CPCCCA3018 — Construct, erect and dismantle formwork for stairs and ramps
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for CPCCCA3018 must cover
38 assessable components: 5 elements (22 performance criteria), 2 performance evidence and 14 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Plan and prepare.
- 1.1Read and interpret work instructions and plan sequence of work.
- 1.2Plan all work to comply with laws and regulations, the National Construction Code (NCC), Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications, workplace requirements, drawings and specifications.
- 1.3Select tools and equipment, check for serviceability and report any faults.
- 1.4Select and use personal protective equipment (PPE) for each part of the task.
- 1.5Inspect work site, locate services, assess hazards and apply risk controls, including required signage and barricades.
- 1.6Select materials required for task, calculate quantities, handle safely and prepare and position ready for use.
2 Set out formwork.
- 2.1Check formwork location for accuracy against plans and specifications.
- 2.2Check design of stairs or ramp and method of joining formwork, and determine levels from drawings, specifications and site inspection.
- 2.3Determine rise, going and pitch of stairs and ramp from drawings, specifications, site inspection, rise measurements, and requirements of the National Construction Code (NCC).
- 2.4Calculate full size of stairs or ramp and set out.
- 2.5Set out materials for formwork, including stringer form, to pitch of stairs with rises not exceeding specified space between treads.
3 Assemble and erect formwork.
- 3.1Place, fix and brace landing bearers and joists.
- 3.2Erect and brace stairs or ramp formwork soffit.
- 3.3Cut, install and brace formwork for stringers.
- 3.4Locate and fix formwork stringers for stairs and ramps.
- 3.5Set out, cut square to length, and fix material for face of treads.
- 3.6Brace risers at mid-span to prevent deflection under the load of wet concrete.
4 Strip formwork.
- 4.1Strip formwork and bracing sequentially and safely.
- 4.2Check formwork for reusability and dispose of damaged components.
- 4.3Safely de-nail, clean, oil and store or stack reusable formwork components.
5 Clean up.
- 5.1Clean up, meeting all legislative and workplace requirements for safety, waste disposal and materials handling.
- 5.2Check, maintain and store tools and equipment and report any faults.
Performance evidence
- one flight of stairs, freestanding or against a wall with a minimum rise of 1800 mm
- one ramp with a minimum rise of 400 mm and 5.6 metres long.
Knowledge evidence
- compliance requirements of the National Construction Code and Australian Standards relevant to constructing, erecting and dismantling formwork for stairs and ramps
- workplace quality policies and standards for constructing, erecting and dismantling formwork for stairs and ramps
- safety requirements for constructing, erecting and dismantling formwork for stairs and ramps
- line, level and plumb for constructing, erecting and dismantling formwork for stairs and ramps
- common formwork faults, problems and rectification methods
- materials used to construct and erect formwork
- fixings for formwork
- techniques to construct, erect and strip and dismantle formwork
- contents, terms and symbols used in plans, specifications and drawings for constructing, erecting and dismantling formwork for stairs and ramps
- types and uses of tools and equipment used to erect and strip and dismantle formwork
- processes for measuring and setting out formwork
- processes for calculating material requirements for constructing and erecting formwork for stairs and ramps
- regulations on stair and ramp construction for safe use, including disability access
- processes to construct stairs and ramps.
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing CPCCCA3018
What does an assessment tool for CPCCCA3018 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCCCA3018 needs to address all 38 unit components: 5 elements with 22 performance criteria, 2 performance evidence requirements, 14 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for CPCCCA3018?
Auditori pulls the current release of CPCCCA3018 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCCCA3018 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing CPCCCA3018 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCCCA3018, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- CPCCCA2002 — Use carpentry tools and equipment
- CPCCCA2011 — Handle carpentry materials
- CPCCCA3001 — Carry out general demolition of minor building structures
- CPCCCA3002 — Carry out setting out
- CPCCCA3003 — Install flooring systems
- CPCCCA3004 — Construct and erect wall frames
- CPCCCA3005 — Construct ceiling frames
- CPCCCA3006 — Erect roof trusses
- CPCCCA3007 — Construct pitched roofs
- CPCCCA3008 — Construct eaves
- CPCCCA3009 — Construct advanced roofs
- CPCCCA3010 — Install windows and doors
Your CPCCCA3018 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate CPCCCA3018 free