CPCCLTC4001Licence to operate a tower crane

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for CPCCLTC4001 must cover

60 assessable components: 4 elements (28 performance criteria), 14 performance evidence and 18 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Plan task

  • 1.1Review task instructions, consult with relevant persons to seek clarification as required, and obtain relevant workplace information.
  • 1.2Obtain and interpret information, including safe work method statements (SWMSs), required to ensure that activities are performed in compliance with workplace-specific and safe work requirements.
  • 1.3Obtain and interpret information required to ensure that equipment inspection, use, maintenance and storage complies with manufacturer requirements.
  • 1.4Identify workplace and task-specific hazards, including hazards associated with working at heights, and determine required risk controls and safety measures and equipment, including fall prevention and fall arrest equipment, as required.
  • 1.5Identify methods of moving and placing tools, equipment and materials to minimise the risk of falling objects.
  • 1.6Calculate load weight in consultation with licensed dogger.
  • 1.7Consult with licensed dogger to confirm that load weight is within the rated capacity of the crane and the working load limit (WLL) of the lifting gear.
  • 1.8Determine and inspect crane and load movement paths.
  • 1.9Confirm implementation of and compliance with traffic management plan.
  • 1.10Establish required communication methods with relevant persons.
  • 1.11Establish and maintain communication with relevant persons to ensure lift plan and risk controls are communicated clearly, including any impact on other workplace activities.

2 Prepare for task

  • 2.1Check signs and labels to ensure visibility and legibility.
  • 2.2Assess wind and other adverse weather conditions and determine whether their impact on the crane and loads is within the manufacturer requirements for safe operation.
  • 2.3Access crane safely.
  • 2.4Test crane safety devices in accordance with workplace requirements.
  • 2.5Carry out pre-start crane checks and report, record and take action on identified damage or defects, in accordance with safe work practices, workplace-specific procedures and policies, and manufacturer requirements.
  • 2.6Check that crane logbook has been completed and signed, that it is correct for crane type and current compliance, and that any rectifications have been signed off.
  • 2.7Start crane, carry out operational checks, check for abnormal noises, smoke or fumes and shut down, tag out, report and record identified abnormalities in accordance with safe work practices, workplace-specific procedures and policies, and manufacturer requirements.

3 Transfer load

  • 3.1Position boom or jib and hook block over the load as directed by licensed dogger.
  • 3.2Carry out test lift to allow for checks and adjustments to slinging to be made by licensed dogger.
  • 3.3Under the direction of the licensed dogger, transfer loads using appropriate crane movements.
  • 3.4Use radio and interpret hand and whistle signals to communicate with licensed dogger.
  • 3.5Lower and land load, allowing lifting gear to be disconnected.

4 Shut down and secure crane

  • 4.1Apply hoist, luffing, trolley and travel brakes.
  • 4.2Shut down crane and place in weather-vane position in accordance with manufacturer requirements.
  • 4.3Carry out routine shutdown checks, and secure crane and equipment, including cabin, against unauthorised access.
  • 4.4Exit the crane safely.
  • 4.5Report and record any damage or defects.

Performance evidence

  • To demonstrate competency in this unit, a candidate must meet the elements and performance criteria by safely operating from the cabin, a tower crane with a minimum tower height of 20 m and a maximum rated capacity of at least 3000 kg. The candidate must move four loads of different shapes, sizes and weights in conjunction with a licensed dogger.
  • For all loads, the candidate must:
  • check relevant workplace information, including safe work method statements (SWMSs), and equipment service and maintenance records and checklists
  • perform all activities in compliance with safe work practices and workplace-specific procedures and policies
  • check, use, maintain and store equipment in compliance with manufacturer requirements
  • identify hazards and implement appropriate risk controls and safety measures and equipment
  • confirm that load weight is within the rated capacity of the crane
  • locate and interpret signs and labels
  • check and use safety devices
  • lift and move loads using the main hook through an obstacle course including a 90-degree minimum slew, with the load in full view of the candidate and using all crane operational controls: luffing/trolleying levers, hoisting and lowering levers, slewing levers, foot pedals, engine speed control
  • use two-way radio and interpret hand and whistle signals to communicate with licensed dogger
  • implement shutdown procedures.
  • Movements must include: luffing or trolleying, slewing, hoisting and lowering.
  • Loads must include: a load of more than 50% of the configured capacity of the crane, stillage containing at least ten scaffolding standards or loose steel pipes of 200 kg or more that requires a licensed dogger to sling, an uneven load that requires a licensed dogger to sling, a round load with a minimum diameter of 300 mm and minimum length of 3 m that requires a licensed dogger to sling.

Knowledge evidence

  • To be competent in this unit, a candidate must demonstrate knowledge of:
  • safe work requirements for operating a tower crane under Australian Standards, and Commonwealth and state or territory work health and safety (WHS) legislation and codes of practice
  • workplace information, including legislative requirements covered by: SWMSs, permits and certifications, information about equipment: service and maintenance checklists and records, manufacturer specifications and manuals, workplace procedures, including emergency plans and incident reporting
  • hazard identification and mitigation strategies, including the hierarchy of control: elimination, substitution, isolation, engineering controls, administrative controls, use of personal protective equipment (PPE)
  • hazards commonly encountered in tower crane operations: overhead and underground hazards, including powerlines, other cranes and booms, other plant, obstructions, combustible substances, including fuel, electrical hazards, insufficient lighting, traffic, wind and other adverse weather conditions, pedestrian traffic, work required at heights
  • risk controls and safety measures and equipment: safety tags on electrical switches and isolators, insulated powerlines, safety observer, exclusion zone, disconnected power, traffic barricades and controls, pedestrian controls, movement of obstructions, evacuation procedures, adequate illumination, firefighting equipment, including a fire extinguisher of adequate capacity near the operator’s position, appropriate earthing for the conditions, such as static electricity build up due to electromagnetic radiation (EMR) or wind, fall prevention and fall arrest equipment
  • PPE: hard hat, safety boots, gloves, high-visibility clothing, breathing, hearing, sight, skin and sun protection
  • hand and whistle communication signals: stop, hoist up and down, luff boom up and down, trolley in and out, slew left and right
  • signs and labels: crane data plates and labels, load charts, crane decals, operational control lever labels
  • tower crane safety devices: audible and visual devices, aviation lights, illumination, motion limits, overload limits, anti-collision devices
  • crane controls: luffing levers, hoisting and lowering levers, slewing levers, trolleying levers, slew and boom brake and locks, foot pedals, emergency stop control, engine speed control
  • crane movements: luffing, slewing, hoisting and lowering, trolleying
  • multiple crane communication systems
  • processes for responding to unplanned and unsafe situations, including equipment failure or loss of control
  • emergency and evacuation procedures, including fire procedures
  • shutdown procedures as applicable: raise boom or jib to shutdown position, park trolley in shutdown position, retract hoist rope and hook block, idle engine to stabilise temperature, turn off engine, place in weather vane mode, remove key from ignition, isolate electrical supply, isolate fuel, lock and secure cabin, lock and secure platform access hatch
  • tower crane characteristics, capabilities and operation to suit loads of different shapes, sizes and weights
  • use and interpretation of crane manufacturer specifications, including load charts to enable the crane to be configured within its rated capacity.

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing CPCCLTC4001

What does an assessment tool for CPCCLTC4001 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCCLTC4001 needs to address all 60 unit components: 4 elements with 28 performance criteria, 14 performance evidence requirements, 18 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for CPCCLTC4001?

Auditori pulls the current release of CPCCLTC4001 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCCLTC4001 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing CPCCLTC4001 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCCLTC4001, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your CPCCLTC4001 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate CPCCLTC4001 free