the project
- nature of materials used and effects of performance under various conditions:
- cast iron
- concrete
- vitrified clay pipes (VCP)
- polyethylene (PE)
- polypropylene (PP)
- unplasticised polyvinyl chloride (uPVC)
- other approved materials
- manufacturer requirements:
- material specifications
- collection and storage systems
- design and installation
- equipment installation
- pump installation
- technical manuals
- trench safety procedures:
- conditions affecting trench stability
- condition of soils disturbed by previous excavations
- effect of water on excavations
- effects of moisture content on excavated trenches
- traffic and vibrations
- confined space safety requirements e.g. for exhaust emissions
- prevention of trench collapse
- trench collapse procedures
- trench collapse inspection procedures
- trench excavation methods used for different:
- backfilling methods
- bedding methods
- depth
- slope
- support systems
- types
- layout of pipework systems:
- gravity
- pumped and rising mains
- vacuum
- identification of easements and location for sewer infrastructure systems, including pumping rising mains
- layout requirements to:
- not unduly affect building integrity and aesthetic appeal
- apply principles of economy, serviceability, durability and fitness for use
- characteristics and application of different fittings, valves and controls:
- fittings
- bends
- flanges
- junctions
- inspection openings
- unions
- valves non-return and isolation
- controls
- level
- alarms
- management communication systems
- pipelaying procedures:
- cutting, handling and storage procedures
- fittings used for sewerage work
- jointing methods and procedures
- laying procedures for pipework
- methods of dewatering trenches
- methods of grading and maintaining pipe direction and reduced levels
- methods of placing bedding materials, encasing pipes, backfilling and compacting
- methods of testing sewer drains
- methods of pressure testing pump rising mains
- processes for calculating pipe size, pipe grade and ventilation requirement:
- determination of flow and loadings
- gradient calculations
- equivalent population (EP) density
- interpretation of design charts and tables
- pipe sizing calculations
- projected flows
- pumping flow rates
- reduced level calculations
- self-cleaning pipe velocities
- stormwater infiltration
- system ventilation
- access chamber details:
- access
- benching
- connections
- covers
- flow and gradient
- open and closed channel
- sizing
- pump station, pumps, controls and equipment requirements:
- access covers
- access ladders
- automatic controls
- capacity
- corrosion-resistant materials
- emergency storage and power supply
- impeller sizing and selection
- inlet and outlet design
- installation and mounting
- odour control
- macerator requirements
- management communication system
- provision for servicing
- pump selection
- pump well sizing
- space requirements
- valves
- ventilation
- warning system
- characteristics and application of different jointing methods
- installation requirements:
- bedding
- pipe protection
- cover
- corrosion
- impact
- level of workmanship
- manufacturer-recommended specific fixings
- pipe support
- provision for pipe movement
- serviceability and access
- rising main systems:
- approved pressure pipe and fittings
- calculated rise and pump delivery requirements
- environmental protection
- pump sizing to meet calculated flow conditions
- self-cleaning pipe velocities
- odour control
- the use and limitations of computer software packages including manufacture and proprietary design software
- plans and specifications requirements:
- axonometric
- cross-sections
- details
- elevations
- isometrics
- schematics
- site
- sections
- specifications
- bedding
- commissioning
- excavation requirements
- support
- concrete support and detailing specialised components
- jointing
- access chambers (manholes)
- manufacturer requirements
- materials
- piping
- pumps
- pumping stations
- WHS
- testing
- workmanship
- testing methods:
- air pressure
- drainage inspection
- hydrostatic
- performance
- compliance with authorities’ discharge requirements
- quality assurance (QA) audit
- commissioning schedule requirements:
- system certification
- check for foreign material
- containment
- leak check
- operational
- pumping
- system defects
- system functions as per design
- ventilation
- odour control
- WHS compliance
- operation and maintenance manual requirements:
- as installed drawings
- certification documentation
- emergency procedures
- results of commissioning test
- maintenance schedules
- manufacturer brochures and technical information
- odour control
- WHS requirements
- ventilation
- sustainability principles and concepts:
- selecting appropriate material to ensure minimal environmental impact
- efficient use of material
- efficient energy usage/capital outlay comparison
- consideration of the Green Building Council of Australia rating scheme
- principles of technology in the design of sewer infrastructure systems.
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing CPCPCM5014
What does an assessment tool for CPCPCM5014 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCPCM5014 needs to address all 244 unit components: 5 elements with 33 performance criteria, 7 performance evidence requirements, 204 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for CPCPCM5014?
Auditori pulls the current release of CPCPCM5014 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCPCM5014 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing CPCPCM5014 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCPCM5014, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- CPCPCM2039 — Carry out interactive workplace communication
- CPCPCM2040 — Read plans, calculate quantities and mark out materials
- CPCPCM2041 — Work effectively in the plumbing services sector
- CPCPCM2043 — Carry out WHS requirements
- CPCPCM2045 — Handle and store plumbing materials
- CPCPCM2046 — Use plumbing hand and power tools
- CPCPCM2047 — Carry out levelling
- CPCPCM2048 — Cut and join sheet metal
- CPCPCM2049 — Cut using oxy-acetylene equipment
- CPCPCM2052 — Weld mild steel using oxy-acetylene equipment
- CPCPCM2053 — Weld using metal arc welding equipment
- CPCPCM2054 — Carry out simple concreting and rendering
Your CPCPCM5014 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate CPCPCM5014 free