CPCPCM5012Design complex stormwater and roof drainage systems

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for CPCPCM5012 must cover

158 assessable components: 4 elements (22 performance criteria), 4 performance evidence and 132 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Identify design parameters.

  • 1.1Determine design scope from plans, specifications and client brief.
  • 1.2Identify applicable regulatory and legislative requirements for the design of complex stormwater and roof drainage systems.
  • 1.3Apply sustainability principles and concepts as part of the design process.
  • 1.4Account for the safety of system users or building occupants.
  • 1.5Determine and estimate rainfall intensity and volume using measurements of different catchment areas.
  • 1.6Analyse overland flood path affecting the property and buildings.
  • 1.7Research and evaluate other information likely to impact the stormwater and roof drainage system design.

2 Plan system components.

  • 2.1Plan and evaluate strategies for harvesting and re-using rainwater.
  • 2.2Plan and evaluate methods of collection and disposal of roof surface run-off water.
  • 2.3Plan and evaluate stormwater detention and retention systems and first-flush stormwater systems.
  • 2.4Determine and specify the most suitable methods of preventing backflow of sub-soil and stormwater into buildings.
  • 2.5Plan and evaluate treatment and disposal options for stormwater discharge.
  • 2.6Plan layout of system components according to design parameters and site limitations and coordinate with other services.

3 Design and size systems.

  • 3.1Apply regulatory requirements, Australian Standards and codes to all aspects of the stormwater and roof drainage system design.
  • 3.2Calculate and specify storage volume, pump capacity and discharge pipe size required for stormwater pumping systems as necessary.
  • 3.3Design stormwater systems requiring pumping.
  • 3.4Design, select, size and detail system components using appropriate calculations, software applications and approved materials.
  • 3.5Specify correct installation, laying and jointing procedures for approved materials and components.

4 Prepare documentation.

  • 4.1Prepare client brief of the preferred design.
  • 4.2Prepare plans and specifications.
  • 4.3Prepare testing and commissioning schedule.
  • 4.4Produce operation and maintenance manual, including information on how to properly and safely maintain the system.

Performance evidence

  • designing, sizing and documenting the layout details of a complex stormwater and roof drainage system for a site incorporating a high-rise mixed development building within a wide-span multiple building project (such as a school), including: - specification - access chambers - grade of drains - holding pits - collection sumps - detention, retention and harvesting systems - disposal methods for stormwater catchments to council or utility provider’s drainage network or disposal on-site - other system components
  • using appropriate design software to produce detailed drawings and layout plans, including long sections and cross-sections of the designed system
  • applying sustainability principles and concepts throughout to achieve a star rating under the Green Building Council of Australia rating scheme
  • evaluating health risks associated with stormwater and roof drainage systems and action as required within the system design.

Knowledge evidence

  • relevant codes, Australian standards and specifications:
  • Australian rainfall and run-off (ARR) guidelines
  • AS/NZS 3500 Plumbing and drainage set
  • manufacturer specifications
  • National Construction Code (NCC)
  • building codes
  • work health and safety (WHS) and environmental requirements
  • plumbing regulations
  • terminology and definitions used in hydraulic design
  • computer-aided design (CAD) software
  • installation methods used in hydraulic systems
  • hazards associated with devices and systems used in the hydraulic sector
  • environmental requirements:
  • clean-up protection
  • stormwater protection
  • waste management
  • water quality management
  • quality assurance requirements:
  • Environmental Protection Agency (EPA)
  • internal company quality assurance policy and risk management strategies
  • International Standards Organisation (ISO)
  • site safety plan
  • workplace operations and procedures
  • safe work procedures relating to planning, sizing and documenting layout of pipework and fixtures
  • local government requirements:
  • Integrated Planning Act (IPA)
  • standard drawings and details
  • town planning requirements
  • treatment requirements such as:
  • screens
  • silt traps
  • solid removal systems
  • plans and documentation relevant to the design:
  • site plans
  • cross-sections
  • details
  • elevations
  • sections
  • civil drawings
  • contour levels
  • existing services
  • reduced levels
  • manufacturer requirements and specifications
  • catchment area analysis
  • stormwater design
  • surveys
  • system components:
  • access chambers (manholes)
  • channels
  • culverts
  • downpipes
  • fire rating of penetrations
  • grated pits
  • gullies
  • guttering
  • inspection chambers
  • inspection openings
  • kerbs
  • piping
  • pits
  • treatment options for stormwater discharge:
  • grass and rock swales
  • lagoons
  • momentum diffusers
  • ponds
  • screens
  • silt traps
  • traps
  • other removal systems as determined
  • disposal options for stormwater discharge:
  • connection to stormwater mains
  • creeks
  • harbour
  • kerb and street channels
  • lakes
  • on-site harvesting and reuse
  • rainwater collection systems, including tanks and dams
  • rivers
  • streams
  • determining rainfall intensities by:
  • average rainfall intervals
  • roof, surface and subsurface calculations
  • site location
  • time and concentration
  • catchment areas:
  • land surface catchment areas, including a variety of surface conditions such as grassed and paved areas
  • roof catchment areas
  • stormwater drainage systems:
  • access chambers (manholes)
  • collection sumps
  • detention and retention
  • grade of drains
  • harvesting
  • holding pits
  • pump discharge
  • approved piping materials:
  • concrete
  • earthenware or vitrified clay pipe (VCP)
  • fibre cement (FRC)
  • polyvinyl chloride (PVC)
  • other approved materials
  • approved fittings:
  • bends
  • grates
  • gullies
  • junctions
  • non-return valves
  • stormwater systems requiring pumping:
  • holding tanks
  • overflow provisions
  • pump and controls
  • rising main
  • methods of applying sustainability principles and concepts:
  • selecting appropriate material to ensure minimal environmental impact
  • harvesting and reuse
  • efficient use of material
  • efficient energy usage/capital outlay comparison
  • effect on the environment due to overflow or leakage
  • consideration of the Green Building Council of Australia rating scheme
  • specification and user manuals which include information on:
  • commissioning
  • bedding
  • support
  • concrete support and detailing specialised components
  • jointing
  • access chambers (manholes)
  • manufacturer requirements
  • materials
  • pumps
  • WHS
  • testing
  • workmanship.

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing CPCPCM5012

What does an assessment tool for CPCPCM5012 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCPCM5012 needs to address all 158 unit components: 4 elements with 22 performance criteria, 4 performance evidence requirements, 132 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for CPCPCM5012?

Auditori pulls the current release of CPCPCM5012 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCPCM5012 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing CPCPCM5012 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCPCM5012, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your CPCPCM5012 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate CPCPCM5012 free