CPCCRI3015 — Perform advanced tilt-up slab erection
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for CPCCRI3015 must cover
104 assessable components: 6 elements (27 performance criteria), 7 performance evidence and 70 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Plan and prepare to perform advanced tilt-up slab erection.
- 1.1Interpret work instructions and associated documentation and clarify requirements with relevant persons.
- 1.2Plan all work to comply with relevant legislation, regulations, standards, codes, work health and safety, environmental and workplace requirements.
- 1.3Select plant, tools and equipment required for work tasks, check for serviceability and rectify or report identified faults.
- 1.4Calculate materials quantities.
- 1.5Acquire materials for task and locate them safely ready for use.
2 Select and check equipment.
- 2.1Erect required safety signage and barricades and fit personal protective equipment (PPE).
- 2.2Select resources, materials and equipment in accordance with load charts and inspect for compliance with work instructions.
- 2.3Inspect lifting equipment in accordance with manufacturer and workplace requirements.
- 2.4Label, reject and dispose of any lifting and load-shifting equipment identified as inconsistent with manufacturer requirements, to prevent its use in any circumstance.
- 2.5Select elevated work platforms and other means of mechanical access systems as specified.
- 2.6Install fall arrest equipment.
- 2.7Select personnel cartage systems.
3 Erect tilt-up slabs.
- 3.1Review lift plan and determine job sequencing schedule and documentation, and communicate this information to relevant persons to ensure coordination.
- 3.2Calculate and confirm load mass and load distribution.
- 3.3Determine erection sequence for tilt-up slab components.
- 3.4Assemble and erect lifting or pulling devices for movement of loads.
- 3.5Sling load.
- 3.6Shift load in accordance with job safety and environmental analysis (JSEA) and safe work method statement (SWMS).
- 3.7Maintain stability of load during lifting, tilting and transportation.
- 3.8Direct load to landing position in accordance with engineering specifications.
4 Position and anchor tilt-up slabs.
- 4.1Position tilt slab components in accordance with engineering specifications.
- 4.2Achieve shape of structure by checking dimensions and applying temporary bracing.
- 4.3Anchor tilt slab components in accordance with manufacturer requirements and engineering specifications.
5 Remove rigging equipment.
- 5.1Dismantle lifting/shifting equipment and packing, return to resting position and inspect for wear.
- 5.2Complete logbook and site records in accordance with workplace requirements.
6 Clean up.
- 6.1Clear work area and dispose of, reuse or recycle materials in accordance with regulatory and workplace requirements.
- 6.2Clean, check, maintain and store tools and equipment in accordance with manufacturer and workplace requirements.
Performance evidence
- one multi-point precast tilt-up slab of at least 10 tonnes
- one cast in situ tilt-up slab of at least 10 tonnes
- determining lifting points, temporary supports and permanent fixing points from panel erection drawings by following the lift plan
- positioning and bracing the slab
- safe unloading from the truck
- rotating panel from one plane to another
- incorporating at least two bracing techniques
Knowledge evidence
- workplace and regulatory requirements for performing advanced tilt-up slab erection under applicable Commonwealth, state or territory work health and safety (WHS) legislation and codes of practice:
- job safety and environmental analyses (JSEAs)
- safe work method statements (SWMSs)
- safety manuals and instructions for plant, tools and equipment
- signage and barricades
- personal protective equipment (PPE)
- working at heights requirements
- environmental and worksite safety plans
- reporting problems
- scope of work for performing advanced tilt-up slab erection:
- calculations:
- load charts
- fleet angles
- diverter sheaves
- lead loads
- head loads
- load angle factors
- multiple fall
- load share
- precast compliance charts
- safe working loads
- load slinging methods:
- straight sling
- adjustable sling
- reeved sling
- inclined sling
- advanced lifting techniques:
- rotation (turning panel from one plane to another)
- standard lift from a truck
- lift from flat on ground
- tilt-up slabs:
- prefabricated and cast in situ tilt-up slabs
- slabs with cast-in lifting and/or bracing inserts
- bracing of tilt-up slabs:
- lateral bracing
- end bracing
- main bracing
- knee bracing
- deadman bracing
- types, characteristics and limitations of tools, equipment and materials required for performing advanced tilt-up slab erection:
- chain slings
- flexible steel wire rope (FSWR) slings
- air winches
- chain blocks
- chain winches
- come-alongs
- drifts
- eye bolts
- hammers
- hand operated creeper winches
- jacks
- podgers
- pulley blocks
- shackles
- shifting spanners
- sledge hammers
- spanners
- spirit levels and automatic levels
- tape measures
- trolleys
- turn buckles
- wedges
- wrenches
- requirements for use of tools, equipment and materials for performing advanced tilt-up slab erection:
- safe operating procedures
- operational, maintenance and basic diagnostic procedures
- workplace and equipment safety requirements
- signalling methods and communications
- processes for completing logbooks and site records
- requirements for cleaning up work area, maintaining and storing plant, tools, equipment and materials, and for environmentally friendly waste management.
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing CPCCRI3015
What does an assessment tool for CPCCRI3015 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCCRI3015 needs to address all 104 unit components: 6 elements with 27 performance criteria, 7 performance evidence requirements, 70 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for CPCCRI3015?
Auditori pulls the current release of CPCCRI3015 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCCRI3015 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing CPCCRI3015 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCCRI3015, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
Your CPCCRI3015 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate CPCCRI3015 free