CPCPCM3025 — Install trench support
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for CPCPCM3025 must cover
39 assessable components: 4 elements (15 performance criteria), 1 performance evidence and 23 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Prepare for work.
- 1.1Access, read and determine installation requirements from relevant job plans and specifications, codes, Australian standards, manufacturer’s specifications and jurisdictional requirements.
- 1.2Identify and apply workplace, work health and safety (WHS) and environmental requirements.
- 1.3Plan and sequence tasks in conjunction with others involved in or affected by the work.
- 1.4Select and check tools and equipment, including personal protective equipment (PPE), for serviceability.
- 1.5Identify the location of underground services.
- 1.6Prepare work area to support efficient installation of trench support systems.
2 Identify installation requirements.
- 2.1Source equipment required for the excavation.
- 2.2Identify potential hazards and determine and implement control measures.
- 2.3Set out trench support installation according to relevant job plans and specifications, codes, Australian standards, manufacturer’s specifications and jurisdictional requirements.
- 2.4Consider the location of existing services and any traffic control requirements during installation.
3 Install trench support.
- 3.1Determine and transfer installation requirements for installing trench support.
- 3.2Install trench support according to relevant job plans and specifications, codes, Australian standards, manufacturer’s specifications and jurisdictional requirements and without damage to surrounding environment, existing structures or other services.
- 3.3Check installation for compliance with relevant job plans and specifications, codes, Australian standards, manufacturer’s specifications and jurisdictional requirements.
4 Clean up.
- 4.1Remove trench support equipment, backfilling trench and return support equipment to storage area in accordance with state and territory legislation and workplace policies and procedures.
- 4.2Clean tools and equipment, check for serviceability reporting any damage, store and secure.
Performance evidence
- installing and removing as a minimum, two trench support systems using an approved shoring method and equipment to a minimum depth of 1.5 metres.
Knowledge evidence
- types of trench support systems including:
- aluminium shoring shields
- close timber shoring
- drag boxes
- fixed and/or adjustable trench boxes
- hydraulic vertical shoring
- lite box aluminium panels
- powerbrace
- slide rails
- raking shoring
- hazards associated with excavation including:
- soil types and the likelihood of sudden changes in soil
- presence of ground water and water entering cracks in soil adjacent to the excavation
- effects on ground material by exposure to the air after excavation
- vibration due to machinery, plant, motor vehicles and machinery
- excavation depth and shape
- presence or proximity of other underground services
- presence of excavation, backfill material or equipment placed near an excavation
- excavation within public property requirements
- excavation close to footings and buildings
- work health and safety (WHS) requirements associated with the installation of trench support systems
- how to access relevant information, including job plans and specifications, codes, Australian standards, manufacturer’s specifications and jurisdictional requirements
- tools, materials and equipment used for the installing trench support.
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing CPCPCM3025
What does an assessment tool for CPCPCM3025 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCPCM3025 needs to address all 39 unit components: 4 elements with 15 performance criteria, 1 performance evidence requirements, 23 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for CPCPCM3025?
Auditori pulls the current release of CPCPCM3025 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCPCM3025 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing CPCPCM3025 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCPCM3025, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- CPCPCM2039 — Carry out interactive workplace communication
- CPCPCM2040 — Read plans, calculate quantities and mark out materials
- CPCPCM2041 — Work effectively in the plumbing services sector
- CPCPCM2043 — Carry out WHS requirements
- CPCPCM2045 — Handle and store plumbing materials
- CPCPCM2046 — Use plumbing hand and power tools
- CPCPCM2047 — Carry out levelling
- CPCPCM2048 — Cut and join sheet metal
- CPCPCM2049 — Cut using oxy-acetylene equipment
- CPCPCM2052 — Weld mild steel using oxy-acetylene equipment
- CPCPCM2053 — Weld using metal arc welding equipment
- CPCPCM2054 — Carry out simple concreting and rendering
Your CPCPCM3025 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate CPCPCM3025 free