CPCCBL3009 — Install flashings and damp proof course
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for CPCCBL3009 must cover
35 assessable components: 4 elements (20 performance criteria), 5 performance evidence and 9 knowledge evidence requirements, plus 1 foundation skills. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Prepare for work.
- 1.1Select, fit correctly and use personal protective equipment (PPE) appropriate for job.
- 1.2Read, interpret and apply flashing and damp proof course requirements from current plans, specifications and codes.
- 1.3Follow requirements in workplace safety and environmental documentation and workplace procedures.
- 1.4Use measurements and apply formulas to calculate material quantities.
- 1.5Determine job priorities and sequence job tasks in consultation with others on site.
- 1.6Identify potential hazards and determine and implement control measures.
- 1.7Select and check condition of plant, equipment and tools and report damage or faults to relevant person.
- 1.8Check conformity of materials against the specifications and place materials in preparation for the work.
2 Prepare material and surface.
- 2.1Inspect specified materials for defects, damage or non-compliance with specifications.
- 2.2Locate position of impervious material from plans and specifications.
- 2.3Prepare structure and surface to manufacturer’s specifications.
- 2.4Measure and cut flashing material allowing for specified laps.
3 Install flashing and damp-proof course (DPC).
- 3.1Dress flashing and DPC materials in preparation for installation.
- 3.2Lay, lap and fit or build in flashings and DPC to prevent moisture movement and divert the travel of moisture.
- 3.3Form and seal flashing and moisture barrier around openings.
- 3.4Finish any exposed flashing and moisture barrier.
- 3.5Locate and ensure weep holes are clean and functional.
4 Clean up.
- 4.1Clear the work area, and dispose of, reuse or recycle materials following workplace and environmental requirements.
- 4.2Clean tools and equipment, check for serviceability and report damage or faults.
- 4.3Store and secure tools and equipment following workplace procedures.
Performance evidence
- install damp proof course (DPC) in a cavity brick or masonry veneer construction, which includes internal and external corners
- install window and door head and stile flashings to a cavity brick or masonry veneer construction
- install stepped and tray flashing to a masonry wall at roof abutment or to a chimney at the roof line
- install flashing to a masonry parapet
- comply with flashing and damp proof course standards, codes and manufacturer’s specifications
Knowledge evidence
- characteristics, applications and limitations of specified materials used for flashing and damp proofing: aluminium sheeting, copper, bituminous sheeting, emulsions, lead and polyurethane sheeting, polythene sheeting
- processes and techniques for: damp-proofing to provide a barrier to moisture movement; flashing to divert the travel of moisture; stepped and level flashing for parapets and gables; dressing, fitting and building in various flashings
- construction terminology relating to flashing and damp proofing
- functional and operational features of plant, equipment and hand and power tools: battery operated tools
- workplace safety: working at heights; exposure to silica; exposure to loud noise; hazardous manual handling; hazardous materials
- current and relevant standards and building codes relating to flashings and DPC
- key requirements of the National Construction Code (NCC) relevant to installation of flashings and damp proof course
- features of working drawings and specifications
- environmental requirements for workplace processes and waste disposal
Foundation skills
- technology skills: use digital tools and devices to source job information and communicate effectively with others
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing CPCCBL3009
What does an assessment tool for CPCCBL3009 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCCBL3009 needs to address all 35 unit components: 4 elements with 20 performance criteria, 5 performance evidence requirements, 9 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for CPCCBL3009?
Auditori pulls the current release of CPCCBL3009 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCCBL3009 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing CPCCBL3009 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCCBL3009, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- CPCCBL2001 — Handle and prepare bricklaying and blocklaying materials
- CPCCBL2002 — Use bricklaying and blocklaying tools and equipment
- CPCCBL3001 — Lay paving
- CPCCBL3002 — Carry out masonry veneer construction
- CPCCBL3003 — Carry out cavity brick construction
- CPCCBL3004 — Construct masonry steps and stairs
- CPCCBL3005 — Lay masonry walls and corners
- CPCCBL3006 — Lay multi-thickness walls and piers
- CPCCBL3007 — Install glass blockwork
- CPCCBL3010 — Construct masonry arches
- CPCCBL3011 — Construct curved walls
- CPCCBL3012 — Construct fireplaces and chimneys
Your CPCCBL3009 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate CPCCBL3009 free