AHCLSC319 — Implement a retaining wall project
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for AHCLSC319 must cover
41 assessable components: 4 elements (21 performance criteria), 9 performance evidence and 9 knowledge evidence requirements, plus 2 foundation skills. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Prepare for retaining wall project
- 1.1Interpret plans and specifications
- 1.2Check if council permits or permissions are required
- 1.3Identify potential hazards and risks, and implement safe working practices to manage risks
- 1.4Identify equipment and material resource requirements according to scope of construction work
- 1.5Select tools and equipment required to implement a retaining wall project and check for safe operation
- 1.6Identify environmental impacts of proposed works and implement appropriate controls if required
- 1.7Select, fit, use and maintain personal protective equipment (PPE) applicable to task
- 1.8Organise delivery of materials to site according to workplace priorities
2 Set out and prepare the site
- 2.1Erect site bunting and place safety signage
- 2.2Determine, locate and mark out services from site plan
- 2.3Mark out position of the retaining wall
- 2.4Establish survey benchmarks
- 2.5Determine location and depth of excavations from construction plans
- 2.6Establish profiles to conform to designated tolerances
3 Construct retaining wall
- 3.1Check relevant tool and equipment specifications to ensure they are used safely
- 3.2Assemble or install retaining wall components according to plans and specifications
- 3.3Install appropriate drainage in accordance with plans and specifications
4 Check quality of work and clean-up site
- 4.1Inspect quality of finished works to ensure standard of finished retaining wall is in accordance with design drawings and specifications
- 4.2Clean up site, removed unused material and dispose of or recycle waste material from site
- 4.3Clean, maintain and store tools and equipment
- 4.4Identify and report unserviceable tools and equipment according to workplace procedures
Performance evidence
- interpreted site plans and specifications
- applied workplace health and safety requirements, including fitted and used personal protective equipment (PPE)
- selected, used and maintained tools and equipment required for implementing a retaining wall project
- calculated material and resource requirements
- established survey benchmarks
- excavated to specified soil levels
- used tools and equipment to construct retaining wall projects
- checked quality of work and cleaned up site
- reported unserviceable tools and equipment
Knowledge evidence
- principles and practices for implementing retaining wall projects, including:
- environmental impacts of landscape works
- landscape retaining wall materials and construction techniques
- legislative requirements and codes of practice relevant to implementing a retaining wall project
- local council permit requirements relevant to implementing a retaining wall project
- materials, equipment and machinery that may be required for the project
- methods and practices for maintaining and repairing retaining walls
- set out techniques
- workplace requirements applicable to health and safety in the workplace for implementing a retaining wall project, including appropriate use of PPE
Foundation skills
- Oral communication: Use clear language and industry standard terminology to report tool and equipment unserviceability
- Numeracy: Calculate quantities of material, take measurements, interpret and use scale, interpret and calculate levels Set out geometric shapes
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing AHCLSC319
What does an assessment tool for AHCLSC319 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for AHCLSC319 needs to address all 41 unit components: 4 elements with 21 performance criteria, 9 performance evidence requirements, 9 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for AHCLSC319?
Auditori pulls the current release of AHCLSC319 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for AHCLSC319 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing AHCLSC319 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of AHCLSC319, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- AHCLSC102 — Support landscape work
- AHCLSC206 — Assist with landscape construction work
- AHCLSC207 — Construct low-profile timber or modular retaining walls
- AHCLSC208 — Install aggregate paths
- AHCLSC209 — Lay paving
- AHCLSC210 — Install tree protection devices
- AHCLSC311 — Set out site for construction works
- AHCLSC312 — Construct brick and block structures and features
- AHCLSC313 — Construct stone structures and features, and install stone cladding
- AHCLSC314 — Implement a tree transplanting program
- AHCLSC315 — Implement an outdoor tiling project
- AHCLSC316 — Implement a paving project
Your AHCLSC319 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate AHCLSC319 free